Amendment_01_Solicitation_Package_Maumee_Bay_W912P420B00010001.pdf

PDF 791 KB Posted

Attached to
Maumee Bay Dredging
Solicitation number
W912P420B0001
Issued by

About this file

This document package includes a solicitation and amendments for the Maumee Bay dredging project. The U.S. Army Corps of Engineers is seeking bids for maintenance dredging of approximately 400,000 cubic yards of material from Toledo Harbor in Maumee Bay, with placement of dredged materials either in an open lake placement site furnished by the government, or in a contractor-furnished placement site. Bids are due via the DOD SAFE electronic submission system by the date specified in the solicitation. The contract will be awarded to the lowest priced responsive and responsible bidder for either schedule A involving open lake placement, or schedule B involving contractor-furnished placement. The notice to proceed will be issued on or around July 15, 2020 and all work must be completed within the environmental dredging window which runs from July 1 to March 15. Amendments provide updated bid forms, specifications, and wage determinations.

View the file

Other files

File Type Posted
Solicitation_Package_Maumee_Bay_W912P420B0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY20 Maumee Bay Maintenance Dredging:

1. This Amendment is issued to change the process for submitting Bids. All Bids SHALL only be submitted electronically by using the SAFE system, refer to Section 00 21 13, Instruction to Bidders for guidence.

2. Update the Wage Determination to WD IL20200018 06March 2020 from WD IL20200018 10January 2020.

3. Referense Changes on the follow ing solicitation docuements:

a. Bid Form

b. Section 01 35 13 Section 1.2 NTP to be issued on or about 07/15/2020.

4. All other terms, conditions, requirments, clauses remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P420B0001

X 9B. DATED (SEE ITEM 11)

13-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Apr-2020

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P420B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been deleted:

BIDDING SCHEDULE

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

INSTRUCTION TO BIDDERS

The following have been modified:

I NSTRUCTIONS

Bids: A LL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED E LECTRONICALLY. Hand carried delivery or USPS/UPS/FEDEX delivery of hard copies and or CD-ROMs are not authorized. Facsimile submission is not authorized.

E lectronic Proposal Submission is required through the Army’s Electronic File Sharing S ervice, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE.

Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php).

Instructions for uploading are as follows:

1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your bid. This will need to be completed WITHIN five (5) days of the proposal due date, but no later than one day prior to the proposal due date. The contact information for the Contracting Officer, Walter Kamad is Walter.Kamad@usace.army.mil and Contract Specialist, Peter Gembala is Peter.R.Gembala@usace.army.mil.

2. You will receive an email with the link to submit your drop-off.

3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter W912P420B0001-FIRMNAME.

4. Click Upload button to send documents.

5. Guest users will need to check their email to verify their email address before the recipients will be notified. No additional action is required by CAC users.

File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files mailto:Peter.R.Gembala@usace.army.mil down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912P420B0001-FIRMNAME-Bid W912P420B0001-FIRMNAME-Amendments W912P420B0001-FIRMNAME-Bid Bonds

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of bid receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Bidders are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 14.304.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

1. INTENT

The intent of this solicitation is to award one (1) firm fixed-price construction contract for the FY20 Detroit River Maintenance Dredging requirement.

2. BASIS OF SELECTION OF AWARD

A. Award shall be made to the lowest priced bidder who is found to be responsive and responsible. See FAR Subpart 9.1, Responsible Prospective Contractors and FAR Provision 52.214-19, Contract Award—Sealed Bidding—Construction, for more information.

B. In accordance with FAR Provision 52.217-5, the Government intends to evaluate bids for award purposes by adding the total price for all options to the total price for the basic requirement.

3. SITE VISIT

There is no scheduled site visit for this project.

4. REGISTRATION IN SAM

A. The System for Award Management (SAM) is the Government’s online database of federal contractors. Contractors self-register in SAM at the website www.sam.gov. Registration is free to all users.

B. In accordance with FAR Provision 52.204-7 SYSTEM FOR AWARD MANAGEMENT, a bidder must be registered in SAM when submitting an offer, and must continue to be registered until time of award, during performance, and through final payment of any contract.

C. Bidders who are not currently registered in SAM with the NAICS Code that is indicated in Block 10, at the front of this Solicitation, are encouraged to start the registration process as soon as possible to ensure that it is complete prior to submission of any bid.

D. See FAR Provision 52.204-7 for more information.

5. REQUESTS FOR INFORMATION

A. Questions/Inquiries. All questions pertaining to this requirement shall be submitted in writing no later than, April 08, 2020, 10 A.M. Eastern Time. The offeror shall put the solicitation number located in Block 1 of the SF 1442 followed by QUESTIONS in the subject line of the email. All questions received after the above date and time WILL NOT

BE ANSWERED.

