SEE ADDENDUM
(No Collect Calls)
W912MM-17-T-0008 27-Jan-2017
b. TELEPHONE NUMBER
(605) 737-6543
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 07 Feb 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912MM9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TIMOTHY W. ANDERSH
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W907KK62950100
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
W912MM - USPFO FOR SOUTH DAKOTA
ATTN: TIM ANDERSH
EMAIL: TIMOTHY.W.ANDERSH.CIV@MAIL.MIL
2823 WEST MAIN - BLDG 420
RAPID CITY SD 57702-8170
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
605/737-6752FAX:
TEL: 605/737-6543 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$32,500,000
NAICS:
624230
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF21
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Radiological & Chemical Agents Lane Tng
FFP
These collective training exercises are intended to be 12-18 hour operational periods each, identified in CLINS 0001 and 0002 and are to be two separate lanes consisting of two full-scale CBRNE (Chemical, Biological, Radiological, Nuclear, and Explosive)/All-hazard exercises in Rapid City, SD. Focus of CLIN 0001 will be radiological and chemical agents training lane and CLIN 0002 will be a biological agents training lane to include, but not limited to, lab set ups and dispersal devices that focuses on meeting the CST Commander’s training objectives and designed to test the full readiness and response capabilities/operations of the 82nd CST.
Exercise Date and Location: Week of 6-10 March 2017, vicinity of Rapid City, SD. Each exercise is independent of the other and will be conducted on different days during that period. There shall be one day of refit will be between each exercise lane.
Services, Non-Personal
See Performance Work Statement (PWS) for complete details and requirements.
PR Number: W907KK 6295-0100
FOB: Destination
PURCHASE REQUEST NUMBER: W907KK62950100
NET AMT
0002 1 Each Biological Agents Lane Training
FFP
These collective training exercises are intended to be 12-18 hour operational periods each, identified in CLINS 0001 and 0002 and are to be two separate lanes consisting of two full-scale CBRNE (Chemical, Biological, Radiological, Nuclear, and Explosive)/All-hazard exercises in Rapid City, SD. Focus of CLIN 0001 will be radiological and chemical agents training lane and CLIN 0002 will be a biological agents training lane to include, but not limited to, lab set ups and dispersal devices that focuses on meeting the CST Commander’s training objectives and designed to test the full readiness and response capabilities/operations of the 82nd CST.
Exercise Date and Location: Week of 6-10 March 2017, vicinity of Rapid City, SD. Each exercise is independent of the other and will be conducted on different days during that period. There shall be one day of refit will be between each exercise lane.
See Performance Work Statement (PWS) for complete details and requirements.
Services, Non-Personal
0003 1 Each Biological Agents Lane Training
FFP
This collective training exercise is intended to be 12-18 hour operational period each, identified in CLINS 0003 and 0004 is to be two separate lanes consisting of two full-scale CBRNE (Chemical, Biological, Radiological, Nuclear, and Explosive)/All-hazard exercises in Sioux Falls, SD. Focus of CLIN 0003 will be biological agents and the focus of CLIN 0004 will be chemical agents to include, but not limited to, lab set ups and dispersal devices that focuses on meeting the CST Commander’s training objectives and designed to test the full readiness and response capabilities/operations of the 82nd CST.
Exercise Date and Location: Week of 28-31 March 2017, vicinity of Sioux Falls, SD. Each exercise is independent of the other and will be conducted on different days during that period. There shall be one day of refit will be between each exercise lane.
See Performance Work Statement (PWS) for complete details and requirements.
Services, Non-Personal
0004 1 Each Chemical Agents Lane Training
FFP
This collective training exercise is intended to be 12-18 hour operational period each, identified in CLINS 0003 and 0004 is to be two separate lanes consisting of two full-scale CBRNE (Chemical, Biological, Radiological, Nuclear, and Explosive)/All-hazard exercises in Sioux Falls, SD. Focus of CLIN 0003 will be biological agents and the focus of CLIN 0004 will be chemical agents to include, but not limited to, lab set ups and dispersal devices that focuses on meeting the CST Commander’s training objectives and designed to test the full readiness and response capabilities/operations of the 82nd CST.
