W912P424B0003 Amendment 0002.pdf

PDF 7 MB Posted

Attached to
Emerald Shiner Extension Project Federal contract opportunity
Solicitation number
W912P424B0003
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

This document is a solicitation amendment for the Emerald Shiner Extension Project. The U.S. Army Corps of Engineers Buffalo District is seeking bids for a firm-fixed price construction contract to perform repairs to the existing concrete bulkhead and install new baffle assemblies along approximately 700 feet of shoreline at Broderick Park in Buffalo, New York. The estimated construction cost is between $5,000,000 and $10,000,000. This is a full and open competition with a HUBZone 10% price evaluation preference. Bids must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) system by July 9, 2024. The notice to proceed is anticipated to be issued on or about September 20, 2024, with a performance period of 730 calendar days. The solicitation includes detailed drawings and specifications for the required concrete repairs, steel plate installation, grouting, and baffle assembly work.

View the file

Other files for this federal contract opportunity

Other files attached to Emerald Shiner Extension Project, newest first.
File Type Posted
Bid Abstract_Emerald Shiner.pdf PDF
Amendment 0003.pdf PDF
Emerald Shiner Pre-Bid Sign In Sheet.pdf PDF
W912P424B0003 Amendment 0001.pdf PDF
W912P424B0003_Emerald_Shiner_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Emerald Shiner Extension Project

The Government intends to aw ard one (1) f irm fixed price construction contract from this solicitation. The basis for aw ard w ill be low est total price.

Estimated Construction Cost is betw een $5,000,000 and $10,000,000.

NAICS Code: 237990, Other Heavy and Civil Construction, Size Standard $45.0M

Full and Open Competition. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.

The off icial solicitation is only available at PIEE and SAM. Bids w ill only be accepted though PIEE.

X

JENNA N GRAINER 716-954-1841

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

02-May-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________09 Jul 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

478 MAIN STREET

BUFFALO NY 14202-3278

W912P4

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 716.879.4173 TEL: FAX:

W912P424B0003 68

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is to notify that questions have been answ ered and can be view ed in ProjNet; To include the site visit log; To update the anticipated NTP date; To update bid opening meeting information; To include an updated Davis-Bacon Wage Determination for NY20240008;

To include the 2011 USACE Dive Report; and To include updated plans.

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P424B0003

X 9B. DATED (SEE ITEM 11)

02-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jun-2024

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

478 MAIN STREET

BUFFALO NY 14202-3278

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P424B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO BIDDERS

Section 00 21 13 – Instructions to Bidders

INSTRUCTIONS

PRE-BID SITE VISIT MEETING

The Site Visit will be May 30, 2024, at 1100am (ET). The project site is located at Broderick Park in Buffalo, New York. The project is limited to the existing bulkhead, located on the western side of the park.

To confirm attendance at the site visit, please contact Contract Specialist, Jenna Grainer at 716- 954-1841 or at jenna.n.grainer@usace.army.mil no later than May 29, 2024.

See FAR Provision 52.236-27. Prospective offerors are strongly encouraged to visit the project site prior to preparing and submitting any bid.

PROPOSAL SUBMISSION INSTRUCTIONS

Electronic Submission: Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/ . Proposals submitted by mail or hand carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the FAR. For instructions on how to post an offer, please refer to the Posting Offer demonstration:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by emailing the Contracting Officer, Tyrone B. Palaganas at tyrone.b.palaganas@usace.army.mil and/or the Contract Specialist, Jenna Grainer at jenna.n.grainer@usace.army.mil. If the Solicitation Module is down, the alternate method for proposal submission is via email to the Contracting Officer and Contract Specialist identified in the preceding sentence. The Offeror must obtain prior approval from the Contracting Officer or Contract Specialist to use the alternate submission method. Offeror requests to use the alternate submission method must be received by the Contracting Officer or Contract Specialist no later than 36 hours prior to the proposal submission deadline.

Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission. Electronic copies of each volume shall be compatible with Adobe Acrobat Reader 11. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., mailto:jenna.n.grainer@usace.army.mil https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf

MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties carefully ensure their electronic files adhere to the following naming convention:

W912P424B0003-FIRMNAME-Bid W912P424B0003-FIRMNAME-Amendments W912P424B0003-FIRMNAME-Bid Bonds

File Organization: Although hard copies are not accepted, each file shall be clearly indexed and logically assembled. Font size shall be 10 or larger.

Small Business Subcontracting Plan: Each Large Business Offeror shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9 DEV. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, AFARS 5119.705. Percentage goals apply to the total amount being subcontracted.

This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of bid receipt will be the upload completion / delivery time & date recorded within PIEE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g., 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Bidders are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 14.304.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas shall be unlocked).

Notes:

-All Bidders are reminded to complete and submit with their bid all FAR and DFARS Provisions related to Representations and Certifications.

-Bidders shall complete and submit any additional full text certifications that are included in the solicitation. An offeror may also complete the certifications at https://piee.eb.mil/ in lieu of completing the representations and certifications in this solicitation, provided that all the FAR and DFARS certifications contained in the solicitation have been completed online.

-Bidders shall be registered at https://sam.gov/ with the NAICS code listed on the front page of the solicitation prior to contract award.

-Bidders are reminded to fill in and sign the Standard Form 1442, from the front of the Solicitation, before bid submission. E-bids must be completely uploaded into https://piee.eb.mil/ by the date and time indicated in Block 13 on page 1.

BASIS OF SELECTION OF AWARD

Award shall be made to the lowest priced bidder who is found to be responsive and responsible.

See FAR Subpart 9.1, Responsible Prospective Contractors and FAR Provisions 52.214-19, Contract Award – Sealed Bidding – Construction, for more information.

REGISTRATION IN SAM

The System for Award Management (SAM) is the Government’s online database of federal contractors. Contractors self-register in SAM at the website https://sam.gov/. Registration is free to all users.

In accordance with FAR Provision 52.204-7 SYSTEM FOR AWARD MANAGEMENT, a bidder must be registered in SAM when submitting an offer and must continue to be registered until time of award, during performance, and through final payment of any contract.

Bidders who are not currently registered in SAM with the NAICS Code that is indicated in Block 10, at the front of this Solicitation, are encouraged to start the registration process as soon as possible to ensure that it is complete prior to submission of any bid.

See FAR Provision 52.204-7 for more information.

OFFEROR’S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Number is: W912P424B0003; The Bidder Inquiry Key is: 7WRFA3-S54AXH

Specific Instructions for ProjNet Bid Inquiry Access:

-From the ProjNet homepage linked above, click on Quick Add on the upper right side of the screen.

-Identify the Agency, this should be marked as USACE.

-Key: Enter the Bidder Inquiry Key as shown above.

-Email: Enter the email address you would like to use for communications.

-Agree to the Privacy & Security Notice.

-Select Continue, a page will then open stating a user account was not found and will ask you to create one using the provided form.

-Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Ensure to remember your Secret Question and Secret Answer as they will be used from this point on to access the ProjNet System.

-Select Add User. Once this is completed you will now be registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

-For future access to ProjNet, you will not be emailed a password. You will utilize your Secret Question and Secret Answer to log in.

-From the ProjNet homepage linked above, click on Quick Add on the upper right side of the screen.

-Identify the Agency, this should be marked as USACE.

-Key: Enter the Bidder Inquiry Key as shown above.

-Email: Enter the email address you used to register previously in ProjNet.

-Select Continue. A page will open asking you to enter the answer to your Secret Question.

-Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

-From this page you may view all bidder inquires or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is (833) 389-1097.

Notes:

-Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

-Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

-The ability to enter technical inquires and questions relating to proposal procedures or bonds will be disabled on June 14, 2024.

BID OPENING

A public Bid Opening will be conducted by teleconference, at the date and time indicated for receipt of bids/offers in Box 13 of the Standard Form 1442 at the front of this solicitation. The Bid Opening will be broadcast via live audio telephone conference. Interested parties may access the conference by using the Microsoft Teams information below. Callers may log into the conference up to 5 minutes before the stated time.

