MVD Stone Items - Construction Pipeline Overview

This document is a construction pipeline summary from the U.S. Army Corps of Engineers Mississippi Valley Division (MVD) outlining four stone construction and repair projects scheduled for fiscal years 2026 and 2027. The projects total approximately 372,000 tons of stone materials with estimated costs ranging from $20-$35 million collectively. The FY26 Mississippi River Stone MATOC TO 1 - Stack Island Dike Construction project (86,000 tons; $5-$10M) is currently under contract and scheduled for completion in Q2. The FY27 Fort Jackson Stone Berm and Blanket project (220,000 tons; $10-$15M) is in the proposed work phase with anticipated activity in Q2-Q3. The FY26 Carrollton Bend Stone Berm project (36,000 tons; $0-$5M) and FY27 Above Williams Revetment 2025 Flood Repairs project (30,000 tons; $0-$5M) are both proposed work items scheduled for Q3 and Q4 respectively.

Two distinct contract vehicles are indicated: the Stack Island Dike project will be awarded under a Multiple Award Task Order Contract (MATOC), while the Above Williams Revetment project will be awarded under a Single Award Task Order Contract (SATOC). The document is dated October 2026 and includes a disclaimer that all project information is subject to change as designs are refined and impacts are quantified. Contact information for MVD is provided at 1400 Walnut Street, Vicksburg, MS 39180, with additional information available at www.mvd.usace.army.mil.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY26 Mississippi River Stone MATOC TO 1 - Stack Island Dike Construction: MVK+

FY27 Fort Jackson Stone Berm and Blanket

FY26 Carrollton Bend Stone Berm

FY27 Above Williams Revetment 2025 Flood Repairs: MVM*

CONSTRUCTION DURATION

UNDER CONTRACT PROPOSED WORK

U.S. Army Corps of Engineers 1400 Walnut Street, Vicksburg, MS 39180 www.mvd.usace.army.mil

MVD Stone Items

NOTE:

+ PROJECT INTENDED TO BE AWARDED UNDER A MULTIPLE AWARD TASK

ORDER CONTRACT (MATOC)

* PROJECT INTENDED TO BE AWARDED UNDER A SINGLE AWARD TASK

ORDER CONTRACT (SATOC)

OCTOBER 2026

U.S. ARMY CORPS OF ENGINEERS MISSISSIPPI VALLEY DIVISION

O

CT

, F Y2

TON ; $

STONE CONSTRUCTION & STONE REPAIR ITEMS

ALL PROJECT INFORMATION IS SUBJECT TO CHANGE AS DESIGNS ARE REFINED & IMPACTS ARE QUANTIFIED

Q1 Q2 Q3 Q4

PROPOSED

WORK

UNDER

CONSTRUCTION

86k ; $5-$10M

220k ; $10-$15M

36k ; $0-$5M

30k ; $0-$5M

Q1 Q2 Q3 Q4

Slide Number 1