B. Questions shall be submitted to Contracting Officer, Walter Kamad is Walter.Kamad@usace.army.mil and Contract Specialist, Peter Gembala is Peter.R.Gembala@usace.army.mil.

C. Once all inquiries are compiled and addressed, the questions and answers will be generated as an amendment and posted to the beta.sam.gov website for all interested parties to view/acknowledge to be sent in with their submission prior to the closing date.

If additional time is needed for submission, this extension will be executed on the same amendment as the questions and answers amendment.

6. SUBMISSION OF BIDS

A. All Bidders are reminded to complete and submit with your bid all FAR and DFARS Provisions related to Representations and Certifications.

B. Bidders shall complete and submit any additional full text certifications that are included in the solicitation. An offeror may also complete the certifications at h ttps://www.sam.gov in lieu of completing the representations and certifications in this solicitation provided that all the FAR and DFARS certifications contained in the solicitation have been completed on line.

C. All Bidders shall be registered at h ttps://www.sam.gov with the NAICS code that is shown on the front page of the solicitation prior to contract award.

D. Remember to fill in and sign the Standard Form 1442, from the front of the

Solicitation, before submitting your bid.

E. Bidders should note that because there may not be personnel available to inspect the original bonds, the Kos (or COS) may call the bonding company to verify the information in the Bid bond..

1. BID OPENING

Due to health concerns regarding Novel Coronavirus National Emergency, a http://www.sam.gov/ mailto:Peter.R.Gembala@usace.army.mil http://www.sam.gov/ http://www.sam.gov/ public Bid Opening will be conducted via teleconference, at the date and time indicated for receipt of bids/offers in Box 13 of the Standard Form 1442 at the front of this solicitation. The Bid Opening will be broadcast via live audio telephone conference. Interested parties may access the conference by calling one of the following numbers and entering the access code when prompted. Callers may log into the conference up to 5 minutes before the stated time.

A UDIO CONFERENCE ACCESS INFORMATION:

USA Toll-Free: 888-675-2535

ACCESS CODE:

4776889

SECURITY CODE: 1234

9. FACSIMILE BIDS/OFFERS NOT ACCEPTED

Facsimile bids/offers, modifications thereto, or cancellations of bid/offers will not be accepted.

10. AMENDMENTS

Acknowledgement of each amendment by the Bidder must be made in the space provided on the SF 1442, or by returning a signed copy of the amendment by the time set for receipt of bids. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective Bidders via the website. For security reasons all potential Bidders, plan rooms and printing companies are required to register in SAM at w ww.sam.gov.

NOTE: Failure to comply with the above instructions may result in an offeror not being eligible for award.

(End of Summary of Changes)

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

0001 Modifications to Bid submittal process. All RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTONICALLY.H and carried delivery or USPS/UPS/FEDEX delivery of hard copies and or CD-ROMS are not authorized. Facsimile submission is not authorized. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). All Bidders that are requesting SAFE links are to send an email request to Peter Gembala at Peter.R.Gembala@usace.army.mil and Walter Kamad at Walter.Kamad@usace.army.mil .

0001 Replace WD IL20190018 Dated 01/10/2020 with attached Wage Determination WD

IL20200018 03/06/2020.

https://safe.apps.mil/about.php mailto:Peter.R.Gembala@usace.army.mil mailto:Walter.Kamad@usace.army.mil

0001 Replace current Bid Form with attached Bid Form Dated 25 March 2020.

0001 Update Section 01 35 13, Paragraph 1.2 b. with attached information Dated 25 March 2020.

(End of Clause)

The following have been deleted:

INSTRUCTION TO BIDDERS

(End of Summary of Changes)

SECTION 00 10 00

SOLICITATION AND BIDDING SCHEDULE

BIDDING SCHEDULE "A"

Bid will be based upon dredging material from Toledo Harbor (Maumee Bay) and placement of dredged material in the Government-furnished Open Lake Placement Site, as shown on the contract drawings, in accordance with these specifications.

Item No. Description

Estimated Quantity

Unit Unit Price

Estimated Amount

1 Mobilization and Demobilization 1 JA $

2 Maintenance Dredging w/placement in

Government-furnished Open Lake Site: Sta. 315+00 ~ 430+00

300,000

CY $

Total Estimated Amount (Items 1 through 2) $

OPTION "A"

3 Maintenance Dredging w/placement in

100,000

CY $ $

Total Estimated Amount (Items 1 through 3) $

Note 1: Bidders are required to propose to all schedules. The contracting officer will determine an offer unresponsive for failure to bid on all schedules. The Government reserves the right to make award to the lowest bidder (base + any options) on "Schedule A" or Schedule "B", based on needs of the Government.