MICORSOFT TEAMS ACCESS INFORMATION:

Join from the meeting link (preferred) https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_5c226eaee8aa45c8824710ad495cb170%40thread.v2/0?context =%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7- 8f3163d27582%22%2c%22Oid%22%3a%228bde2fda-0196-4bfe-ada5- 1fe8fcc10bc2%22%7d

Meeting ID: 993 407 055 089 Passcode: qXHr9A

Join by phone (optional) +1 503-207-9433 Phone Conference ID: 879 793 729#

FACSIMILE BIDS/OFFERS NOT ACCEPTED

Facsimile bids/offers, modifications thereto, or cancellations of bid/offers will not be accepted.

AMENDMENTS

Acknowledgement of each amendment by the Bidder must be made in the space provided on the SF 1442, or by returning a signed copy of the amendment by the time set for receipt of bids.

Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective Bidders via the website https://piee.eb.mil/ .

NOTE: Failure to comply with the above instructions may result in an offeror not being eligible for award.

ATTENTION BIDDERS

https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_5c226eaee8aa45c8824710ad495cb170%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%228bde2fda-0196-4bfe-ada5-1fe8fcc10bc2%22%7d https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_5c226eaee8aa45c8824710ad495cb170%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%228bde2fda-0196-4bfe-ada5-1fe8fcc10bc2%22%7d https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_5c226eaee8aa45c8824710ad495cb170%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%228bde2fda-0196-4bfe-ada5-1fe8fcc10bc2%22%7d https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_5c226eaee8aa45c8824710ad495cb170%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%228bde2fda-0196-4bfe-ada5-1fe8fcc10bc2%22%7d https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_5c226eaee8aa45c8824710ad495cb170%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%228bde2fda-0196-4bfe-ada5-1fe8fcc10bc2%22%7d

In preparing your bid----

1. Have you signed the bid? Are all blank spaces filled in?

2. If signing on behalf of your company, have you attached evidence of your authority to sign the bid?

3. Have you acknowledged receipt of all amendments?

4. Have you checked your bid for possible errors? Arithmetically?

5. Have you furnished all information required by the invitation for bids and/or the specifications?

6. Are you submitting your bid on time?

7. As required by the invitation for bid, have you submitted a bid bond? Is it signed? Is it for the proper amount? Is it on the proper form? Electronic copy is required with Bid.

(End of Summary of Changes)

Controlled Unclassified Information (CUI) Only

Bid Inquiry Technical Evaluators Report Closed Inquiries

Project: Emerald Shiner Extension Project FY23 Review: Emerald Shiner Bidder Inquiry (00001) (sorted by CommentID ) Displaying 20 inquiries.

Id Discipline Sheet Detail Spec

10794294 Construction Management W912P424B0003_Emeral d_Shiner_Solicitatio n 252.236-7001 CONTRACT DRAWINGS AND

SPECIFICATIONS

Comment Classification: Controlled Unclassified Information (CUI)

On page 40 of the RFQ "W912P424B0003_Emera ld_Shiner_Solicitati on" in section 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000). Under section (e). When will the drawings and other documents below be made available? Thank you.

APP Checklist (Oct 2015).pdf, Eng_Form_4026.pdf, and NAA_FSLC Checklist(2016).pdf

On: May 06 2024. Forward request by email.

1-0 Evaluation For Information Only. Addressed in Amendment 0001. By: Jenna Grainer; CELRB-Admin & Advisory; (716-954-1841) On: Jun 14 2024 1-1 Government Response. Addressed in Amendment 0001. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836712 Hydrology G-002 Comment Classification: Controlled Unclassified Information (CUI)

Can the USACE provide any hydrographic information they have for the site?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation For Information Only. No additional information will be provided. Bid as shown. By: Jonathan Wilson; CELRB-Technical Services Division; (716-

581-1042) On: Jun 13 2024 1-1 Government Response. No additional information will be provided. Bid as shown. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836719 Specifications Section 01 57 19 3.1.1 Flow Ways Comment Classification: Controlled Unclassified Information (CUI)