Exercise Date and Location: Week of 28-31 March 2017, vicinity of Sioux Falls, SD. Each exercise is independent of the other and will be conducted on different days during that period. There shall be one day of refit will be between each exercise lane.
See Performance Work Statement (PWS) for complete details and requirements.
Services, Non-Personal
0005 1 Each CBRNE / All Hazards Relief in Place Ops
FFP
This exercise is intended to be a 24-48 hour operational period, joint CST exercise between two (2) full CST’s focused on CBRNE/All-hazard response with an emphasis on CST relief-in-place operations to meet the CST Commander’s training objectives and designed to test the full readiness and response capabilities/operations of the 82nd CST (South Dakota) and 83rd CST (Montana).
Exercise Date and Location: Week of 21-25 August 2017, Forsyth MT
See Performance Work Statement (PWS) for complete details and requirements.
Services, Non-Personal
0006 1 Each Contractor Manpower Reporting
FFP
The Office of the Assistant Secretary of the Army (Manpower& Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address:
https://contractormanpower.army.pentagon.mil or https://cmra.army.mil
The required information includes:
1. Contracting Office and Contracting Officer
2. Contract number, including task and delivery order number (if applicable)
3. Beginning and ending dates covered by reporting period
4. Contractor name, address, phone number, e-mail address, identity of contractor
5. Estimated direct labor hours (including subcontractors)
6. Estimated direct labor dollars paid this reporting period (including subcontractors)
7. Total payments (including subcontractors)
8. Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different) FSC Code R429.
9. Estimated data collection cost
10. Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information)
11. Locations where contractor and subcontractors (if applicable) perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website)
12. Presence of deployment or contingency contract language
13. Number of contractor and subcontractor employees deployed in theater this reporting period.
As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website.
The XML direct transfer is a format for transferring files from a contractor's systems to the secure website without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
STATEMENT OF WORK
PERFORMANCE WORK STATEMENT (PWS) – Services Non-Personal
Training Exercise - 82nd Civil Support Team (CST) Collective Lanes Training
Applicable to:
CLIN 0001: Radiological & Chemical Agents Lane Tng, Week of 6-10 March 2017, Rapid City, SD CLIN 0002: Biological Agents Lane Training, Week of 6-10 March 2017, Rapid City, SD CLIN 0003: Biological Agents Lane Training, Week of 28-31 March 2017, Sioux Falls, SD CLIN 0004: Chemical Agents Lane Training, Week of 28-31 March 2017, Sioux Falls, SD
Description/Overview: Reference each respective CLIN Description Exercise Date and Location: Reference each respective CLIN Description
When there are multiple exercises in the same week, each exercise is independent of the other and will be conducted on different days during that period. There shall be one day of refit will be between each exercise lane.
Full-Scale CBRNE Field Training Exercise
1. Exercise will facilitate the need/use of the entire 82nd CST; approximately 22 personnel.
2. Desired facility (determined by Contractor with assistance from the 82nd CST) will be located in the training vicinity identified or local area of 50 mile radius of the training incident and must be adequate enough to exercise the entire response of the Civil Support Team and meet the training objectives.
3. Each exercise will commence NLT 0700 hours on the exercise training day and will conclude when all phases of the CST operational deployment and IC objectives have been completed or the timeline from the venue/facility management has been exhausted (approximately 12 – 18 hour operational period). Exact start time will be confidential until commencement (Alert/Notification) of the exercise. 82nd CST will be alerted/notified of exercise start via SD National Guard Joint Operations Center.
4. Exercise will be a free-flowing, full-scale CBRNE response with CST actions driven by the exercise scenario and contractor intelligence/injects.
5. Exercise will be designed to create an environment for the Unit’s Commander to accurately measure the team’s training and proficiency levels.
6. Any laboratory scenes utilized for training should include fully functional lab ware/apparatuses with the exception of any materials, products, or processes deemed illegal by the State of South Dakota, specific facility management team, or the Federal Government.
