W912P4-16-T-0041-0002.pdf
PDF 1 MB Posted
- Attached to
- MMD SLIDE GATE SEALING SURFACE REHABILITATION Federal contract opportunity
- Solicitation number
- W912P4-16-T-0041
About this file
The purpose for this amendment is to change CLINS 2 and 3 from job to each and to add the FSC SIC and NAICS codes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P4-16-T-0041_UPDATE_23SEPT_FY_165_MMD_GATE_Rehab_RTA_9Aug.pdf | ||
| Change_in_Bid_Open_23Sept2016.docx | DOCX document | |
| Comments_for_FBO_23Sept2016.docx | DOCX document | |
| Site_Visit_Packet.pdf | ||
| W912P4-16-T-0041-0001.pdf | ||
| W912P4-16-T-0041_FY165_MMD_GATE_SEAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the unit of issue on CLINS 2 and 3 from Job to Each and to add the FSC code, SIC code, and NAICS code. Everything else w ill remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P4-16-T-0041
X 9B. DATED (SEE ITEM 11)
02-Sep-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2016
CODE
U.S. ARMY ENGINEER DISTRICT, BUFFALO
1776 NIAGARA STREET
BUFFALO NY 14207-3199
W912P4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P4-16-T-0041
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 0003
The FSC code 9999 has been added.
The SIC code 7699 has been added.
The NAICS code 811310 has been added.
CLIN 0001
The CLIN extended description has changed from Mobilization ad Demobilization. to Mobilization ad Demobilization. Read Statement of Work for more detailed information..
CLIN 0002
The CLIN description has changed from Service Gates in Conduits 7-9 to Service Gates in Conduits 7 - 9.
The CLIN extended description has changed from Clean bottom sealing surface of the service gates, smooth the bottom babbit sill, and apply repair material to prepared area and close gate to mate with the bottom sill.
See SOW for more detailed information. to Rehabilitate/Clean bottom sealing surface of the service gates, smooth the bottom babbit sill, and apply repair material to prepared area and close gate to mate with the bottom sill. See SOW for more detailed information..
The pricing detail quantity has increased by 2.00 from 1.00 to 3.00.
The unit of issue has changed from Job to Each.
CLIN 0003
The CLIN extended description has changed from Clean bottom sealing surface of the service gates, smooth the bottom babbit sill, and apply repair material to prepared area and close gate to mate with the bottom sill.
See SOW for more detailed information. to Clean bottom sealing surface of the service gates, smooth the bottom babbit sill, and apply repair material to prepared area and close gate to mate with the bottom sill. See SOW for more detailed information. See Bid Schedule, Attaachment #1, on page 14 of Statement of Work..
The pricing detail quantity has increased by 5.00 from 1.00 to 6.00.
The unit of issue has changed from Job to Each.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0002 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
W912P4-16-T-0041
30-SEP-2017 1 MOUNT MORRIS DAM
STEVE WINSLOW
6103 VISITOR CENTER RD.
MOUNT MORRIS NY 14510-9506
585-658-4790 FOB: Destination
2YTH5M
To:
30-SEP-2017 3 MOUNT MORRIS DAM
STEVE WINSLOW
6103 VISITOR CENTER RD.
MOUNT MORRIS NY 14510-9506
585-658-4790
The following Delivery Schedule item for CLIN 0003 has been changed from:
30-SEP-2017 1 MOUNT MORRIS DAM
STEVE WINSLOW
6103 VISITOR CENTER RD.
MOUNT MORRIS NY 14510-9506
585-658-4790
To:
30-SEP-2017 6 MOUNT MORRIS DAM
STEVE WINSLOW
6103 VISITOR CENTER RD.
MOUNT MORRIS NY 14510-9506
585-658-4790
(End of Summary of Changes)
U.S. Army Corps of Engineers® Buffalo District
Statement of Work Mount Morris Dam, Mount Morris, NY
Slide Gate Sealing Surface Rehabilitation
Customer:
Park Manager, Mount Morris Dam
Prepared By:
Edward Gawarecki, NY/PA O&M Office U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207
July 2016
1 General Description of Work
1.1 Base Bid Item(s)
1.1.1 Base Bid Item 1 – Mobilization and Demobilization
1.1.2 Base Bid Item 2 - Service Gates in Conduits 7-9
1.2 Optional Bid Item(s)
1.2.1 Optional Bid Item 3 – Service Gates in Conduits 1-6
2 Point of Contact 3 Pre-Bid Site Visit 4 Project/Contractual References 5 Material/Equipment Specifications 6 Detailed Description of Work
6.1 Detailed Description of Work – Base Bid Item(s)
6.1.1 Base Bid Item 1
6.1.2 Base Bid Item 2
6.2 Detailed Description of Work – Optional Bid Item(s)
6.2.1 Optional Bid Item 3
7 Project Information
7.1 Basis for Award
7.1.1 Award Period for Options
7.2 Period of Performance
7.3 Pre-Construction Meeting
7.4 Work Schedule
7.5 Special Job Requirements
7.6 Water Management During Construction
7.7 Material/Equipment Information
7.8 Dimension/Quantity Verification
7.9 Material Storage
7.10 Site Cleanup
8 Quality Assurance (QA)
8.1 Overview
8.1.1 Government Project Manager (PM)
8.1.2 Government Contracting Officer Representative (COR)
8.1.3 Government Quality Assurance (QA)
8.1.4 Government Inspections
8.1.5 Product Data Sheets
8.2 Contractor Quality Control (CQC)
8.2.1 Quality Control Program (QCP)
9 Communication 10 Repair/Restoration of Government Property 11 Work Stoppage, Contract Cancellation Actions 12 Material Change Orders 13 Liquidated Damages 14 Inspection/Testing
14.1 Materials Testing/Inspection
14.2 Photo/Video Documentation of Work
14.3 Pre-Final/Final Inspection
15 Completion 16 Payment 17 Warranty
17.1 Warranty Period
17.2 Repairs
18 Project Safety and Health Requirements/Accident Prevention Plans (APP):
19 Security
19.1 Start of Work
19.2 Arrival/Departure
19.3 Video/Camera Equipment
19.4 Personally Identifiable Information (PII)
20 Submittals
20.1 Bid Submittals
20.2 Pre-Construction Submittals
20.3 Construction Submittals
20.4 Project Completion Submittals
Attachment #1 – Bid Schedule Attachment #2 – Quality Control Specifications Section 01 45 00.00 10 Attachment #3 – Quality Control System Specifications Section 01 45 00.10 10 Attachment #4 – Quality Control Plan Checklist Attachment #5 – Safety Specification Section 01 35 26 Attachment #6 – Accident Prevention Plan Checklist Attachment #7 – Blank Activity Hazard Analysis Attachment #8 – As-Built Drawings Attachment #9 – Conduit and Gate Inspection Report Attachment #10 – USACE Buffalo District Monthly Man Hour Exposure Report
1 General Description of Work The contractor shall perform the following work under this contract:
1.1 Base Bid Item(s)
1.1.1 Base Bid Item 1 – Mobilization and Demobilization
1.1.2 Base Bid Item 2 - Service Gates in Conduits 7-9
(a) Clean bottom sealing surface of the service gates
(b) Smooth the bottom babbit sill
(c) Apply repair material to prepared area and close gate to mate with the bottom sill
1.2 Optional Bid Item(s)
1.2.1 Optional Bid Item 3 – Service Gates in Conduits 1-6
(a) Clean bottom sealing surface of the service gates
(b) Smooth the bottom sill
(c) Apply repair material to the prepared area and close gate to mate with the bottom sill
2 Point of Contact
For scheduling project site visits and/or questions regarding this Statement of Work:
U.S. Army Corps of Engineers, Buffalo District Attn: Contracting Officer 1776 Niagara Street Buffalo, New York 14207
Phone: 716-879-4173 Facsimile: 716-879-4353
3 Pre-Bid Site Visit There will be one (1) scheduled pre-bid site visit for prospective bidders. The date and time of the visit will be posted on the FBO web site. The location of the visit will be William B. Hoyt II Visitor Center, 6103 Visitor Center Road, Mount Morris Dam, Mount Morris, New York 14510. Prospective bidders are urged to attend to gain information that will be necessary in the preparation of bid submittals. Due to maintenance, operation and security requirements, unscheduled visits may not be honored. Following a visit to the project site, a question and answer session will be held. During this session, prospective bidders are asked to direct all questions concerning the project to the Buffalo District Contracting Office (DCO).