Specification Section 01 57 19 3.1.1 Flow Ways states "Do not alter water flows." Will flow deflection devices for divers safety be allowed?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation Concurred. Amendment to be provided with updated Section 01 57 19 3.1.1. By: Jonathan Wilson; CELRB-Technical Services Division; (716-

581-1042) On: Jun 13 2024 1-1 Government Response. Amendment to be provided with updated Section 01 57 19 3.1.1 On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836727 Specifications Section 01 35 13 1.3.1.b

6/25/24, 11:03 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech 1/6 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=SpecText https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10794294 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10794294 mailto:Jenna.N.Grainer@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836712 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836712 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836719 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836719 mailto:Jonathan.R.Wilson@usace.army.mil

Comment Classification: Controlled Unclassified Information (CUI)

Specification Section 01 35 13 1.3.1.b Commencement states "The notice to proceed will be issued on or about 10 June 2024." Can the USACE review, and revise anticipated notice to proceed date?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation Concurred. Updated Notice to Proceed will be addressed in Amendment. By: Jenna Grainer; CELRB-Admin & Advisory; (716-954-1841) On:

Jun 14 2024 1-1 Government Response. Updated Notice to Proceed will be addressed in Amendment. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836730 Specifications Section 05 12 00 1.3 Comment Classification: Controlled Unclassified Information (CUI)

The major portion of this work is to be conducted by divers and by dive companies and it is not typical to have an AISC certification. Can the USACE consider removing the AISC certified erector from the specifications?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation Concurred. This will be addressed by an amendment. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 18

1-1 Government Response. This will be addressed by an amendment. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836748 Specifications Section 05 12 00 1.3 Comment Classification: Controlled Unclassified Information (CUI)

Would the USACE consider removing the AISC fabricator certification? This limits the number of fabricators and could save the USACE unnecessary fabrication costs.

On: Jun 03 2024. Forward request by email.

1-0 Evaluation For Information Only. No additional information will be provided. Bid as shown. By: Jonathan Wilson; CELRB-Technical Services Division; (716-

581-1042) On: Jun 13 2024 1-1 Government Response. No additional information will be provided. Bid as shown. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836801 Site G-002 Comment Classification: Controlled Unclassified Information (CUI)

Does the USACE have any previous dive inspections of the site they can provide?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation Concurred. Attachment to be provided in Amendment. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 18

1-1 Government Response. Attachment to be provided in Amendment. On: Jun 25 2024

Current Request Status: Request Closed

6/25/24, 11:03 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech 2/6 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836727 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836727 mailto:Jenna.N.Grainer@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836730 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836730 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836748 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836748 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836801 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836801

Information for this report is procurement sensitive.

10836809 Civil S-303 Comment Classification: Controlled Unclassified Information (CUI)

Item 12 Concrete Face Repairs. Please provide the anticipated square footage of concrete repairs. Can the USACE provide the minimum average sizes and depths of the repairs?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation For Information Only. See 03 01 00 3.1.1 for reference to repair depth. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-

1042) On: Jun 13 2024 1-1 Government Response. See 03 01 00 3.1.1 for reference to repair depth. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10836824 General S-202 Comment Classification: Controlled Unclassified Information (CUI)

Item 4 Steel Plate. Can the USACE please provide the locations of the plate repairs? Can the USACE please provide the quantity of each type of plate?

On: Jun 03 2024. Forward request by email.

1-0 Evaluation For Information Only. See page S-203 for schedule. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 13

1-1 Government Response. See page S-203 for schedule. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10840115 Specifications Section 00 21 13 Instructions to Bidders Comment Classification: Controlled Unclassified Information (CUI)

Being this is an IFB, do large businesses have to submit the small business subcontracting plan stated in the instructions to bidders?

On: Jun 05 2024. Forward request by email.

1-0 Evaluation For Information Only. Yes, large businesses must submit the small business subcontracting plan in accordance with the solicitation instructions.