7. Laboratory scenarios should have any of the following: lab-grade or improvised glassware, hot plates, cooling/heating baths, centrifuge, pipettes, condensers, diffusers, incubators, and/or any other lab item/process deemed necessary by the Contractor; with the exception of any item deemed illegal by the State of South Dakota, facility management, or the Federal Government. (82nd may have access to some of these items).
8. It is the responsibility of the Contractor to receive prior approval from the facility management team of the ‘target’ location/venue, in order to utilize materials or products for simulation during this scenario.
9. The training lane will provide an environment to successfully evaluate the twelve (12) Civil Support Team Mission Essential Tasks during a realistic CBRNE scenario with sophisticated training aids and simulators in order to challenge the CSTs detection and analytical capabilities.
10. The exercise should involve one (1) or more civilian first responder or emergency operations agencies in order to test the cooperation, communication, and coordination of a multi-agency response to a CBRNE, man-made, or natural event/incident/disaster in which the CST would be involved.
11. The 82nd CST Command and/or Operations sections can assist with the coordination/notification of individuals or agencies that have typically been able and willing to assist with FTX inclusion/training opportunities.
*CST must be able to pick up readings while utilizing their organic detection and monitoring devices from stimulants in order to create a ‘real’ scenario and assist in creating the common operational picture.
**Simply giving verbal readings/numbers throughout the duration of exercises is not sufficient to test and/or provide confidence in the CST CBRNE equipment.
Contractor will provide:
1. Design of the exercise to meet objectives set by the 82nd Civil Support Team.
2. Each exercise will be designed for an operational period of 12 - 18 hours of response activity in order to avail the 82nd CST adequate time to employ all aspects of a response; Alert & Notification, Movement from predetermined staging areas in the vicinity of the incident location, PMT/Hot Zone verification, Site Characterization Monitoring & Detection (2-4 entries in order exhaust/stress the CST future plans process and/or personnel; will be negotiated based on CST Commander input, objectives, and outcomes), Sample Retrieval and Analysis, and Re-deployment.
Decontamination operations will take place between each down range entry operation along with team briefings and debriefings.
3. Command and Control of the exercise to include the use of an Incident Commander (local Fire personnel or Contractor provided) knowledgeable in ICS and NIMS; operational flow and intelligence injects; safety oversight (with assistance from 82nd CST Safety Officer/NCO); exercise feedback.
4. Development of a written exercise plan and evaluation. The written evaluation format is not specified and is left to the discretion of the vendor. The 82nd CST relies heavily on written feedback and a fully honest evaluation that is quantifiable and can be used as a learning tool to implement change or improvements into the process of the 82nd CSTs incident response. The use of the Army UTL 0300627-35 will be a very good guide for evaluation.
5. Facilitation of an exercise Hot Wash/After Action Review (AAR) at the conclusion of the operational period/exercise.
6. A written AAR delivered to the 82nd CST no later than 21 days after completion of the exercise in order to utilize feedback for process improvement, best practices, SOP revisions, and TPE preparations.
7. Design, Construction, Installation and removal of HazMat/CBRNE/WMD scene created by a manmade or natural incident (removal may be assisted by the 82nd CST).
8. Development of a master event scenario list (MESL)/exercise plan (EXPLAN) to facilitate a smooth and successful scenario (presented to 82nd CST at the completion of the exercise).
9. Contractor will facilitate adequate exercise planning meeting(s) to determine CST objectives and venue for the full-scale FTX. At a minimum, one face to face coordination meeting will occur approximately 4 weeks prior to the scheduled exercise lanes at the training location identified. There will be one on-site meeting at the Rapid City location and one at the Sioux Falls location. Additional planning meeting(s) may be conducted via video-teleconference, conference phone call or other means available in order to provide effective and efficient planning in lieu of fiscal and/or time constraints.
10. Shipping of props, equipment, simulants (items necessary for the scenario) to and from exercise location.
11. No contractor will be on government orders at any given time.
12. All Monitoring/Testing equipment necessary for successful completion within the scope of the exercise will be provided and utilized by the 82nd CST.
