Questions and Answers from solicitation W912NW24Q0023.pdf
PDF 92 KB Posted
- Attached to
- Universal Grinding Machine
- Solicitation number
- W912NW24Q0023
About this file
This document contains questions and answers from solicitation W912NW24Q0023 seeking a universal grinding machine. The solicitation requires a machine capable of position adjustment on the B axis. A tailstock chuck is clarified as a work holding fixture similar to a headstock chuck but located on the opposite, tailstock end of the grinder to provide additional stability for long workpieces. Regarding installation, 480 VAC three-phase power and shop air will be provided within 30 feet where the contractor is responsible for final connections. A site visit will not be scheduled for this solicitation. The related federal contract opportunity is for universal grinding machines under solicitation number W912NW24Q0023 from the Department of the Army Materiel Command Contracting Command at Redstone Arsenal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912NW24Q0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Universal Grinder Ques�ons and Answers
1. Does the B axis spec require the B axis to feed, or just position? Answer- The need is for the position adjustment.
2. What is a tailstock chuck? Answer- A tailstock chuck is essentially the same thing as a headstock chuck, just on the other side (the tailstock) of the grinder. They are just work holding fixtures to support the free/opposite end of the workpiece with a center during machine operation. They are usually used when the part is especially long to provide more stability.
3. For example, “Installation including utility connections” is a listed requirement, but we need to examine the actual installation site for the specific information necessary to quote this. Will there be a site visit associated with this solicitation? If not, may we request a site visit be scheduled? Answer - 480 VAC – 3 phase and shop air will be provided within 30 ft. of point of installation, where it will then be up to the contractor to make the connections to the electrical panel and compressed air line at this point. A site visit will not be scheduled for this solicitation.