Bid Abstract W912P422B0003.pdf
PDF 257 KB Posted
- Attached to
- FY22 Buffalo North Breakwater Repair
- Solicitation number
- W912P422B0003
About this file
This is an abstract of bids received in response to a solicitation for the Buffalo Harbor North Breakwater Repair South Head and Middle Reach project. The solicitation was issued by the U.S. Army Corps of Engineers Engineering District Buffalo and sought bids to complete concrete and stone breakwater repair work including mobilization and demobilization, record drawings, concrete and stone removals and placements, navigation light installation, and removal of existing concrete walls. Three bids were received by the July 6th response deadline from Great Lakes Dock And Materials, L.L.C., Morrish Wallace Construction, Inc. d/b/a Ryba Marine Construction Co., and the government estimate. Bid prices ranged from $5,066,353.98 to $5,351,529.60 including options. The abstract provides itemized pricing for 16 base items and 2 options from each bidder. Award is pending review by the contracting officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BUF N BW_W912P422B0003_RTA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 2 Pages
DATE
ITEM DESCRIPTION OF OFFERED ITEM EST.
QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
Mobilize / Demobilize (incl. Before Survey)
1 JA 427,425.00$ 763,570.00$ 463,550.80$
Record (As-built) Drawings (including photographs)
1 JA 28,755.00$ 27,500.00$ 12,774.00$
3 Precast Concrete Block Removal 279 EA 399.60$ 111,488.40$ 823.30$ 229,700.70$ 327.11$ 91,263.69$
South Head Fallen Concrete Removal and Off-site Disposal
1 JA 103,055.00$ 95,480.00$ 469,764.06$
5 Armor Stone 11090 TN 207.50$ 2,301,175.00$ 182.30$ 2,021,707.00$ 192.84$ 2,138,595.60$ 6 Underlayer Stone 5220 TN 180.30$ 941,166.00$ 167.90$ 876,438.00$ 194.21$ 1,013,776.20$ 7 Bedding Stone 3633 TN 145.25$ 527,693.25$ 131.50$ 477,739.50$ 64.12$ 232,947.96$
Concrete for Navigation Light Foundation
23 CY 1,745.45$ 40,145.35$ 4,030.80$ 92,708.40$ 1,603.89$ 36,889.47$
9 Navigation Light Installation 1 JA 14,530.00$ 19,558.00$ 18,892.03$ Subtotal Items 3–9 4,039,253.00$ 3,813,331.60$ 4,002,129.01$
Concrete Removals (In-place and Fallen Pieces, any Existing Transverse Walls) and Off-site Disposal
1 JA 102,286.00$ 151,300.00$ 153,156.77$
Precast Concrete Block Placement (Blocks from South Head)
120 EA 451.10$ 54,132.00$ 652.70$ 78,324.00$ 362.62$ 43,514.40$
Subtotal Items 10–11 156,418.00$ 229,624.00$ 196,671.17$
Buffalo Harbor North Breakwater Repair South Head and Middle Reach
W912P4
1775 NIAGARA STREET
BUFFALO NY 14207-3199
Great Lakes Dock And Materials, L.L.C.
Morrish Wallace Construction, Inc.
d/b/a Ryba Marine Construction Co.
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
GOVERNMENT ESTIMATE
SOLICITATION NUMBER
W912P422B0003
DATE OPENED
2-Jun-2022 6-Jul-2022 NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Jeffrey G. Ernest, Contracting Officer
SIGNATURE
ABSTRACT OF OFFERS - CONSTRUCTION
OFFEROR NO. 1 OFFEROR NO. 2
DATE ISSUED
PROJECT TITLE
ISSUING OFFICE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
Sta. 0+00–1+75
Sta. 11+25–12+00
26 Jul 2022
Page 2 of 2 Pages
DATE
ITEM DESCRIPTION OF OFFERED ITEM EST.
QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
Buffalo Harbor North Breakwater Repair South Head and Middle Reach
W912P4
1775 NIAGARA STREET
BUFFALO NY 14207-3199
Great Lakes Dock And Materials, L.L.C.
Morrish Wallace Construction, Inc.
d/b/a Ryba Marine Construction Co.
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
GOVERNMENT ESTIMATE
SOLICITATION NUMBER
W912P422B0003
DATE OPENED
2-Jun-2022 6-Jul-2022 NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Jeffrey G. Ernest, Contracting Officer
SIGNATURE
SEE PAGE 1
ABSTRACT OF OFFERS - CONSTRUCTION
OFFEROR NO. 1 OFFEROR NO. 2
DATE ISSUED
PROJECT TITLE
ISSUING OFFICE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
Middle Reach Concrete Removals (In-place and Fallen Pieces, any Existing Transverse Walls) and Off-site Disposal
1 JA 197,359.00$ 302,600.00$ 295,143.04$
Precast Concrete Block Placement (Blocks from South Head)
148 EA 504.90$ 74,725.20$ 652.70$ 96,599.60$ 294.01$ 43,513.48$
Retrieval of On-Shore Precast Concrete Blocks and Placement
92 EA 728.45$ 67,017.40$ 652.70$ 60,048.40$ 571.44$ 52,572.48$
Subtotal Items 12–14 339,101.60$ 459,248.00$ 391,229.00$
Subtotal Items 1–14 4,990,952.60$ 5,293,273.60$ 5,066,353.98$
Middle Reach Removal of Remaining Portions of Existing Lakeside Concrete Wall and Off-site Disposal
1 JA 104,399.00$ 19,419.00$ 50,981.20$
Middle Reach Removal of Remaining Portions of Existing Lakeside Concrete Wall and Off-site Disposal
1 JA 147,899.00$ 38,837.00$ 148,251.49$
Total Items 1–16 5,243,250.60$ 5,351,529.60$ 5,265,586.67$
Option B Sta. 13+00–14+50
Sta. 13+00–14+50
Option A Sta. 11+25–12+00
OF 1419