MMD Maintenance Roof Repair

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

The Government estimate magnitude price in accordance with FAR 36.201(a) is Between $25,000 and $100,000..

-Work to be Performed: Replace Maintenance Shop Roof at Mount Morris Dam., Mount Morris, NY.

-Description of Work Required: "See Statement of Work."

-Timeline: All work must be completed within 60 days following the initial award of the contract.

-Liquidated Damages: $150.00 dollars for each calendar day of delay until the work is completed or accepted.

-Site Visit: There will be one(1) scheduled pre-bid site visit for prospective bidders. The date will be July 10th, 2017 at 10:00 AM. The location of the visit will be the William B. Hoyt II Visitor Center, 6103 Visitor Center Road, Mount Morris, New York 14510. Prospective bidders are urged to attend to gain information that will be necessary in the preparation of bid submittals.

-Proposals: Should be e-mailed, or mailed, or faxed to Dorothy J. Jones, Contract Specialist, 1776 Niagara St., Buf falo, NY 14207, E-mail:dorothy.j.jones@usace.army.mil; Tele#716-879-4253, OR Frank J. D'Andrea, e-mail: frank.j.dandrea@usace.army.mil Tele#716-879-4245, Fax: 716-879-4353 on 21 July 2017 by 3:00 PM..

-NAICS 238160 - Size Standard $15,000,000.

-This is a 100% Small Business.

DOROTHY J JONES 716-879-4253

DOROTHY J JONES 716-879-4253

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Jun-2017

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 60 calendar days after receiving award, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: 716.879.4173 TEL: FAX:

W912P417T0020 18

W912P417T0020

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

BASE BID ITEM 1

FFP

Demolition of Roof Covering: The Contractor must remove and dispose of all existing roof covering down to the decking including but not limited to the PVC roof membrane, insulation, flashing, drip edge, gutters, fascia boards and covering.

Please read Statement of Work for more detailed information.

FOB: Destination

NET AMT

0002 1 Job

BASE BID ITEM 2

FFP

Install new TPO Roof Covering: The contractor must install a complete new TPO roofing membrane. Please read Statement of Work for more detailed information..

0003 85 Each

OPTION OPTIONAL BID ITEM 3

FFP

Replace damaged roof decking: The Contractor must remove and replace any rotten roof decking material, a quantity to be determined once demolition is completed under Base Bid Item 1. These are estimated quantities. Please read

Statement of Work for more detailed information.

0004 150 Linear

Foot

OPTION OPTIONAL BID ITEM 4

FFP

Replace damaged roof joist: The Contractor must remove and replace any rotten roof joists, a quantity to be determined once demolition is completed under Base

Bid Item 1. These are estimated quantities. Please read Statement of Work for more detailed information.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 30-SEP-2017 1 NY/PA OPER/MAINT OFFICE

MICHAEL FERRARI

1776 NIAGARA STREET

BUFFALO NY 14207-3199

(716) 879-4199

9623ER

0002 30-SEP-2017 1 (SAME AS PREVIOUS LOCATION)

0003 30-SEP-2017 85 (SAME AS PREVIOUS LOCATION)

0004 30-SEP-2017 150 (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-3 Taxpayer Identification OCT 1998

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2016

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.222-6 Construction Wage Rate Requirements MAY 2014

52.222-50 Combating Trafficking in Persons MAR 2015

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-12 Notice of Buy American Requirement - Construction

Materials Under Trade Agreements

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-14 Inconsistency Between English Version And Translation Of

Contract

FEB 2000

52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-27 Prompt Payment for Construction Contracts JAN 2017

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-5 Material and Workmanship APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-19 Organization and Direction of the Work APR 1984

52.236-28 Preparation of Proposals--Construction OCT 1997

52.243-1 Changes--Fixed Price AUG 1987

52.244-6 Subcontracts for Commercial Items JAN 2017

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238160.