NOTE: As the work area is in a permit required confined space, potential bidders wishing to enter and inspect the work area shall provide current certification as a confined space entrant. The government will provide the necessary safety harnesses, retrieval device and air monitoring for entry. The government will provide temporary water control for the site visit, river conditions permitting. Also, there may be shallow water inside the conduit and the contractor is responsible to bring their own waders and rubber boots to remain dry.
NOTE: Due to the non-standard site conditions including the confined space conditions it is HIGHLY RECOMMENDED that prospective bidders attend the pre-bid site visit.
4 Project/Contractual References
• EM 385-1-1, Nov 2014, U.S. Army Safety and Health Requirements Manual
• As-Built Drawings Sheets 15.1, 15.5
• Previous Inspection Reports
5 Material/Equipment Specifications
The following material and equipment specifications shall be met for this project:
• Belzona 1311 or 1321 repair material or approved equal
• Belzona 9411 release agent or approved equal
• Belzona 9111 cleaner or approved equal
6 Detailed Description of Work
6.1 Detailed Description of Work – Base Bid Item(s)
6.1.1 Base Bid Item 1
Contractor to mobilize to the site and demobilize upon completion of all awarded base and option items.
6.1.2 Base Bid Item 2
Work for Service Gates in Conduits 7-9 shall include:
(1) Positioning and securing sluice gates to accommodate all work and maintaining the work area.
(a) Lower the emergency (upstream) gate and secure in position
(b) Raise the service (downstream) gate and secure in position
(c) Any dewatering and/or water control necessary to allow work in the dry and to provide suitable conditions per the repair material manufacturer’s recommendations.
(2) Clean and prepare the bottom sealing surface of sluice gates.
(a) Prepare the steel bottom surface of the gate in order to allow for a sufficient thickness, per manufacturer’s recommendations, of the repair material to be applied. Note that there are brass “shoes” at the edges of the gate that are not to be surfaced and can be used to establish a profile for the finished surface once the repair is complete.
(b) Roughen the bottom of the gate surface and an area upwards from the bottom on both the upstream and downstream sides in order to establish a surface profile that will insure proper adhesion of the repair material to the gate. This area will extend a minimum of 10 inches upwards from the bottom on the downstream side and 20 inches upwards from the bottom on the upstream side, but can extend further in order to provide sufficient bonding of the repair material to the gate.
(3) Rehabilitate babbitt gate sill on sluice gate seat.
(a) Smooth out any damaged areas by scraping or localized heating and puddling of the babbitt material.
Damaged areas are defined as anything showing physical deformation, such as any debris getting caught between the gate and sill causing impact damage.
(b) Special precautionary measures shall be taken for work on babbitt metal. These measures are as indicated in Section 7.5. The babbitt material is a Royal Babbitt #8 specification, a lead alloy. The government will furnish ingots of the material to the contractor when necessary.
(4) Perform surface preparation, apply material and lower service gate in order to allow the material to mold and match the babbitt sill surface.
(a) Clean the surface of the gate that is to have the repair material applied to the material manufacturer’s requirements. (e.g. SSPC SP-10) Power tool cleaning, abrasive blasting, etc may be used. The cleaned surface shall be wiped down with a cleaner and the repair material applied.
NOTE: If steel grit is used as the blast media, the expended blast media can be allowed to wash downstream. If other blast media is used, prior approval shall be obtained from the Contracting Officer.
NOTE: Insure that the cleaner or any other environmentally hazardous materials do not enter the water column of the river.
(b) The existing gate sealing surface is approximately 2 inches wide. The sill in way of the gate shall be cleaned and a release agent applied in order to prevent bonding of the repair material to the sill.
(c) The gate shall then be lowered in order for the brass “shoes” to make contact with the sill. The gate will then remain in the down position while the repair material cures.
(5) Once the repair material has fully cured and the repair work is complete, inspect for proper seal along bottom of the gate and proper adhesion of the repair material to the gate.
6.2 Detailed Description of Work – Optional Bid Item(s)
6.2.1 Optional Bid Item 3
Work for Service Gates in Conduits 1-6 shall include the same work as indicated above for gates 7-9.
7 Project Information
7.1 Basis for Award
The government shall award the contract to the offeror who provides the lowest priced technically acceptable offer.