Note 2: The Government will evaluate offers for award purposes by adding the total price for the option to the total price for the basic requirement. Evaluation of the option will not obligate the Government to exercise the option.

Note 3: The Government may elect to exercise the option, or not to exercise the option. If the option item is exercised, the Government reserves the right to limit the quantity of material up to the estimated quantity of the option item. Additionally the Government may elect to exercise the option at any time between the contract award date and September 2, 2020..

BIDDING SCHEDULE "B"

Bid will be based upon dredging material from Toledo Harbor (Maumee Bay) and placement of dredged material in a Contractor-furnished Placement Site, in accordance with these specifications.

Item No. Description

Estimated Quantity

Unit Unit Price

2 Maintenance Dredging w/placement in Contractor-furnished Placement

3 Maintenance Dredging w/placement

Note 2: The Government will evaluate offers for award purposes by adding the total price for the option to the total price for the basic requirement. Evaluation of the option will not obligate the Government to exercise the option.

Note 3: The Government may elect to exercise the option, or not to exercise the option. If the option estimated quantity of the option item. Additionally the Government may elect to exercise the option at any time between the contract award date and September 2, 2020.

AMENDMENT NO. 1

TOLEDO, OHIO

TOLEDO HARBOR

MAUMEE BAY DREDGING

UPDATE BID FORMS AND

SPECIFICATIONS

25 MARCH 2020

FY20 MAUMEE BAY DREDGE W912P420B0001

AMENDMENT NO. 1

The following changes are made to the solicitation documents:

1. Bid Form

On both schedules, the third sentence in Note 3 is changed from:

Additionally, the Government may elect to exercise the option within 60 calendar days of the Notice To Proceed.

to

Additionally the Government may elect to exercise the option at any time between the contract award date and September 2, 2020.

2. Section 01 35 13

Paragraph 1.2 b. is changed from:

b. The Notice to Proceed will be issued on or about 05/15/2020.

to

b. The Notice to Proceed will be issued on or about 07/15/2020.

3. Both items are attached for reference.

BIDDING SCHEDULE "A"

Bid will be based upon dredging material from Toledo Harbor (Maumee Bay) and placement of dredged material in the Government-furnished Open Lake Placement Site, as shown on the contract drawings, in accordance with these specifications.

Item No. Description

Estimated Quantity

Unit Unit Price

2 Maintenance Dredging w/placement in

3 Maintenance Dredging w/placement in

Note 2: The Government will evaluate offers for award purposes by adding the total price for the option to the total price for the basic requirement. Evaluation of the option will not obligate the Government to exercise the option.

Note 3: The Government may elect to exercise the option, or not to exercise the option. If the option estimated quantity of the option item. Additionally the Government may elect to exercise the option at any time between the contract award date and September 2, 2020..

BIDDING SCHEDULE "B"

Bid will be based upon dredging material from Toledo Harbor (Maumee Bay) and placement of dredged material in a Contractor-furnished Placement Site, in accordance with these specifications.

Item No. Description

Estimated Quantity

Unit Unit Price

2 Maintenance Dredging w/placement

3 Maintenance Dredging w/placement

Note 2: The Government will evaluate offers for award purposes by adding the total price for the option to the total price for the basic requirement. Evaluation of the option will not obligate the Government to exercise the option.

Note 3: The Government may elect to exercise the option, or not to exercise the option. If the option estimated quantity of the option item. Additionally the Government may elect to exercise the option at any time between the contract award date and September 2, 2020.

FY20 MAUMEE BAY DREDGE AMENDMENT NO. 1

FY20MAUMBAYDR W912P420B0001

(1) Schedule "A" - Open Lake Placement Site

Rate: 6,000 CY per day

Milestone Maximum Calendar Days After Receipt of Notice to Proceed

Commence Work (Submittals, Administration, etc.) 10

Commence Actual Dredging Operations 48

Complete Base Bid Work 100

(2) Schedule "B" - Contractor-furnished Placement Site

Rate: 4,000 CY per day

Milestone Maximum Calendar Days After Receipt of Notice to Proceed

Commence Work (Submittals, Administration, etc.) 10

Commence Actual Dredging Operations 48

Complete Base Bid Work 125

b. The Notice to Proceed will be issued on or about 07/15/2020.