By: Jenna Grainer; CELRB-Admin & Advisory; (716-954-1841) On: Jun 14 2024 1-1 Government Response. Yes, large businesses must submit the small business subcontracting plan prior to award in accordance with the solicitation instructions. On: Jun 25 2024 Current Request Status: Request Closed

Information for this report is procurement sensitive.

10840118 Specifications Section 00 21 13 Instructions to Bidders Comment Classification: Controlled Unclassified Information (CUI)

If a small business subcontracting plan is required, what is the USACE small business goal percentage and are there any socio-economic category goals?

On: Jun 05 2024. Forward request by email.

1-0 Evaluation For Information Only. For Fiscal Year 2024, the Buffalo District's Small Business percentage goals are as follows:

Small Business (SB) - 53.29%

6/25/24, 11:03 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech 3/6 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836809 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836809 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836824 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10836824 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10840115 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10840115 mailto:Jenna.N.Grainer@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10840118 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10840118

Small Disadvantaged Business (SDB) - 21.36% Service-Disabled Veteran-Owned Small Business (SDVOSB) - 0.21% HubZone - 6.50% Women Owned Small Business (WOSB) - 0.30% By: Jenna Grainer; CELRB-Admin & Advisory; (716-954-1841) On: Jun 18 2024

1-1 Government Response. For Fiscal Year 2024, the Buffalo District's Small Business percentage goals are as follows:

Small Business (SB) - 53.29% Small Disadvantaged Business (SDB) - 21.36% Service-Disabled Veteran-Owned Small Business (SDVOSB) - 0.21% HubZone - 6.50% Women Owned Small Business (WOSB) - 0.30% On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10843503 Building Design & Engineering S-203 G15 S-203 Comment Classification: Controlled Unclassified Information (CUI)

For the Type 2 Baffles should the mounting plates be 5/8"x24"x12" (as seen on S-305) or 5/8"x12"x6" (as seen in detail G15 sheet S-203)?

On: Jun 06 2024. Forward request by email.

1-0 Evaluation Concurred. See amendment to be provided. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 13 2024 1-1 Government Response. See amendment to be provided. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10843504 Engineering Support S-308 N/A S-308 Comment Classification: Controlled Unclassified Information (CUI)

What material/size is the support structure for the Type 4 baffle to be made from?

On: Jun 06 2024. Forward request by email.

1-0 Evaluation For Information Only. See "GENERAL SHEET NOTES" on Sheet C-308. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-

1042) On: Jun 13 2024 1-1 Government Response. See "GENERAL SHEET NOTES" on Sheet C-308. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10848000 Specifications C-104 G1 Section 01 35 13 3.2.2 Comment Classification: Controlled Unclassified Information (CUI)

Will exceptions be made for grout repairs that could potentially be located in critical root zones? Specifically sink hole grout repair from Station 4+00 - 4+50?

On: Jun 11 2024. Forward request by email.

1-0 Evaluation For Information Only. No additional information will be provided. Bid as shown. By: Jonathan Wilson; CELRB-Technical Services Division; (716-

581-1042) On: Jun 13 2024 1-1 Government Response. No additional information will be provided. Bid as shown. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

6/25/24, 11:03 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech 4/6 mailto:Jenna.N.Grainer@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10843503 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10843503 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10843504 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10843504 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10848000 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10848000

10848009 General S-301 A1

Detail A1 has a note "cracked and spalled concrete face to be repaired see sheet C-303". Can the USACE please review and revise as there is no sheet C-303.

On: Jun 11 2024. Forward request by email.

1-0 Evaluation Concurred. See amendment to be provided. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 13 2024 1-1 Government Response. See amendment to be provided. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10850860 General S-303 B1 & B11 Comment Classification: Controlled Unclassified Information (CUI)

Detail B1 notes existing fence to be removed and replaced, typ. Detail B11 notes existing fence to remain, typ. Please review and clarify if the fence is to remain in place or to be removed.

On: Jun 12 2024. Forward request by email.