The evaluated price shall include the base work plus all option(s). In order to be considered technically acceptable, the contractor/subcontractor shall:
• Have a minimum of five (5) years experience on projects of similar nature, specifically dealing with metal work using Belzona or equal repair materials as well as work with pumps or other large machinery. The contractor shall supply the names, locations, and client contact information for two (2) projects of similar size and scope that have been accomplished within the previous five (5) years as part of the bid submittals.
• Points of contact provided may be selectively contacted and their comments will affect the evaluations of proposals.
• A brief statement (less than 100 words) how each project illustrates your performance capabilities.
• Manufacturer’s cut sheets or similar for the products to be used
• This information can be transmitted electronically or in hard copy to the USACE Contracting Officer.
7.1.1 Award Period for Options
The government reserves the right to award any and/or all optional bid items at any time starting from the award of the base bid items to fifteen (15) days after completion of the first repair. Options may be awarded using multiple awards, e.g. an option for 2 additional gates may be awarded with the base bid award, 2 more may be awarded prior to the start of on-site construction and 2 more may be awarded after the start of on-site construction.
7.2 Period of Performance
The contractor shall be required to commence work under this contract within ten (10) calendar days after the date of receipt by the contractor of the Notice to Proceed, to prosecute said work diligently, and to complete the base bid and option work in accordance with the milestone schedule below. The time stated for completion shall include final clean-up of the premises.
Maximum Calendar Days After Receipt of Notice to Proceed (or Milestone Start/Completion Date) Commence Work (Submittals, Administration, etc.) 10
Pre-Construction Submittal Completion 30 April 2017
Commence Actual On-Site Operations 15 May 2017
Complete Base and Awarded Options 30 September 2017
The Notice to Proceed will be issued on or about 30 September 2016. Work may not begin until government approval of all submittals required in Section 20.2 of this Statement of Work.
The time period associated with the completion of the base bid work includes:
1. An optional no-work period of 150 days, from 1 December 2016 through 30 April 2017, where the Contractor may choose to work but is not required to do so. If the Contractor chooses to work, any adverse weather days occurring during the optional no-work period shall not be included in the total number of adverse weather days for the purpose of obtaining an extension.
For any and/or all optional bid items awarded within one hundred and fifty (150) days following the notice to proceed, no additional days will be given to complete said bid items since this work is covered in the base bid period of performance. For optional items awarded after the 150 day period, the period of performance will be extended by a mutually agreed period. In the event the contractor is unable to meet the project completion date, requests for extensions must be made in writing. The request must explain, in detail, why the original project completion date will not be met. The request shall be sent to the DCO along with an informational copy to the Project Manager (PM). The request shall be made as soon as possible, but not later than ten (10) days prior to the original completion date. This request shall not negate penalties for liquidated damages unless an extension is granted by the DCO in writing.
7.3 Pre-Construction Meeting
Following the award of the contract and review and acceptance of the contractor’s pre-construction submittals, the prime contractor must attend a mandatory pre-work conference. The meeting shall be scheduled by the government, and conducted on-site, at the Mount Morris Dam, at a time and date to be announced following the award of the contract.
7.4 Work Schedule
All scheduled work is to be performed Monday through Friday 0830-1700 hours, excluding federal holidays. If the contractor desires to work beyond the previously stated hours and days, written permission to do so shall be obtained from the government. Schedule changes shall be requested a minimum of 48 hours in advance, unless there is an emergency situation.
7.5 Special Job Requirements
A Certified Industrial Hygienist is required in accordance with Federal regulations and the Corps Safety Manual (EM 385-1-1) to provide initial monitoring and evaluation of the confined space work conditions and babbitt resurfacing process. This will include a respiratory protection plan and selection of respiratory devices for any melting of the babbitt material. Additional monitoring and/or changes in the respiratory program will be performed any time a major change to the work process occurs.
Sealing water out and handling any leakage through the emergency gates shall be the Contractor’s responsibility, see Section 7.6 for information regarding water control.
Providing adequate ventilation and conforming to any applicable confined space requirements shall also be the responsibility of the Contractor. There is a 12” vent shaft that can be used and is located inside the conduit and outlets approximately 150 feet up to Level 3 of the dam.
No more than three (3) gates can be out of service at one time.
The government will provide 120V outlets as well as NEMA 14-30R 220V outlets at each gate bay.