1.2.1 Environmental Window

The Maumee Bay has dredging limitations based upon Environmental conditions. Dredging is permitted from, and including, 1 July, to and including, 15 March.

1.2.2 Schedule of Work

Submit a complete schedule of work covering the period of time from the Notice of Award through the specified duration of the contract, including all private and Government work, and the plant intended for each project, to the Contracting Officer within 10 calendar days of receipt of the Notice of Award.

1.2.3 Contract Accruals

In conjunction with the schedule submittal requirements, submit a monthly listing of accruals. Accruals are used to provide projections of the incremental costs not yet paid for, but earned. Submit the accrual submittal one week before the end of each month throughout the contract duration. Provide accrual information for each line item of the Bidding Schedule.

SECTION 01 35 13 Page 1022 03/25/20 h5cosklm Highlight h5cosklm Highlight h5cosklm Highlight

"General Decision Number: IL20200018 03/06/2020

Superseded General Decision Number: IL20190018

State: Illinois

Construction Types: Heavy (Dredging and Marine)

Counties: Illinois Statewide.

MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND

MARINE CONSTRUCTION):

ILLINOIS, INDIANA, MICHIGAN, MINNESOTA, NEW YORK, OHIO,

PENNSYLVANIA AND WISCONSIN DREDGING AND MARINE CONSTRUCTION

Dredging and Marine Construction Projects: floating/land equipment engaged in clamshell, backhoe and dragline dredging, marine construction, bridges,salvage operations and cranes, loaders, dozers, or other equipment used for disposal of dredge spoils or marine construction materials on land at the slip or dock, at the project site, where the above material/spoils is being handled, and all equipment utilized on breakwall/breakwater structures on the Great Lakes, Islands therein, their connecting and tributary waters, including the Illinois Waterway to the Lock at Lockport, Illinois, the New York State Barge Canal System between Tonawanda, New York and Waterford, New York and Oswego, New York, the Duluth-Superior area to the Fond du Lac Bridge Crossing (Minnesota State Highway 23) on the St. Louis River and on the St. Lawrence River eastward to the International Boundary near St. Regis, New York.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 03/06/2020

* SUIL2003-001 01/01/2020

3/27/2020https://beta.sam.gov/wage-determination/IL20200018/2?index=wd&is_active=true&date_f...

MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND

MARINE CONSTRUCTION):

Rates Fringes

Dredging:

Fireman, Oiler, Deckhand, & Scowman (with dipper, hydraulic or other floating equipment engaged in hydraulic and dipper dredging operations) Pipeline men (both afloat & ashore including loading, unloading, maintaining, and handling pipelines for hydraulic dredges and sandboats Rangeman, Tankerman, Sweepman and service Truck Driver......................$ 22.51 7.61+a+b Lead Deckhand...............$ 29.68 7.61+a+b

Hydraulic Dredging LAUNCH OPERATOR - Vessel 800 Horse- Power Or Less....$ 25.15 7.61+a+b TUG ENGINEER................$ 26.49 7.61+a+b TUG OPERATOR - Vessel Over 800 Horse-Power.............$ 26.49 7.61+a+b TUG WORKERS: Fireman, Lineman, Oiler, Deckhand, Tankerman. Scowman, (on/or with tugboats, launches, or other self-propelled boats)......................$ 22.51 7.61+a+b

MECHANIC (Undefined)

FLOATING EQUIPMENT:

Illinois Class I....................$ 58.20 38.25+b&c Class II-A.................$ 56.70 38.25+b&c Class II-B.................$ 59.70 38.25+b&c Class III..................$ 50.45 38.25+b&c Class IV...................$ 41.95 38.25+b&c FLOATING EQUIPMENT: Indiana Class I....................$ 49.50 34.75+b&c Class II-A.................$ 48.00 34.75+b&c Class II-B.................$ 50.00 34.75+b&c Class III..................$ 42.75 34.75+b&c Class IV...................$ 35.55 34.75+b&c

FLOATING EQUIPMENT:

Michigan Class I....................$ 46.00 31.07+b&c Class II-A.................$ 44.50 31.07+b&c Class II-B.................$ 46.00 31.07+b&c Class III..................$ 39.95 31.07+b&c Class IV...................$ 33.75 31.07+b&c

FLOATING EQUIPMENT:

Minnesota Class I....................$ 47.10 20.60+b&c Class II-A.................$ 45.60 20.60+b&c Class II-B.................$ 45.60 20.60+b&c

Class III..................$ 40.60 20.60+b&c Class IV...................$ 33.75 20.60+b&c

FLOATING EQUIPMENT:

New York:(Cattaraugus, Chautauga, Erie and Orleans Counties) Class I....................$ 47.60 31.26+b&c Class II-A.................$ 46.70 31.26+b&c Class II-B.................$ 49.10 31.26+b&c Class III..................$ 41.05 31.26+b&c Class IV...................$ 34.15 31.26+b&c

FLOATING EQUIPMENT:

New York:(Cayuga, Jefferson, Oswego, and St.