Joint Training Exercise – 82nd & 84th Civil Support Team (CST) Collective Lanes Training Week of 21-25 August 2017, Forsyth, MT
CLIN 0005: CBRNE / All Hazards Relief in Place Operations
Description/Overview:
This exercise is intended to be a 24-48 hour operational period, joint CST exercise between two (2) full CST’s focused on CBRNE/All-hazard response with an emphasis on CST relief-in-place operations to meet the CST Commander’s training objectives and designed to test the full readiness and response capabilities/operations of the 82nd CST (South Dakota) and 83rd CST (Montana).
Exercise Date and Location:
Week of 21-25 August 2017, Forsyth MT
Joint CST Training Exercise:
1. Exercise will facilitate the need/utilization of two entire CST’s; approximately 44 personnel and conduct relief in place operations between the two CST’s in Forsyth, MT.
2. Desired facilities (determined by Contractor with assistance from the 82nd and 83rd CST) used for this exercise is currently unknown but must be adequate enough to exercise the entire response package of the CST’s and meet the training objectives.
3. Exercise will commence at a time predetermined in a coordination meeting between the contractor and 82nd and 84th CST’s and will conclude when all phases of the CST operational deployment and IC objectives have been completed or the timeline from the venue/facility management has been exhausted (approximately 24 – 48 hour operational period). Exact start time will be confidential until commencement (Alert/Notification) of the exercise.
82nd CST will be alerted/notified of exercise start via SD National Guard Joint Operations Center and the 83rd CST notified via the MT National Guard Joint Operations Center.
4. Exercise will be free-flowing, full-scale CBRNE response with CST actions driven by the exercise scenario and contractor intelligence/injects.
5. Any laboratory scenes utilized for training should include fully functional lab-ware/apparatuses with the exception of any materials, products, or processes deemed illegal by the State of South Dakota, state of Montana, specific facility management team, or the Federal Government.
6. Multiple laboratory scenes should have any of the following: lab-grade or improvised glassware, hot plates, cooling/heating baths, centrifuge, pipettes, condensers, diffusers, incubators, and/or any other lab item/process deemed necessary by the contractor; with the exception of any item deemed illegal by the State of South Dakota and or Montana, facility management, or the Federal Government. (82nd may have access to some of these items).
8. It is the responsibility of the contractor to receive prior approval from the facility management team of the ‘target’ location/venue, in order to utilize materials or products for simulation during this scenario.
9. The joint exercise training lane will provide an environment to successfully exercise both CST’s capabilities and include a realistic CBRNE scenario with sophisticated training aids and simulators in order to challenge the CSTs monitoring, detection, and analytical capabilities.
10. The exercise should involve one (1) or more civilian first responder or emergency operations agencies in order to test the cooperation, communication, and coordination of a multi-agency response to a CBRNE, man-made, or natural event/incident/disaster in which the CST would be involved.
11. The 82nd and 83rd CST’s Command and/or Operations sections can assist with the coordination/notification of individuals or agencies that have typically been able and willing to assist with FTX inclusion/training opportunities.
*CST must be able to pick up readings while utilizing their organic detection and monitoring devices from stimulants in order to create a ‘real’ scenario and assist in creating the common operational picture.
**Simply giving verbal readings/numbers throughout the duration of exercises is not sufficient to test and/or provide confidence in the CST CBRNE equipment.
Contractor will provide:
1. Design of the exercise to meet objectives set by the 82nd & 83rd Civil Support Team.
2. Exercise will be designed for an operational period of 24-48 hours of response activity in order to avail the 82nd & 84th CST adequate time to employ all aspects of a response; Alert & Notification, Movement from staging area to incident Forsyth, Mt location, PMT/Hot Zone verification, Site Characterization Monitoring & Detection (1 – 3 entries each CST), Sample Retrieval and Analysis, and Re-deployment. Decontamination operations will take place between each down range entry operation along with team briefings and debriefings.
3. Command and Control of the exercise to include the use of an Incident Commander (local Fire personnel or Contractor provided) knowledgeable in ICS and NIMS; operational flow and intelligence injects; safety oversight (with assistance from 82nd & 83rd CST Safety Officer/NCO); exercise feedback.