7.6 Water Management During Construction
The emergency gate upstream of service gate will be closed to prevent water from entering the conduit during construction although some leakage is expected and the contractor should account for this. Under normal dam operating conditions, the tailwater elevation ranges between Elevation 581 and 583 (NGVD 29). In order to facilitate ease of construction, dam operators will be able to maintain the tailwater elevation at approximately no higher than
585.0 (NGVD 29) during the periods of April to December except during flood conditions as defined below. For reference the service gate sill elevation is 580.25 (NGVD 29) therefore the contractor will need to prevent the tailwater from entering the work area while working in the conduit. The slope of the conduit is 1 on 10.
Water releases through the dam will impact the Contractor’s operations. During heavy storm events, the number of gates open will, either be reduced, or completely closed to prevent additional damaging flows downstream. After the event has passed, releases will be made based on downstream conditions and channel capacity, to drain the reservoir.
Normal releases will maintain a tailwater elevation no higher than approximately 585.0 (NGVD 29). In very rare instances, releases may result in tailwater levels above 585.0 (NGVD 29) which may last from several days to several weeks. Every effort will be made to give the Contractor a 24-hour notification of gate changes. The Contractor shall constantly monitor weather conditions and forecasts and be prepared for potential emergency conditions. The Contractor shall constantly be prepared to secure and protect current working areas and personnel from flood releases.
The Contractor’s on-site superintendent will be notified of gate changes by the Government. Voice mail notification will be made when Government personnel are unable to contact the superintendent in person. The Government will make a concerted effort to completely avoid using conduits in which contracted work is occurring. However, should river flow, river basin conditions, and existing operating procedures necessitate, all nine conduits could be used to make releases from the reservoir. The Contractor is advised that rains far upstream from Mount Morris Dam may impact construction operations even though no rain in the immediate vicinity has fallen.
Mount Morris Dam reservoir data is available upon request. Any conclusions drawn by the Contractor from any of this data are done so at the Contractor’s risk. The point of contact for this information is Keith Koralewski at (716) 879-4358.
*NOTE: Only government personnel will operate the emergency and service gates and the contractor personnel will lock and tag out emergency gates in the conduits that are being worked in. Each person in the conduit shall have a lock on the system.
7.7 Material/Equipment Information
Contractor shall provide all labor, tools, ladders, scaffolding, equipment, supplies and materials needed to complete the work described herein, unless otherwise noted herein that any of these items will be provided by the government.
7.8 Dimension/Quantity Verification
Contractor shall independently measure and verify all dimensions and quantities given herein prior to ordering materials and supplies for the project. This information shall be provided to the government QA person as part of the pre-work submittals.
7.9 Material Storage
If temporary storage of project material is requested, the contractor shall make a written request to the government’s QA person and receive written approval from the government. If material is found to be hazardous, flammable, combustible, etc, the contractor will be required to provide the appropriate hazardous material storage locker. Storage locations will be discussed at the pre-bid site visit and during the pre-con meeting. See Section 18 of this SOW for further information.
7.10 Site Cleanup
All excess, waste, and removed material related to this project shall become the contractor’s property and shall be promptly removed from the site and disposed of or reused/recycled in accordance with applicable local, state, and federal regulations. Documentation describing disposal of material shall be furnished to the government as part of the project closeout files. The contractor shall not dispose of any project generated waste in government receptacles or on government grounds.
8 Quality Assurance (QA)
8.1 Overview
8.1.1 Government Project Manager (PM)
The government has appointed a Project Manager (PM) for this project. The PM shall ensure all questions of a technical nature concerning the contractual work are answered.
8.1.2 Government Contracting Officer Representative (COR)
The government will appoint a Contracting Officer Representative (COR) person to oversee the contract.
8.1.3 Government Quality Assurance (QA)
The government will appoint a Quality Assurance (QA) person to ensure all work is accomplished in accordance with contractual documents. The QA person for this contract will be identified after the contract is awarded. The
QA person serves as the liaison between the contractor, PM/COR, and the DCO. The QA person does not have the authority to modify contractual agreements.
8.1.4 Government Inspections
Contractor shall allow inspection by the government PM, QA person, DCO personnel, and District Safety and Health personnel, at any time during the life cycle of the project. The contractor shall provide safe access for government personnel visiting the project.
8.1.5 Product Data Sheets
The contractor shall provide to the government product data sheets from the manufacturer for all materials used on this job, as part of the pre-construction submittals. All materials shall be delivered to the project site in new condition, in their original containers and wrapping material, with labels clearly showing all product information.
