1’-9"
4"
G R
O U
T
1 2
F
O
W A
S H
E
P L
A T
E
BY WILLIAMS FORM CORP. OR EQUAL
PROTECTION ANCHOR AS MANUFACTURED
PREGROUTED MCP3-MULTIPLE CORROSION
HOLE IN CONCRETE
6" DIA. DRILLED
AND DRILLED HOLE FOR ANCHOR
ENCAPSULATION PIPE O.D.
�" MIN. ANNULUS BETWEEN
CENTRALIZER
ENCAPSULATION PIPE
GROUT
ENCAPSULATION PIPE
(GRADE 150 KSI)
THREADED ASTM A722
PRE-GROUTED 1�" DIA.
PROTECTIVE CAP GUIDE
CORRUGATED PIPE CAP
PTI RECOMMENDED ANCHOR HEAD CAP
INHIBITING WAX
FILL WITH CORROSION
WASHER AS REQUIRED BY MANUFACTURER
ANCHOR HEAD NUT AND HARDENED
2�" DIA. HOLE
2" X 8" DIA. PLATE W/
TO INSTALLING ANCHOR HEAD CAP
CUT BAR WITH BLADE AS SHOWN PRIOR
PROTECTIVE CAP GUIDE
CORRUGATED PIPE CAP
ENCAPSULATION PIPE
(GRADE 150 KSI)
THREADED ASTM A722
PRE-GROUTED 1�" DIA.
HOLE IN CONCRETE
6" DIA. DRILLED
AND DRILLED HOLE FOR ANCHOR
ENCAPSULATION PIPE O.D.
�" MIN. ANNULUS BETWEEN
GROUT
BY WILLIAMS FORM CORP. OR EQUAL
PROTECTION ANCHOR AS MANUFACTURED
PREGROUTED MCP3-MULTIPLE CORROSION
PTI RECOMMENDED ANCHOR HEAD CAP
INHIBITING WAX
FILL WITH CORROSION
WASHER AS REQUIRED BY MANUFACTURER
ANCHOR HEAD NUT AND HARDENED
2�" DIA. HOLE
2" X 8" DIA. PLATE W/
TO INSTALLING ANCHOR HEAD CAP
CUT BAR WITH BLADE AS SHOWN PRIOR
F
W
S H
A T
O U
T
8" DIA. X 5" THICK W/ 2�" DIA. HOLE
LOAD CELL/ BEARING PLATE
CLOSED CELL NEOPRENE GASKET
2" THICK X 2�" I.D. 6�" O.D.
HEAT SHRINK SEAL
HEAT SHRINK SEAL
CENTRALIZER
ENCAPSULATION PIPE
HEAT SHRINK SEAL
CLOSED CELL NEOPRENE GASKET
2" THICK X 2�" I.D. 6�" O.D.
HEAT SHRINK SEAL
SMOOTH SLEEVE SMOOTH SLEEVE
1’-0"
GROUT
(9) 8000 PSI
FRAME
(3) SET
GROUT
(6) 8000 PSI
GROUT BASE PLATE
(4) 8000 PSI
EXCAVATION LINE
CONCRETE
(8) 3500 PSI
CONCRETE
(8) 3500 PSI
PULL TEST = 312 KIPS
(2) GROUT ANCHOR BAR TO 5000 PSI
CONSTRUCTION JOINT
CONCRETE
(5) 3500 PSI
ROD
(11) ANCHOR
LINE
EXCAVATION
(12) PIN
1’-0" 1’-9"
WATER STANDING
FRAME TO PREVENT
FROM BACKSIDE OF
SLOPE CONCRETE AWAY
F
R A
M E
A
F
R A
M E
B
(SEE SHEET 64W220-33)
(THIS SIDE ONLY)
AND BASE PLATE ASSEMBLY
COMPRESSION LOAD CELL "A"
211 KIPS
(7) PRESTRESS BARS
ANCHOR ROD
(9) SET
8000 PSI
(7) GROUT
8000 PSI
(4) GROUT BASE PLATE
8000 PSI
(5) GROUT
(3) SET FRAME
(10) SET PIN
EXCAVATION LINE
CONSTRUCTION JOINT
OPTIONAL
6"
PULL TEST TO 190 KIPS
(2) GROUT ANCHOR BOLTS TO 5000 PSI
OPTIONAL EXCAVATION LINE
LINE
EXCAVATION
128 KIPS