1-0 Evaluation Concurred. See amendment to be provided. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 13 2024 1-1 Government Response. See amendment to be provided. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10853128 Civil S-304 A1 Comment Classification: Controlled Unclassified Information (CUI)

Are bulkheads allowed for concrete pouring behind the steel plates? If yes is there a maximum or minimum allowable spacing?

On: Jun 13 2024. Forward request by email.

1-0 Evaluation For Information Only. Bid as shown. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 14 2024 1-1 Government Response. Bid as shown. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10853138 Civil S-303 B11 Comment Classification: Controlled Unclassified Information (CUI)

Sheet S-303 Detail B11 notes construction joint for concrete face repair. Is the intent to have the concrete face repairs completed in separate lifts? Can the contractor pour the tremie concrete and concrete face repair area in a single vertical lift?

On: Jun 13 2024. Forward request by email.

1-0 Evaluation For Information Only. Bid as shown on plan. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 14 2024 1-1 Government Response. Bid as shown on plan. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10853145 Civil S-304 A1

6/25/24, 11:03 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech 5/6 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10848009 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10848009 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10850860 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10850860 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853128 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853128 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853138 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853138

The drawings do not indicate any rebar/dowels in the tremie concrete repair area. Is there any required? If yes, what size and spacing?

On: Jun 13 2024. Forward request by email.

1-0 Evaluation For Information Only. Bid as shown on plan. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 14 2024 1-1 Government Response. Bid as shown on plan. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

10853153 General S-304 & S-305 A1 Comment Classification: Controlled Unclassified Information (CUI)

Sheet S-304 and S-305 Detail A1 both reference 1.25" Dia. Lag Screw 2' long. How does the USACE intend for these to be installed with limited space behind the baffle?

On: Jun 13 2024. Forward request by email.

1-0 Evaluation Concurred. This will be addressed by an amendment. By: Jonathan Wilson; CELRB-Technical Services Division; (716-581-1042) On: Jun 14

1-1 Government Response. This will be addressed by an amendment. On: Jun 25 2024

Current Request Status: Request Closed Information for this report is procurement sensitive.

Report Complete

Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.

6/25/24, 11:03 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllTech 6/6 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853145 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853145 mailto:Jonathan.R.Wilson@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853153 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10853153 http://projnet.com/index.php

The following changes have been made to the Plans and Specifications.

1. Plans

a. Updated plate call-out on Detail G15/S-203 and A1/S-305 to match plate dimensions.

b. Updated the reference in Detail A1/S-301.

c. Updated the callout in Details B1&B11/S-303.

d. Updated BAFFLE TYPE 1 & TYPE 3 connection details.

i. G9/S-203

ii. F1/S-204

iii. A1/S-304

iv. K1&F1/S-501

v. E1/S-502

vi. D1/S-504

2. Specifications

a. Updated the “Notice to Proceed” date in Section 01 35 13 1.3.1.b.

b. Updated section 01 57 19 3.1.1 “Flow Ways”.

c. Removed Section 05 12 00 1.4.1.1 “Erection and Erection Bracing Drawings.”

d. Included attachments at end of specifications:

i. Broderick Park Dive Report from 2012.

Emer al d Shi ner CERTI FI ED FI NAL - RTA

SECTI ON 01 35 13

SPECI AL PROJECT PROCEDURES

11/ 20, CHG 1: 02/ 22

PART 1 GENERAL

1. 1 DEFI NI TI ONS

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Heavy Equi pment and Vehi c l e Li st

Const r uct i on Oper at i ons Pl an

Wat er cr af t Li st

1. 3 PERFORMANCE PERI OD AND RESTRI CTI ONS

Per f or m al l wor k i n a manner t hat does not af f ect t he st abi l i t y of t he exi st i ng t i mber cr i b under t he exi st i ng st one.

1. 3. 1 Commencement

a. Compl et e t he wor k i n accor dance wi t h t he mi l est one schedul e bel ow. The t i me st at ed f or compl et i on i ncl udes f i nal c l ean- up of t he pr emi ses.