Lawrence Counties) Class I....................$ 51.60 27.15+b&c Class II-A.................$ 50.10 27.15+b&c Class II-B.................$ 53.10 27.15+b&c Class III..................$ 44.60 27.15+b+c Class IV...................$ 37.10 27.15+b&c

FLOATING EQUIPMENT:

New York:(Monroe and Wayne Counties and the City of Rochester) Class I....................$ 50.80 29.63+b&c Class II-A.................$ 49.30 29.63+b&c Class II-B.................$ 52.30 29.63+b&c Class III..................$ 43.90 29.63+b&c Class IV...................$ 36.50 29.63+b&c

FLOATING EQUIPMENT:

New York:(Niagara) Class I....................$ 45.55 30.05+b&c Class II-A.................$ 44.05 30.05+b&c Class II-B.................$ 47.05 30.05+b&c Class III..................$ 39.20 30.05+b&c Class IV...................$ 32.60 30.05+b&c

FLOATING EQUIPMENT:

Ohio:(Ashtabula, Cuyahoga, Erie,Lake, and Lorain Counties) Class I....................$ 46.00 15.30+b&c Class II-A.................$ 44.50 15.30+b&c Class II-B.................$ 44.50 15.30+b&c Class III..................$ 39.95 15.30+b&c Class IV...................$ 33.75 15.30+b&c

FLOATING EQUIPMENT:

Ohio:(Lucas, Henry, Ottawa, Wood and Sandusky Counties) Class I....................$ 46.00 15.30+b&c Class II-A.................$ 44.50 15.30+b&c Class II-B.................$ 44.50 15.30+b&c Class III..................$ 39.95 15.30+b+c Class IV...................$ 33.75 15.30+b&c

FLOATING EQUIPMENT:

Pennsylvania:(Erie County):

Class I....................$ 46.00 22.23+b&c

Class II-A.................$ 44.50 22.23+b&c Class II-B.................$ 47.50 22.23+a&b Class III..................$ 39.95 22.23+b&c Class IV...................$ 33.75 22.23+b&c

FLOATING EQUIPMENT:

Wisconsin:Includes all marine/floating type work on projects in the Superior/Duluth Harbor, Lake Superior.

Class I....................$ 48.85 23.03+b&c Class II-A.................$ 47.35 23.03+b&c Class II-B.................$ 47.85 23.03+b&c Class III..................$ 42.15 23.03+b&c Class IV...................$ 35.05 23.03+b&c

PAID HOLIDAYS (WHERE APPLICABLE):

A- NEW YEAR'S DAY

B- MEMORIAL DAY

C- INDEPENDENCE DAY

D- LABOR DAY

E- THANKSGIVING DAY

F- CHRISTMAS DAY

G- PRESIDENT'S DAY

H- VETERANS DAY.

FOOTNOTES:

a. $30.10 per day per employee for medical

b. Eight paid holidays: A thru H

c. Hazardous/Toxic Waste Material:

*Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour

Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency.

CLASSIFICATION DESCRIPTIONS

Class I - Master Mechanic - assist and direct Class II, Class III, and Class IV, diver/wet tender, engineer (hydraulic dredge) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender Class II-B Friction, Lattice Boom, or any Crane Certifications Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc.

Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Amendment_01_Solicitation_Maumee_Bay_W9P12420B00010001
1. INTENT
2. BASIS OF SELECTION OF AWARD
3. SITE VISIT
4. REGISTRATION IN SAM
5. REQUESTS FOR INFORMATION
6. SUBMISSION OF BIDS
1. BID OPENING
9. FACSIMILE BIDS/OFFERS NOT ACCEPTED
10. AMENDMENTS
NOTE: Failure to comply with the above instructions may result in an offeror not being eligible for award.
FY20 Maumee Bay Dredge Bid (03-25-20)Amendment No. 1
SECTION 00 10 00
BIDDING SCHEDULE "A"
SECTION 00 10 00
BIDDING SCHEDULE "B"
FY20 Maumee Bay Dredge-Amendment No.1-W912P420B0001
Wage Determination_03062020