(2) The small business size standard is $15,000,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or

Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at

52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding elinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.222-57, Representation Regarding Compliance with Labor Laws (Executive Order 13673). This provision applies to solicitations expected to exceed $50 million which are issued from October 25, 2016 through April 24, 2017, and solicitations expected to exceed $500,000, which are issued after April 24, 2017.

Note to paragraph (c)(1)(xvi): By a court order issued on October 24, 2016, 52.222-57 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal

Register advising the public of the termination of the injunction.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased

Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and

III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.

(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at

52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-

Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days. * The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $150.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 45 days. Delivery of added items shall continue at the same rate that like items are https://www.acquisition.gov/ called for under the contract, unless the parties otherwise agree.

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph

(b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the

Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1

Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___

Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___

Item 2

Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___

Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT

2016)

(a) Definitions. As used in this clause--

Caribbean Basin country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item —

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United

Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican

Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon

Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin

Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.

Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean

Basin country construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

Least developed country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from

“Free Trade Agreement country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

“Least developed country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting

Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate ``none'']

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph

(b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the

Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1:

Foreign construction material

Domestic construction material

Item 2:

Foreign construction material

Domestic construction material

\1\ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: William B. Hoyt II Visitor Center.

Address: 6103 Visitor Center Road, Mount Morris, NY 14510.

Telephone: Michael Ferrari, 716-879-4199

(End of provision)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ https://www.acquisition.gov/far/old_pdf.html

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=browsefar https://www.acquisition.gov/far/old_pdf.html

Section 00 70 00 - Conditions of the Contract

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

U.S. Army Corps of Engineers® Buffalo District

Statement of Work Mount Morris Dam, Mount Morris, NY Maintenance Shop Roof Replacement

Customer:

Park Manager, Mount Morris Dam

Prepared By:

Michael Ferrari, NY/PA O&M U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207

May 2017 – RTA

1 General Description of Work

1.1 Base Bid Item(s)

1.1.1 Base Bid Item 1 – Demolition of Roof Covering

1.1.2 Base Bid Item 2 – Install New TPO Roof Covering

1.2 Optional Bid Item(s)

1.2.1 Optional Bid Item 3 – Replace Damaged Roof Decking

1.2.2 Optional Bid Item 4 – Replace Damaged Roof Joist

2 Point of Contact 3 Pre-Bid Site Visit 4 Project/Contractual References 5 Material/Equipment Specifications 6 Detailed Description of Work

6.1 Detailed Description of Work – Base Bid Item(s)

6.1.1 Base Bid Item 1 - Demolition of Roof Covering

6.1.2 Base Bid Item 2 – Install New TPO Roof Covering

6.2 Detailed Description of Work – Optional Bid Item(s)

6.2.1 Optional Bid Item 3 – Replace Damaged Roof Decking

6.2.2 Optional Bid Item 4 – Replace Damaged Roof Joist

7 Project Information

7.1 Basis for Award

7.1.1 Award Period for Options

7.2 Period of Performance

7.2.1 Pre-Construction Submittals

7.3 Pre-Construction Meeting

7.4 Work Schedule

7.5 Material/Equipment Information

7.6 Dimension/Quantity Verification

7.7 Material Storage

7.8 Site Cleanup

8 Quality Assurance (QA)

8.1 Overview

8.1.1 Government Project Manager (PM)

8.1.2 Government Quality Assurance (QA)

8.1.3 Government Inspections

8.1.4 Product Data Sheets

9 Communication 10 Repair/Restoration of Government Property 11 Work Stoppage, Contract Cancellation Actions 12 Material Change Orders 13 Liquidated Damages 14 Inspection/Testing

14.1 Pre-Final/Final Inspection

15 Completion 16 Payment 17 Warranty

17.1 Warranty Period

17.2 Repairs

18 Safety 19 Security

19.1 Access and General Protection/Security Policy and Procedures

19.1.1 Candidate Pre-Screening

19.1.2 Background Investigation

19.2 Suspicious Activity Reporting Training

19.3 Start of Work

19.4 Arrival/Departure

19.5 Video/Camera Equipment

20 Submittals

20.1 Bid Submittals

20.2 Pre-Construction Submittals

20.3 Project Completion Submittals

Attachment #1 – Bid Schedule Attachment #2 – Directions to Mount Morris Dam Attachment #3 – Government Safety Requirements Attachment #4 – Blank Fall Protection & Prevention Plan Review Attachment #5 – Blank Activity Hazard Analysis Attachment #6 – USACE Buffalo District Monthly Man Hour Exposure Report Attachment #7 – Roof Area Drawing