8.2 Contractor Quality Control (CQC)
Contractor Quality Control (CQC) is the means by which the contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of this contract.
8.2.1 Quality Control Program (QCP)
Contractor shall refer to ‘Quality Control’ Specifications Section 01 45 00.00 10, Attachment #2 of this Statement of Work.
9 Communication
During the execution of the contract, the PM shall receive weekly status reports from the contractor on issues such as milestones met and/or missed, and issues standing in the way of project completion. The DCO shall be the communication hub for the government QA Person, COR/PM, and the contractor regarding clarification of contractual issues. By adhering to the established lines of communication, it will reduce or avoid generation of duplicate requests for information, which may inadvertently result acceptance of contractual changes without the approval of the DCO.
10 Repair/Restoration of Government Property Contractor, at no expense to the government, is required to protect all government facilities, grounds, equipment, sidewalks, and pavement during construction. All government structures, grounds, and equipment disturbed by contractor during the performance of work shall be returned to a pre-work condition prior to request of final payment.
Damages to government property that were caused by contractor and/or sub-contractor will be repaired at no expense to the government by the prime contractor.
11 Work Stoppage, Contract Cancellation Actions The Mount Morris Dam Park Manager, PM, or government QA person may issue temporary “Stop Work” notification if they find activities or job site conditions are in violation of Federal, Department of Defense, State or local health, safety and/or environmental standards, laws and regulations. The District Safety Officer (DSO), the DCO, and the PM shall be contacted immediately after a Stop Work notification order is issued or rescinded. Violation of health, safety or environmental regulations committed by the contractor shall not be grounds for compensation by the government to the contractor. Refer to contractual documents provided by the District Contracting Office regarding additional work stoppage and/or contract cancellation actions.
12 Material Change Orders Once equipment and materials are approved and accepted by the government, the contractor shall not substitute equipment or materials without providing a detailed explanation for the substitution. Changes in materials will require full justification and approval from the DCO. Modifications to contractual documents must be reviewed by the contractor, government QA person and PM, and approved by the government’s DCO. Requests for modifications must be in writing explaining the reasons for the modification, detailed description of the modification and what the benefits are and an estimated cost broken down by materials, labor and equipment.
13 Liquidated Damages Liquidated damages of $800 per calendar day will be assessed if the work is not completed within the time period described in Section 7.2 of this Statement of Work. Liquidated damages shall be assessed beginning the day following the end of the initial award period of performance.
14 Inspection/Testing
14.1 Materials Testing/Inspection
The contractor shall, at his/her own expense, perform analysis and tests following industry standards to demonstrate that materials are in conformity with the specifications. The government may check laboratories, equipment, and procedures for compliance with requirements. Signed testing reports shall be submitted to the PM.
14.2 Photo/Video Documentation of Work
The contractor will photo document all work before, during and after as well as video recording the gate to document/test the repaired seal prior to closing up and re-sealing the conduit. The photos and video shall be supplied to USACE construction representative in CD/DVD format after each week of work.
14.3 Pre-Final/Final Inspection
Upon completion of the work, the government will perform a pre-final inspection to verify that the project is complete. A government pre-final punch list may be developed as a result of this inspection. If contractual requirements are not met, this list shall be provided to the DCO, who will bring them to the attention of the contractor.
The contractor’s QC supervisor shall ensure that all items on this list have been corrected in a timely manner before notifying the government, so that a final inspection with the government and contractor can be scheduled. The contractor’s QC supervisor, PM, DCO representative, and QA person shall be in attendance at the final acceptance inspection.
15 Completion The contract will not be deemed fulfilled until all submittals, products, services, equipment, material, installation, construction work, final inspection and final cleanup of site is provided by the contractor under the terms of the contractual documents and found satisfactory to the DCO.
16 Payment The project will be paid for on a lump sum basis, the price for which includes all labor, materials, equipment, mobilization/demobilization, disposal, and other costs required to complete the work. Partial payment(s) may be made; this will be discussed at the pre-construction meeting.
17 Warranty
17.1 Warranty Period
Contractor shall, at a minimum, warranty all materials, equipment and workmanship against deficiencies for a period of eighteen (18) months from the date of acceptance of the work. The contractor shall also provide the manufacturer’s warranty for newly installed equipment and/or materials produced by said manufacturer. The period of warranty shall commence at time of government's acceptance of the work. If within the warranty period the installed equipment/materials incur breakdowns, excessive wear, or become unreliable, the costs to repair or replace installed equipment and materials shall be borne by the prime contractor. The warranty shall bear the name of the Buffalo District, U.S. Army Corps of Engineers as the recipient of the warranty and display the period of coverage. All warranties shall be submitted prior to request of final payment on this contract.
17.2 Repairs
When repairs are required because of defective workmanship during the warranty period, contractor shall make such repairs within three (3) weeks of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty and contractor shall reimburse the government for the cost of said repairs. Contractor shall not bill the government for costs of repair work and delay of payment due to repair work executed to resolve defective workmanship and/or problems with materials used and services provided.
18 Project Safety and Health Requirements/Accident Prevention Plans (APP):
The contractor shall follow all applicable Safety Requirements found in the USACE Safety & Health Requirements Manual per EM 385-1-1 available on-line at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf and attached UFGS-01 35 26 Governmental Safety Requirements
Required Submittals:
Preconstruction Submittals
- Accident Prevention Plan (APP)
- APP Checklist
- Activity Hazard Analysis (AHA)
- Proof of qualifications for Competent Persons/Site Safety and Health Officer(s) (SSHO); to include Copy of the 30-hour OSHA construction safety class completion certificate, resume of experience, documentation of 24/hr/yr formal safety training completed the past 4 years.
Submit reports as required
- Accident Reports via Eng Form 3394 Accident Investigation Report
- Monthly Man-Hour Exposure Reports by the 5th day of each month
Confined Space Entry Permits
- Hot Work Permits
- Lock-Out/Tag Out Permits
**** PREPARATION OF THE APP: Work shall not begin until the Site/Project Specific Accident Prevention Plan (APP) has been submitted to, and accepted by, the USACE Buffalo District Safety Office (SO). The APP shall be prepared following the format found in USACE publication U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual ER 385-1-1, Appendix-A (attached).
NOTE: Most of work will happen in a permit-required confined space.
19 Security
19.1 Start of Work
Contractor shall notify the Park Manager or COR of their planned arrival at the project to start work at least seven (7) calendar days in advance. Contractor shall submit a weekly work schedule thereafter by no later than the Friday before the coming work week.
19.2 Arrival/Departure
Contractor is required to notify the government QA person or Park Manager of their arrival to and departure from the project site. A similar notification is required if there shall be any deviation or cancellation of a scheduled work day during the life of the project.
19.3 Video/Camera Equipment
Contractor shall not transport or use video or camera equipment while working at Mount Morris Dam, except inside the conduit to document work, unless permission to do so is requested through the Park Manager or Lock Master and approval is granted by the Buffalo District Security Officer.
19.4 Personally Identifiable Information (PII)
For all prime and subcontractor employees working at Mount Morris Dam, the following Personally Identifiable Information (PII) shall be provided for the US Army Corps of Engineers to perform a limited background check:
Complete name, social security number, date of birth, place of birth, current address of residence, and driver’s ID number. This information is mandatory before any workers will be allowed to enter the facility. The contractor shall allow up to twenty-one (21) days from time of receipt for government completion of background checks. Work may not begin until government clearance of all employees is given to the prime contractor.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
20 Submittals
20.1 Bid Submittals
The following submittals are required from the contractor under this Scope of Work to be submitted with the bid proposal:
• Complete Bid Schedule with prices for all base and optional items. (See Attached)
• Contractor experience, manufacturer’s cut sheets, etc as stated in Section 7.1
• Other documentation as required by the DCO:
o Representations and certifications
20.2 Pre-Construction Submittals
All submittals are required as per the timeline described in Section 7.2 of this SOW:
• Project Submittals
• Material Safety Data Sheets
• Detailed Work Plan - As part of the pre-construction submittals, the contractor shall supply a detailed work plan with a timeline or schedule for accomplishing the work showing the following minimum information:
(a) Raising each gate and securing gate to accommodate rehabilitation work
(b) Methods for dewatering/controlling excess water in conduit
(c) Methods for removal, containment, and disposal of blast media
(d) Resurfacing of babbitt gate sill in sluice gate seat
(e) Submittal completion date
(f) Start date
(g) 100% completion date.
• Contractor employees Personally Identifiable Information (PII)
• Contractor Quality Control Plan (QCP)
• Contractor Quality Control Plan Checklist
• Accident Prevention Plan (APP) with Activity Hazard Analysis (AHA’s): Safety and health submittals as described in Section 18 and/or Attachment 1 of this Scope of Work will be submitted to the DCO. Safety and health submittals will be reviewed and accepted in writing by the DSO prior to commencement of work.
• All materials/equipment data sheets provided under the contract, including but not limited to:
o Belzona
20.3 Construction Submittals
All submittals are required as per the timeline described in Section 7.2 of this SOW:
• Monthly Man-Hour Exposure Report
20.4 Project Completion Submittals
All submittals are required as per the timeline described in Section 7.2 of this SOW:
• All required submittals required under this contract.
• Contractor warranty for all work performed under this contract.
• Applicable equipment O&M manuals, shop drawings, maintenance and repair instructions.
• Documentation for disposal of project waste material.
END OF STATEMENT OF WORK
Attachments Attachment #1 – Bid Schedule Attachment #2 – Quality Control Specifications Section 01 45 00.00 10 Attachment #3 – Quality Control System Specifications Section 01 45 00.10 10 Attachment #4 – Quality Control Plan Checklist Attachment #5 – Safety Specification Section 01 35 26 Attachment #6 – Accident Prevention Plan Checklist Attachment #7 – Blank Activity Hazard Analysis Attachment #8 – As-Built Drawings Attachment #9 – Conduit and Gate Inspection Report Attachment #10 – USACE Buffalo District Monthly Man Hour Exposure Report
Attachment #1 – Bid Schedule Mount Morris Dam, Mount Morris, New York
MMD Slide Gate Sealing Surface Rehabilitation
Item No. Description Bid Quantity Bid Unit Unit Price ($) Price ($)
Item 1 - Base Bid Item
Mobilization and Demobilization
1 JB
Item 2 – Base Bid Item
Rehabilitate the bottom sealing surface on service gates 7 through 9
EA
Item 3 – Optional Bid Item, Estimated Quantity
Rehabilitate the bottom sealing surface on service gates 1 through 6
6 (est qty) EA
TOTAL BASE BID AMOUNT (Items 1 & 2):________________
TOTAL OPTIONAL BID AMOUNT (Item 3):________________
TOTAL BID AMOUNT (Items 1-3):________________
Attachment #2 – Quality Control Specifications Section 01 45 00.00 10
SECTION 01 45 00.00 10
QUALITY CONTROL
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D3740 (2012a) Minimum Requirements for Agencies
Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM E329 (2013a) Standard Specification for
Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2012) International Building Code
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1110-1-12 (2006; Change 1) Engineering and Design --
Quality Management
1.2 PAYMENT
Separate payment will not be made for providing and maintaining an effective Quality Control program, and all associated costs will be included in the applicable Bid Schedule unit or lump-sum prices.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Establish and maintain an effective quality control (QC) system in compliance with the Contract Clause titled "Inspection of Construction."
QC consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the
Contracting Officer for non-compliance with the quality requirements specified in the contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent must maintain a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.
3.2 QUALITY CONTROL PLAN
Submit no later than 14 days after award, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction." Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional work.
3.2.1 Content of the CQC Plan
Include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified. Include a CQC System Manager who reports to the project superintendent.
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.
c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Copies of these letters must be furnished to the Government.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents.
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer must be used.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.
g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.
j. Any special inspection requirements as required in accordance with
ICC IBC
3.2.3 Acceptance of Plan
Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.4 Notification of Changes
After acceptance of the CQC Plan, notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. Submit the CQC Plan a minimum of 7 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government, signed by both the Contractor and the Contracting Officer and will become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure safety and contract compliance. The Safety and Health Manager must receive direction and authority from the CQC System Manager and serve as a member of the CQC staff. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff will be subject to acceptance by the Contracting Officer. Provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization. The CQC organization shall be responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.
3.4.2 CQC System Manager
Identify as CQC System Manager an individual within the onsite work organization who is responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract. This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager must be assigned as System Manager but may have duties as project superintendent in addition to quality control.
Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.
3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: mechanical, civil. These individuals may be employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein.
These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.
Experience Matrix
Area Qualifications
Civil Graduate Civil Engineer or Construction Manager with 2 years experience in the type of work being…