4. Development of a written exercise plan and evaluation. The written evaluation format is not specified and is left to the discretion of the vendor. The CST relies heavily on written feedback and a fully honest evaluation that is quantifiable and can be used as a learning tool to implement change or improvements into the process of the CSTs incident response. .
5. Facilitation of an exercise Hot Wash/After Action Review (AAR) at the conclusion of the operational period/exercise.
6. A written AAR delivered to the 82nd & 83rd CST no later than 30 days after completion of the exercise in order to utilize feedback for process improvement, best practices, SOP revisions, and TPE preparations.
7. Design, Construction, Installation and removal of HazMat/CBRNE/WMD scene created by a manmade or natural incident.
8. Development of a master event scenario list (MESL)/exercise plan (EXPLAN) to facilitate a smooth and successful scenario (presented to 82nd & 83rd CST trusted agents at the completion of the exercise).
9. Contractor will facilitate adequate exercise planning meeting(s) to determine CST objectives and venue for the full-scale FTX. Minimum of one planning meeting approximately 4 weeks prior to the exercise will require physical presence in Forsyth, MT. Additional coordination meetings may be conducted via video-teleconference, conference phone call or other means available in order to provide effective and efficient planning in lieu of fiscal and/or time constraints.
10. Shipping of props, equipment, simulants (items necessary for the scenario) to and from exercise location.
11. No contractor will be on government orders at any given time.
12. All Monitoring/Testing equipment necessary for successful completion within the scope of the exercise will be provided and utilized by the 82nd CST.
OPERATIONAL SECURITY
Operational Security Requirements
1. AT Level I Training: The contractor and their staff will complete Level I AT training.
2. Access & general protection: The contractor and all associated sub-contractors shall comply with applicable installation, facility and area access and local security policies and procedures (Provided by gov't representative). If required, contractor must comply with all personal identity verification requirements as directed by local policy. If unescorted access is deemed necessary, contractor will submit a NCIC background check and favorable evaluation as required.
3. OPSEC Info: The contractor will protect controlled unclassified information (i.e. training times, number of personnel, etc) pertaining to daily operations.
INFORMATION/REQUIREMENTS
Contractor Staffing & Requirements:
Contractor will provide and utilize a staff that is adequate to assist in facilitating a safe and successful scenario.
Contractor will identify in their quote the number of staff, staff positions and duties of staff they will provide for the individual lanes training. The following are staffing suggestions in order to provide adequate safety, observation, data collection, and medical intelligence and updates as it benefits the 82nd Civil Support Team:
1. One (1) Exercise Planner/Observer-Controller – to facilitate planning, meetings, exercise design, exercise control, and evaluates the 82nd CST Command section during the response operation.
2. One (1) Senior Observer-Controller – assist with exercise design, supervise OC’s, safety over-site, and evaluate CST Operations and Communications during the response operation.
3. One (1) Survey Observer-Controller – to provide safety over-site and evaluation of the Survey section’s down-range/entry teams and response operations.
4. One (1) Medical Observer-Controller – to provide medical or knowledgeable individual to provide information flow between the CST Physician Assistant and a simulated Medical Treatment Facility for casualties/casualty status/signs & symptoms/general medical information exchange for realistic inclusion and engagement of medical personnel during the scenario.
*The CST does not exercise Mass Casualty scenarios in which the CST is expected or requested to participate in the extrication, triage, and evacuation of casualties from the incident location. Although considered a first responder agency, the CST will not respond to an incident during the initial ‘golden hour’ when the loss of life, limb, or eyesight is an eminent threat.
Contractor Qualifications:
1. Contractor and/or their staff must have previously facilitated and/or participated a full-scale training exercises as identified in the PWS for each CLIN/exercise stated in the requirement a full-scale CBRNE/Hazardous Materials training exercise for other CSTs and/or multiple first responder agencies.
2. Contractor and/or their staff must be intimately familiar with the mission, objectives, training requirements, equipment parameters and shortfalls, and exercise needs of a Civil Support Team, (Weapons of Mass Destruction);
based on prior experience with CSTs within the region/nation.
3. Anti-terrorism/Operations Security (AT-OPSEC). AT Level I Training: The contractor and their staff will complete Level I AT Training and provide the certificates at least one week prior to the exercise. Certificates, if training was previously completed, shall be dated within one year of the first exercise.
Information/Requirements
All contractors/vendors wishing to contract with the Government for services or supplies must register in System for Award Management (SAM). This must be accomplished before any prospective contractor can receive a contract award. Visit https://www.sam.gov/sam/ to register. See Clause 52.204-7 in the clause section for more information.
CONTRACTOR MANPOWER REPORTING - Reference CLIN 0006, The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of Army CMRA via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil/
ELECTRONIC INVOICING - Vendors will be paid by Electronic Funds Transfer (EFT) and this contract requires invoicing to be accomplished through Wide Area Work Flow (WAWF), the Government Point of Entry. Vendors will be required to register with WAWF to accomplish invoicing. Details to accomplish invoicing in WAWF will be published with the award document.
Provide the following with your quote:
a. Reference Clause 52.212-2 for additional details.
Submit questions, quote and required documents to:
Timothy W. Andersh Contract Specialist
(605) 737-6543 timothy.w.andersh.civ@mail.mil
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 06-MAR-2017 TO
10-MAR-2017
N/A DELIVERY SCHEDULE
POC LISTED IN CLIN OR SCHEDULE
DETAILS IN CLIN OR SCHEDULE
. SD .
SEE POC TELE IN CLIN OR SCHEDU
W907KK
0002 POP 06-MAR-2017 TO
10-MAR-2017
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 28-MAR-2017 TO
31-MAR-2017
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 28-MAR-2017 TO
31-MAR-2017
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 21-AUG-2017 TO
25-AUG-2017
N/A (SAME AS PREVIOUS LOCATION)
0006 29-SEP-2017 1 82ND CST
LTCOL DALE GADBOIS
1319 KENNY ROAD BLDG 1012
ELLSWORTH SD 57706
(605) 737-6545
CLAUSES INCORPORATED BY REFERENCE
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUL 2013
52.204-13 System for Award Management Maintenance OCT 2016 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.212-1 Instructions to Offerors--Commercial Items APR 2014 52.212-3 Alt I Offeror Representations and Certifications--Commercial
Items (DEC 2016) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items FEB 2012 52.212-5 (Dev) Contract Terms and Conditions Required to Implement
Statutes or Executive Orders--Commercial Items (Deviation)
APR 2012
52.213-3 Notice to Suppliers APR 1984 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-28 Post-Award Small Business Program Rerepresentation APR 2012 52.222-3 Convict Labor JUN 2003 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-41 Service Contract Labor Standards MAY 2014 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014 52.222-99 (Dev) Establishing a Minimum Wage for Contractors (Deviation
2014-O0017)
JUN 2014
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
DEC 2012
52.232-1 Payments APR 1984 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-2 Service Of Protest SEP 2006 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.243-1 Alt II Changes--Fixed-Price (Aug 1987) - Alternate II APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding of Unclassified Controlled Technical Information
NOV 2013
252.204-7012 (Dev) Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2015
252.212-7001 (Dev) Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items (Deviation)
DEC 2010
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic (Nov 2014)
NOV 2014
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
252.232-7006 Wide Area WorkFlow Payment Instructions MAY 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.247-7023 Alt III Transportation of Supplies by Sea (May 2002) Alternate III MAY 2002
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government intends to award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. This is an all or none award meaning the government’s intent is to make one award for all training exercises. The results of each exercise will be used to enhance the training in the following exercise based on the hot wash and AAR.
(b) The following factors shall be used to evaluate offers:
1. Contractor Staffing: Reference PWS and Contractor Staffing & Requirements.
Identify the number of staff, staff positions and duties of staff they will provide for the individual lanes training.
