Solicitation_Amendment_W912P425BA0140001 (1).pdf
PDF 4 MB Posted
- Attached to
- FY25 Maintenance Dredge - Fairport Harbor, OH
- Solicitation number
- W912P425BA014
About this file
This document is a Solicitation Amendment for the FY25 Fairport Harbor Dredging project in Grand River, Ohio, issued by the US Army Corps of Engineers Buffalo District. The amendment modifies Section 01 35 13 (Special Project Procedures) by removing the paragraph 3.1 'ACCEPTABLE EQUIPMENT', which previously specified clamshell dredging as the only acceptable method of dredging. The amendment provides updated submittal procedures, including sending National Dredging Quality Management Program submittals to the US Army Engineer District in Mobile, Alabama, and real estate agreements to the Detroit District. The document also outlines requirements for dredged material placement, including submission of a detailed Placement Plan and surveying the placement area prior to material placement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
W912P425BA0140001
• See updated specification on page 4 of this document.
AMENDMENT NO. 1
W912P425BA014
11 APRIL 2025
GRAND RIVER, OHIO FAIRPORT
HARBOR DREDGING
FY25
1. UPDATED SPECIFICATION
- SECTION 01 35 13 (SPECIAL PROJECT PROCEDURES)
The following changes have been made to the Specs.
1. Specification
a. Section 01 35 13 (SPECIAL PROJECT PROCEDURES)
(1) Paragraph 3.1 'ACCEPTABLE EQUIPMENT' has been removed.
FY25 FAIRPORT HARBOR DREDGING CERTIFIED FINAL - RTA
W912P425BA014
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 ACCEPTABLE EQUIPMENT
Clamshell dredging is the only acceptable method of dredging.
3.2 SUBMITTAL PROCEDURES
3.2.1 Procedures
a. Send National Dredging Quality Management Program submittals to the following office:
Department of the Army U.S. Army Engineer District, Mobile South Atlantic Division Silent Inspector (SI) Support Center 109 St. Joseph Street Mobile, AL 36602 Tel.: 1-(877) 840-8024 Fax.: (251) 694-3638
b. Send additional real estate agreements to the following office:
U.S. Army Corps of Engineers - Detroit District ATTN: 7th Floor Real Estate Division - McNamara Building 477 Michigan Avenue Detroit, Michigan 48226
3.2.2 Deviations
For submittals which include proposed deviations requested by the Contractor, check the column "variation" of ENG Form 4025. State, in writing, the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
3.3 ORDER OF WORK
Start dredging from the upper dredging limit and proceed downstream,unless directed differently by the Contracting Officer.
3.4 DREDGED MATERIAL PLACEMENT - UPLAND PLACEMENT SITE
a. See Section 01 20 00 for coordination requirements between the Contractor and the sediment placement facility operator.
b. Submit a detailed Placement Plan indicating what equipment and plant will be used for placement, how the material will be placed, and the sequence of placing the material by indicating how often the discharge location will be changed.
c. See sheet C-104 for placement requirements.
3.5 NEARSHORE PLACEMENT
Prior to the placement of any dredged material, survey the placement area
SECTION 01 35 13 Page 1026 02/18/25
H5TDDMA9
Cross-Out
| FY25 Fairport Dredge- Amendment 1 Summary (11Apr25).pdf |
| COVER PAGE |
| LIST OF UPDATES/CHANGES |
| UPDATED SECTION 01 35 13 |
| SHEET G-001 |
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0001 |
| EffDate: 16 APR 2025 |
| ReqNo: |
| ProjNo: TBD |
| IssCode: W912P4 |
| AdmCode: |
| IssuedBy: W072 ENDIST BUFFALO |
KO CONTRACTING DIVISION, 478 MAIN STREET
BUFFALO, NY 14202-0000
UNITED STATES
ANDREW HEWITT, EMAIL: ANDREW.B.HEWITT@USACE.ARMY.MIL TELEPHONE: 716-339-3307
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912P425BA014 |
| SolDate: 20 MAR 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE FOLLOWING CHANGES HAVE BEEN MADE TO THE SPECS. |
1. SPECIFICATION
A. SECTION 01 35 13 (SPECIAL PROJECT PROCEDURES)
(1) PARAGRAPH 3.1 'ACCEPTABLE EQUIPMENT' HAS BEEN REMOVED.
| ContNameTitle: |
| CoNameTitle: JEFFREY G. ERNEST |
| ContDate: |
| CODate: 16 APR 2025 |
File details come from the government source that posted it. Updated .