Mi l est one Maxi mum Cal endar Days Af t er _Recei pt of Not i ce t o Pr oceed

Compl et e al l Wor k 730

b. The Not i ce t o Pr oceed wi l l be i ssued on or about 20 Sept ember 2024.

c. The t i me t o compl et e t he wor k i ncl udes a no i n- wat er wor k per i od f r om 15 Apr i l t o 30 June of each year . I n- wat er wor k i s def i ned as any wor k i nvol v i ng t he pl acement of obj ect s or f i l l mat er i al under wat er , or t he movement and r el ocat i on of mat er i al s t hat ar e under wat er .

1. 3. 2 Schedul e of Wor k

Submi t a compl et e schedul e of wor k cover i ng t he per i od of t i me f r om t he Not i ce of Awar d t hr ough t he speci f i ed dur at i on of t he cont r act t o t he Cont r act i ng Of f i cer wi t hi n 10 cal endar days of r ecei pt of t he Not i ce of Awar d. I ncl ude wor k schedul es i n t he pl an, and not i f y t he Cont r act i ng Of f i cer at l east 48 hour s i n advance of changes i n wor k schedul es. Pr ovi de a pl an f or t he coor di nat i on of const r uct i on act i v i t i es i ndi cat ed i n t he

SECTI ON 01 35 13 Page 1058 06/ 18/ 24

H5TDDMA9

Highlight

H5TDDMA9

Highlight

H5TDDMA9

Highlight

EMERALD SHINER EXTENSION PROJECT CERTIFIED FINAL/RTA

PART 3 EXECUTION

3.1 PROTECTION OF NATURAL RESOURCES

Minimize interference with, disturbance to, and damage to fish, wildlife, and plants, including their habitats. Prior to the commencement of activities, consult with the Installation Environmental Office, regarding rare species or sensitive habitats that need to be protected. The protection of rare, threatened, and endangered animal and plant species identified, including their habitats, is the Contractor's responsibility.

Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work that is consistent with the requirements of the Installation Environmental Office or as otherwise specified.

Confine construction activities to within the limits of the work indicated or specified.

3.1.1 Flow Ways

3.2 SURFACE AND GROUNDWATER

3.2.1 Waters of the United States

3.3 AIR RESOURCES

Equipment operation, activities, or processes will be in accordance with 40 CFR 64 and state air emission and performance laws and standards.

3.4 WASTE MANAGEMENT AND DISPOSAL

3.4.1 Waste Determination Documentation

Complete a Waste Determination form (provided at the pre-construction conference) for Contractor-derived wastes to be generated. All potentially hazardous solid waste streams that are not subject to a specific exclusion or exemption from the hazardous waste regulations (e.g., scrap metal, domestic sewage) or subject to special rules, (lead-acid batteries and precious metals) must be characterized in accordance with the requirements of 40 CFR 261 or corresponding applicable state or local regulations. Base waste determination on user knowledge of the processes and materials used, and analytical data when necessary.

Consult with the Installation environmental staff for guidance on specific requirements. Attach support documentation to the Waste Determination form. As a minimum, provide a Waste Determination form for the following waste (this listing is not inclusive): oil- and latex -based painting and caulking products, solvents, adhesives, aerosols, petroleum products, and

SECTION 01 57 19 Page 1144 4/17/2024

Do not enter, disturb, destroy, or allow discharge of contaminants into waters of the United States except as authorized herein. The protection of waters of the United States shown on the drawings in accordance with paragraph LICENSES AND PERMITS is the Contractor's responsibility.

Authorization to enter specific waters of the United States identified does not relieve the Contractor from any obligation to protect other waters of the United States within, adjacent to, or in the vicinity of the construction site and associated boundaries.

Do not permanently alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as specified and permitted.