(6) PRESTRESS BARS
(SEE SHEET 64W220-33)
& BASE PLATE ASSEMBLY
COMPRESSION LOAD CELL "B"
FORM CORP. OR EQUAL
AS MANUFACTURED BY WILLIAMS
CORROSION PROTECTION ANCHOR
1�" DIA. PREGROUTED MCP3-MULTIPLE
LC PIN
F
C
M P
R E
S S
P L
A T
E
SCALE: 1 �"=1’-0"
M A
X
F
N
C H
O R
F U
N G
T H
C
T
M A
X
H O
N G
H
D
U
S
A
O
N G
T H
M A
X
H O
N G
S
A
O
N G
T H
C H
O R
F U
N G
T H
C
M A
X
SCALE: 1 �"=1’-0"
ANCHOR BAR "A"
F
M P
R E
S S
P L
A T
E
E P
O X
Y
A T
B
N G
S T
R E
S S
IN
N G
G
R O
U T
P O
A T
R E
P O
A T
N G
EL. 657’-10"
EL. 686’-2�"
S T
R E
S S
IN
N G
G
R O
U T
O
A T
R
EL. 658’-3"
EL. 686’-7�"
LC ANCHOR
1’-3"
CONSTRUCTION SEQUENCE.
NUMBER IN PARENTHESIS INDICATES
NOTE:
CONSTRUCTION SEQUENCE.
NUMBER IN PARENTHESIS INDICATES
NOTE:
EL. 686’ - 7�"
EL. 687’ - 7�"
EL. 692’ - 3�"
C ANCHOR "A"L
SCALE:
DO NOT ALTER MANUALLY
C.A.D. DRAWING
ISSUED BY:
R
TENNESSEE VALLEY AUTHORITY
FOSSIL AND HYDRO ENGINEERING
AUTOCAD R
DATE
PLOT FACTOR:
REVIEWED BY: APPROVED BY:
AS CONST
EXCEPT AS NOTED
NO.
REV.
DATE
R
R
DRWNDSGN CHKD RVWDSUPV APPD
PROJECT
ISSD
ID
CD
REV
DISCIPLINE
INTERFACE
US Army Corps of Engineers
Nashville District
SUBMITTED BY:
APPROVED BY:
P l o t i m e
P l o t a t e
F i l e a m e
T im e
D a t e
F il e
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF, ENGINEERING CONSTRUCTION DIVISION
H
F
G
E
3 4 5 6
D
C
B
A
2 3 4 5 6
7 8
REV NO.TASK COMPLETED BY:
F
E
7 8 9 10
D
C
B
11 12
A
C
W_TVA
--------0
XX
INITIAL ISSUE
CHICKAMAUGA PROJECT
CHIEF, CIVIL DESIGN BRANCH
US Army Corps of Engineers
Huntington District
SUBMITTED BY:
CHIEF, CIVIL DESIGN BRANCH
W. MILLER D.A.K.
A.B.C.
J.C.C.
64W220-27
UPPER MITER GATE ANCHORAGE REPLACEMENT
C 7 X
ANCHOR BARS &
CONCRETE PLACEMENT
DETAILS
JAN/17
CHICKAMAUGA LOCK FINAL SUBMITTAL
64W220-27
1 1/2" = 1’-0"
ANCHOR BAR "B"
DETAIL A
SCALE: 1 1/2 " = 1’-0" 64W220-26
DETAIL B
SCALE: 1 1/2 " = 1’-0" 64W220-26
3’’ 1’06’’9’’12’’
SCALE: 1 1/2’’=1’-0’’
GUDGEON PIN
11’-6" TO
EL. 692 - 3�"
EL. 687 - 7�"
EL. 686 - 2�"
EXCAVATION LINE
GUDGEON PIN
10’-6" TO
EL. 688’ - 2"
ALL MANUFACTURED ANCHOR COMPONENTS REQUIRE CERTIFICATE OF COMPLIANCE.8.
ANCHORS AS MANUFACTURED BY WILLIAMS FORM ENGINEERING CORP. OR EQUAL.
ANCHOR BARS SHALL BE PREGROUTED MCP3 - MULTIPLE CORROSION PROTECTION7.
PVC PIPE IS ASTM D1784 SCHEDULE 40 AND REQUIRES CERTIFICATE OF COMPLIANCE.6.