1 General Description of Work The contractor must perform the following work under this contract:

1.1 Base Bid Item(s)

1.1.1 Base Bid Item 1 – Demolition of Roof Covering

1.1.2 Base Bid Item 2 – Install New TPO Roof Covering

1.2 Optional Bid Item(s)

1.2.1 Optional Bid Item 3 – Replace Damaged Roof Decking

1.2.2 Optional Bid Item 4 – Replace Damaged Roof Joist

2 Point of Contact For scheduling project site visits and/or questions regarding this Statement of Work:

U.S. Army Corps of Engineers, Buffalo District Attn: Contracting Officer 1776 Niagara Street Buffalo, New York 14207

Phone: 716-879-4126 Facsimile: 716-879-4353

3 Pre-Bid Site Visit There will be one (1) scheduled pre-bid site visit for prospective bidders. The date and time of the visit will be posted on FBO. The location of the visit will be the William B. Hoyt II Visitor Center, 6103 Visitor Center Road, Mount Morris, New York 14510. Prospective bidders are urged to attend to gain information that will be necessary in the preparation of bid submittals. Due to maintenance, operation and security requirements, unscheduled visits may not be honored. Following the visit to the project site, a question and answer session will be held. During this session, prospective bidders are asked to direct all questions concerning the project to the Buffalo District Contracting Office

(DCO).

4 Project/Contractual References

• EM 385-1-1, 30 Nov 2014, U.S. Army Safety and Health Requirements Manual

• ASTM D 6878 Thermoplastic Polyolefin Based Sheet Roofing

5 Material/Equipment Specifications

The following minimum material and equipment specifications must be met for this project:

• Thermoplastic Polyolefin (TPO), 0.080” thickness, white color, installed with a fully adhered method, meeting ASTM D6878. Minimum 25 year manufacturer warranty.

• TPO flashings must be used under the same manufacturer and product line as the TPO membrane above.

• Polyisocyanurate insulation, minimum ¾” thickness insulation, installed per manufacturer’s instructions.

• Cover board as per manufacturer TPO system requirements, minimum ½” thickness, installed per manufacturer’s instructions.

6 Detailed Description of Work

6.1 Detailed Description of Work – Base Bid Item(s)

6.1.1 Base Bid Item 1 - Demolition of Roof Covering

The contractor must remove and dispose of all existing roof covering of approximately 2,706 SF down to the decking, including but not limited to the PVC roof membrane, insulation, flashing, drip edge, gutters, fascia boards and covering. Dispose of all materials off-site in accordance with all federal, state, and local laws and regulations. All protruding screws, nails and materials must be removed from the existing roof decking. The deck must be prepared according to the roofing manufacturer’s instructions. The contractor must provide temporary protective measures for potential damages to the exposed structure as needed due to weather.

The contractor must inspect and replace the exposed roof decking for any damaged sections. Optional Bid Items 3 and 4 may be awarded for replacing a quantity of decking or wood joists. The government will inspect and verify any quantities of decking and joists to be replaced. The contractor may not proceed with any decking demolition or roof covering installation in Bid Items 2, 3 or 4 until approval is given in writing by the government.

6.1.2 Base Bid Item 2 – Install New TPO Roof Covering

The contractor must install a complete new TPO roofing membrane over the approximate 2,706 SF area, as shown in Attachment #7. The contractor must use a fully adhered membrane meeting the specifications in Section 5 above. The membrane must be installed in accordance with the manufacturer’s instructions and per industry standards.

The new roofing system must require a minimum 25 year manufacturer’s warranty. The contractor must coordinate the installation with the TPO manufacturer during installation for manufacturer’s on-site inspection to certify the warranty. Include the manufacturer’s point of contact in a pre-work submittal as the government will communicate directly with the manufacturer to verify the installation meets requirements. If the contractor fails to have the roof inspected for certification at the time of installation, the contractor will be required to peel back the roof for inspection and repair at the contractor’s expense.

The contractor must install closed-cell polyisocyanurate insulation, followed by a cover board over the entire roof decking prior to installing the TPO. The chosen insulation and cover board must be compatible with the TPO membrane. The insulation must be mechanically fastened to the roof and installed per manufacturer’s instructions for the type, quantity, and pattern of fasteners. Any other layers required per the TPO manufacturer’s instructions shall also be included.

The contractor must replace all wood fascia and trim boards around the perimeter of the roof. Replacement fascia board must be 2-by pressure treated lumber. The fascia must be wrapped in cocoa brown aluminum trim, bent with a press brake. Total fascia board and cover is approximately 225 linear feet.

The contractor must replace all penetration and other flashing with new TPO flashings. All TPO flashings must be installed per TPO manufacturer’s instructions. There are two (2) roof vents that must be replaced prior to flashing.

The vents are static vents and must be galvanized steel, fully enclosed box style, appropriate for a low pitch roof, of equal size to the existing vents. In addition there are two (2) flue vents for gas heaters that will need to be flashed. The large vent from the bathroom must be abandoned and the hole framed and decked.

The contractor must install new brown colored seamless gutters and downspouts in the same locations as the previous gutters. The total gutter is approximately 100 linear feet and includes four (4) downspouts. The gutters must be installed per TPO and gutter manufactures instructions. All trim pieces visible from the ground such as fascia, eave trim, rake, transition, ridge, high side peak and gutters must be cocoa brown in color.

Prior to ordering any materials, provide to the government pre-construction submittals for all materials, including but not limited to: TPO membrane, TPO flashing, insulation, cover board, roof vents, fascia, trim boards and seamless gutters. Include all datasheets, installation instructions, and manufactures warranty requirements.

The contractor must furnish a typewritten information card for facility records and also a card laminated in plastic and framed for interior display in the shop office area. The card must be 8 ½” x 11” identifying the contract number, approximate roof area, detailed roof system description, including deck type, roof covering manufacturer and product name, type of underlayment, date of completion, installing contractor identification and contact information; manufacturer warranty expiration, warranty reference number, and manufacturer’s contact information.

6.2 Detailed Description of Work – Optional Bid Item(s)

6.2.1 Optional Bid Item 3 – Replace Damaged Roof Decking

The contractor must remove and replace any rotten roof decking material, a quantity to be determined once demolition is completed under Base Bid Item 1. The decking must be DOC PS 1/2 (plywood) and equal to the existing thickness. All sheets must be fastened with 8d ring shank nails spaced 6” on center along all joists.

The bid unit shall be each, with a unit quantity of one (1) 4 x 8’ sheet. The number of units to be replaced will be determined in a joint inspection between the contractor and the government after demolition is complete. The range of awarded quantity may be between 0 to 85 units.

6.2.2 Optional Bid Item 4 – Replace Damaged Roof Joist

The contractor must remove and replace any rotten roof joists, a quantity to be determined once demolition is completed under Base Bid Item 1. The joists must be replaced in-kind. Fasteners must be 16d nails.

The bid unit shall be linear foot of 2-by lumber. The number of units to be replaced will be determined in a joint inspection between the contractor and the government after demolition is complete. The range of awarded quantity may be between 0 to 150 linear feet.

7 Project Information

7.1 Basis for Award

The government must award the contract to the offeror who provides the lowest priced offer, base work plus all options. Please provide with the bid bond documentation that demonstrates:

• Have a minimum of (5) years experience on projects of a similar nature. The contractor must supply the names, locations, and client contact information for two (2) projects of similar size and scope that have been accomplished within the previous five (5) years as part of the bid submittals.