H5TDDMA9

Highlight

Emer al d Shi ner CERTI FI ED FI NAL - RTA

Bol t s, Nut s, and Washer s

Wel d I nspect i on Repor t s

Di r ect Tensi on I ndi cat or Washer I nspect i on Repor t s

Bol t Test i ng Repor t s

SD- 07 Cer t i f i cat es

St eel

Bol t s, Nut s, and Washer s

Wel di ng Pr ocedur es and Qual i f i cat i ons

Wel di ng El ect r odes and Rods

Cer t i f i ed Wel di ng I nspect or

NDT Techni c i an

Wel di ng Pr ocedur e Speci f i cat i ons ( WPS)

Ai sc St r uct ur al St eel Er ect or Qual i t y Cer t i f i cat i on

Ai sc St r uct ur al St eel Fabr i cat or Qual i t y Cer t i f i cat i on

1. 3 AI SC QUALI TY CERTI FI CATI ON

Wor k must be f abr i cat ed by an AI SC Cer t i f i ed St r uct ur al St eel Fabr i cat or , i n accor dance wi t h AI SC 207, Cat egor y BU. Submi t AI SC St r uct ur al St eel Fabr i cat or qual i t y cer t i f i cat i on.

Wor k must be er ect ed by an AI SC St r uct ur al St eel Cer t i f i ed Er ect or , i n accor dance wi t h AI SC 207, Cat egor y CSE. Submi t AI SC St r uct ur al St eel er ect or qual i t y cer t i f i cat i on.

1. 4 QUALI TY ASSURANCE

1. 4. 1 Fabr i cat i on Dr awi ng Requi r ement s

Submi t f abr i cat i on dr awi ngs f or appr oval pr i or t o f abr i cat i on. Pr epar e i n accor dance wi t h AI SC 303, AI SC 326 and AI SC 325. Fabr i cat i on dr awi ngs must not be r epr oduct i ons of cont r act dr awi ngs. Si gn and seal f abr i cat i on dr awi ngs by a r egi st er ed pr of essi onal engi neer i n t he st at e of New Yor k.

I ncl ude compl et e i nf or mat i on f or t he f abr i cat i on and er ect i on of t he st r uct ur e' s component s, i ncl udi ng t he l ocat i on, t ype, and si ze of bol t s, wel ds, member s i zes and l engt hs, connect i on det ai l s, bl ocks, copes, and cut s. Use AWS A2. 4 st andar d wel di ng symbol s. Shor i ng and t empor ar y br aci ng must be desi gned and seal ed by a r egi st er ed pr of essi onal engi neer and submi t t ed f or r ecor d pur poses, wi t h cal cul at i ons, as par t of t he dr awi ngs. Cl ear l y hi ghl i ght any devi at i ons f r om t he det ai l s shown on t he cont r act dr awi ngs hi ghl i ght ed on t he f abr i cat i on dr awi ngs. Expl ai n t he r easons f or any devi at i ons f r om t he cont r act dr awi ngs.

1. 4. 2 GOVERNMENT I NSPECTI ONS

Fol l ow t he r equi r ement s pr ovi ded i n sect i on 01 35 13 SPECI AL PROJECT

SECTI ON 05 12 00 Page 1205 06/ 18/ 24

E1

SCALE: 1"=1'-0"

PLATE REPAIR ELEVATION- TYPE 3

9'-6", TYP.

T Y

P

T Y

P

T Y

P

4'-0"4'-0"6"

BAFFLE ELEVATION- TYPE 1

G9

BAFFLE ELEVATION- TYPE 2

G15

1/2" BENT PLATE BAFFLE

PL 5/8"X18"X10", TYP

ASTM A325 BOLTS, TYP.

HOLE FOR 3/4" DIA.

A193 THREADED RODS, TYP.

HOLE FOR 1.25" DIA. ASTM

PL 5/8"X18"X12", TYP

4'-11", TYP.

4'-11", TYP.

SEE S-204 FOR SPACING

B7 THREADED ROD, TYP..

HOLES FOR ASTM A193

T Y

P

T Y

P

A

P P

R O

X T

Y P

ANCHORS, TYP.

HOLES FOR UNDERCUT

SEE S-204 FOR SPACING

B7 THREADED ROD, TYP.

HOLES FOR ASTM A193

T Y

P

T Y

P

T Y

P

2'-0"

4'-9" 2'-0"

T

Y P

-0

T

Y P

3",TYP.

3", TYP.3", TYP.

6", TYP.

T Y

P

T Y

P

T Y

P

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP