150506_Fairport_Harbor_Pre-Bid_Teleconf_Minutes_13May2015.pdf

PDF 34 KB Posted

Attached to
Fairport East Breakwater Repairs
Solicitation number
W912P4-15-B-0004
Issued by

About this file

Please see attachment with Pre-bid teleconference meeting minutes.

View the file

Other files

File Type Posted
Bid_Abstract_Fairport_East_26May2015.xls XLS spreadsheet
Amendment_1_13May2015.pdf PDF
Final_Solicitation_20Apr2015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAIRPORT HARBOR EAST BREAKWATER REPAIR

PRE-BID TELECONFERENCE

MEETING MINUTES, 6 MAY 2015

Project Manager: Geoffrey K. Hintz Available at: geoffrey.k.hintz@usace.army.mil

O: (716) 879-4155 BB: (716) 445-7722

MEETING OBJECTIVE: Review the Request for Proposal from contractual and technical perspective. Respond to bidder questions and concerns.

ATTENDEES (10 PEOPLE): Attendee list appended.

USACE: Geoffrey Hintz (Project Manager), Walter Kamad (contracting specialist), Kelly Maccarone (Plans & Specifications), Michael Mohr (Technical), Paul Polanski (Cost), Vito Melilli (Construction Management) Geo Gradel: David Finger, Wayne Moon Huffman Equipment Rental & Contracting: Richard Quandt Ryba Marine: Thomas Bajko

MEETING DETAIL:

INTRODUCTION: (W. Kamad) Discussed bid due date. Bids are due 21-MAY and will be opened at 3PM at the Buffalo District Office. All contractors on the call are to send W. Kamad an email that provides their names which will be used to send them the teleconference minutes.

All bidders have until 15-MAY to submit written RFP questions. USACE will respond in writing, copying in all bidders.

There will be no USACE sponsored site visit. Any contractor is welcome to visit the site by themselves.

CONCERNS: (D. Finger) Concerned that the schedule will be very difficult to produce the large armor stone and initate in-water work in 2015. Prefer to start in-water work 1 JUL 2016. This concern was shared by R. Quandt.

1) Will there be a new performance period? After the teleconference USACE discussed the schedule and concluded that NTP will remain the same with a revised expectation that in-water work will begin 1 JUL 2016, ending on 30 NOV 2016. Additionally, the Corps would be receptive to petitioning ODNR for in-water waiver if the successful contractor wanted to initiate work prior during the restriction period of 15-APR to 30-JUN.

SPECIFICATIONS: (K. Maccarone) Identified the in-water restriction is stated in P&S package Section 0135.13, paragraph 1.2.1 "Commencement".

The teleconference was adjourned when participants had nothing further to bring up.

G.K. Hintz mailto:geoffrey.k.hintz@usace.army.mil

FAIRPORT HARBOR EAST BREAKWATER REPAIR

PRE-BID TELECONFERENCE

MEETING MINUTES, 6 MAY 2015

Project Manager: Geoffrey K. Hintz Available at: geoffrey.k.hintz@usace.army.mil

O: (716) 879-4155 BB: (716) 445-7722

Company Name Representative Address Phone and Fax Email Ryba Marine

Construction Co. Thomas R. Bajko, P.E. 629 N. Main Street Cheboygan, MI 49721

(P) 231-627-4333 Ext. 12

(F) 231-627-4890 rybamarine@rybamarine.com

Huffman Equipment

Rental & Contracting, Inc.

Richard Quandt 1662 E 361st St # 10 Willoughby, OH 44095

(P) 440-951-2770

(F) 440-951-2797 huffman2770@aol.com

Geo Gradel Co

David Finger, Marine Operations/Project Manager

Wayne Moon

3135 Front Street, Toledo, Ohio 43605

(C) 419-265-0574

(O) 419-691-7123

DJFinger@geogradelco.com wmoon@geogradelco.com

USACE

Geoffrey Hintz, PM Buffalo Office: 716.879.4155 Geoffrey.K.Hintz@usace.army.mil Walter Kamad, Contracting Buffalo Office: 716 879-4134 Walter.Kamad@usace.army.mil Michael Mohr, Coastal Engineering Buffalo Office: 716 879-4168 Michael.C.Mohr@usace.army.mil Kelly Maccarone, Plans & Specs Pkg Buffalo Office: 716 879-4285 Kelly.L.Maccarone@usace.army.mil

Paul Polanski, Cost Engineering Buffalo Office: 716.879.4236 Paul.N.Polanski@usace.army.mil Vito Melilli, Cleve Office Sect Chief Cleveland Office: 216.685.1205 Vito.C.Melilli@usace.army.mil mailto:geoffrey.k.hintz@usace.army.mil https://www.google.com/url?sa=D&oi=plus&q=https://www.google.com/maps/place/Huffman%2BEquipment%2BRental%2BInc/data%3D!4m2!3m1!1s0x8831aa2be5019253:0x1120c093f6dca3a7?gl%3DUS%26hl%3Den https://www.google.com/url?sa=D&oi=plus&q=https://www.google.com/maps/place/Huffman%2BEquipment%2BRental%2BInc/data%3D!4m2!3m1!1s0x8831aa2be5019253:0x1120c093f6dca3a7?gl%3DUS%26hl%3Den mailto:huffman2770@aol.com mailto:djfinger@geogradelco.com