CENTRALIZERS SHALL BE LOCATED BY PTI GUIDELINES.5.
IN COMPLIANCE WITH PTI GUIDELINES.
PRESTRESSING NUTS AND ANCHOR HEAD CAP SHALL BE MANUFACTURER’S STANDARDS4.
SECTION. CERTIFIED MILL TEST REPORTS ARE REQUIRED.
PRESTRESSING BARS WITH 150 KSI MINIMUM TENSILE STRENGTH WITH 2.6 SQ.IN. CROSS
THREAD BAR MATERIAL SHALL COMPLY WITH ASTM A722 TYPE II (DEFORMED) 3.
SEE SHEETS 64W220-29 & 64W220-30 FOR BEARING PLATES, MATERIALS AND DETAILS.2.
OTHERWISE NOTED.
ROCK AND SOIL ANCHORS" BY THE POST TENSIONING INSTITUTE (PTI) UNLESS
IN ACCORDANCE WITH THE LATEST ISSUE OF "RECOMMENDATIONS FOR PRESTRESSING
MATERIALS, INSTALLATION AND TESTING FOR THREAD BARS SHALL BE 1.
C ANCHOR "B"L
EL. 688’ - 2"
ANCHOR BAR MATERIAL:
ANCHOR BAR INSTALLATION:
LOAD TO 32 KIPS.
190 KIPS EACH AND THEN TEST SIMULTANEOUSLY WHILE LIMITING THE DIFFERENTIAL
SEPERATELY, THE PAIR WILL BE TESTED SIMULTANEOUSLY. THE DIFFERENTIAL LOAD
PROOF TEST ANCHOR "A" BARS TO 312 KIPS EACH. AFTER TESTING EACH ANCHOR BAR 6.
BY THE GOVERNMENT, THE REMAINING ANCHORS IN THAT MONOLITH SHALL BE INSTALLED.
IN ACCORDANCE WITH PTI REC. AFTER ACCEPTANCE OF THE PERFORMANCE TEST RESULTS
THE FIRST ANCHOR BAR INSTALLED IN EACH MONOLITH SHALL BE PERFORMANCE TESTED5.
IS NO REQUIREMENT TO VERIFY THE LONG TERM COMPRESSIVE STRENGTH.
ONCE THE MINIMUM GROUT STRENGTH FOR POST TENSIONING HAS BEEN VERIFIED, THERE
EMBEDMENT. HIGHER STRENGTH GROUT MAY BE USED TO ATTAIN STRENGTH QUICKER.
BARS SHALL BE PULL TESTED WHEN THE GROUT REACHES 5000 PSI FOR ALL BARS AT ONE
GROUT WILL BE 5000 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS. ANCHOR
ANCHOR BAR GROUTING MATERIALS AND METHODS WILL BE PER PTI GUIDELINES. 4.
SPCIFIED IN THE CONTRACT SPECIFICATIONS.
WATERTIGHTNESS TESTING THE HOLE SHALL BE WATERPROOFED AND REDRILLED AS
ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. IF AN ANCHOR HOLE FAILS THE
AFTER ANCHOR HOLES HAVE BEEN DRILLED THEY SHALL BE WATERTIGHTNESS TESTED IN3.
BOND DEVELOPMENT LENGTH WITH A DRILLING TOLERANCE OF 1 HORIZ. TO 75 VERT.
HOLES FOR ANCHOR BARS SHALL BE PRECUSSION DRILLED AS SHOWN AT LEAST FOR THE 2.
LOCATION TOLERANCE OF ANCHOR BARS IS �" IN ANY DIRECTION.1.
JAMES A. NIZNIK KRISTEN L. SMITH NICOLE C. BERGER
JAN KLS NCB
6" DIA. DRILLED HOLE
IN CONCRETE
DETAIL C
SCALE: 1 1/2 " = 1’-0"
SOME ITEMS NOT SHOWN FOR CLARITY
NOTE:
C
| 64W220-27a |
| References |
| 64W220-27a.dgn, Default |
| Ref, 64W220-27a.dgn, Default |
| Ref-1, 64W220-27a.dgn, Default |
| Ref-3, 64W220-27a.dgn, Default |
| Ref-2, 64W220-27a.dgn, Default |
File details come from the government source that posted it. Updated .