2. Past Performance: Provide a minimum of 2 references from within one year for similar training exercise. Provide point of contact name, location, phone number, exercise conducted and date of exercise.
a. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.
b. The evaluation may take into account past performance information regarding predecessor companies or key personnel who have relevant experience as required. If using past performance of key personnel, provide two references within the past year for each employee.
c. Offerors may provide information on problems encountered on the identified contracts and the offeror corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the offeror past performance. The source selection authority shall determine the relevance of similar past performance information.
3. The contracting officer may determine an offer noncompliant with the terms and conditions of the solicitation if the contractor does not provide the information requested, specifically:
a. Signed SF1449 (Page 1)
b. SF 1449 (Pages 2-9) Pricing in CLINS 0001-0006. CLIN 0006 may be “Not Separately Priced”.
c. Contractor Staffing per PWS and paragraph (b)1 above.
c. References as specified in past performance in paragraph (b)2 above.
d. Copy of General Liability Insurance Certificate
e. Completed Provision 252.209-7999 Dev - Representation By Corporations Regarding An Unpaid Delinquent Tax Liability Or A Felony Conviction Under Any Federal Law—
f. DUNS Number, CAGE Code, Tax ID Number
(c) Evaluation process:
a. The Government will evaluate all proposals for responsiveness; if the proposal is incomplete it will not be evaluated.
b. The Government will evaluate all price proposals first, determining completeness with regard to price.
c. After determination of completeness with regard to price, the Government will rank offerors from lowest price to highest price.
d. The Government intends to evaluate proposals in rank order from lowest-priced to highest-priced until such time they find an acceptable proposal.
e. At that time, the Government will review eligibility requirement of the apparent awardee for responsibility.
f. All other proposals will only be evaluated in case the lowest-priced, technically acceptable offeror is unwilling/unable to enter into a contract with the Government.
(d) To be eligible for award, a proposal must meet all technical and eligibility requirements listed in the Performance Work Statement, conform to all required terms and conditions and include all information required.
(e) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
52.216-21 REQUIREMENTS (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 25 August 2017.
(End of clause)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.arnet.gov/far www.acq.osd.mil www.deskbook.osd.mil
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far www.acq.osd.mil www.deskbook.osd.mil
(End of clause)
252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-O0004) (JAN 2012)
(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012,(Pub. L.
112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that—
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that—
(1) It is [ ___ ] is not [ ___ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability,
(2) It is [ ___ ] is not [ ___ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
QASP
CONTRACTOR’s SERVICE DELIVERY SCHEDULE
The Contractor Service Delivery Schedule identifies the major tasks or deliverables the contractor will be providing or accomplishing during the contract period. The schedule identifies the task standards, the acceptable level of quality and the primary method the Government will use to assess the contractor’s performance.
Deliverable/Tasks Performance Standard Acceptable Quality Level
Method Used/ Frequency
Pre Scenario training coordination between participating agencies
Facilitate adequate exercise planning meeting(s) to determine objectives and venue for full scale FTX and determine/coordinate facilities/location/venue
100% of time
-Daily inspections and spot checks
Full-scale CBRN Training Exercise(s) Designed to meet 82nd CST objectives
100% of time -Daily inspections and spot checks
AT Level 1 Training
The contractor and their staff will complete Level I AT training and provide certificates 1 week prior to the first exercise beginning.
-Certificates prior to first exercise.
Involve civilian agency
The exercises shall involve one (1) or more civilian first responder or emergency operations agencies
Command and Control
Command and control of exercises to include Incident Commander (local fire personnel or contractor provided) and spot checks
Written exercise plan and evaluation
Development of a written exercise plan and evaluation for each exercise
100% of time -Daily inspections and spot checks
MESL/EXPLAN Develop master event scenario list (MESL) / exercise Plan (EXPLAN) to facilitate exercises
100% of time -Daily inspections and spot checks
Hot-Wash/AAR Facilitate Hot-Wash/AAR at the conclusion of each exercise
100% of time -Daily inspections
Written AAR
Provided within number of days specified in Performance Work Statement after completion of exercise and spot checks
Equipment, props, simulants and supplies
Contractor provides all appropriate equipment and supplies to conduct exercise. Design, construct, install and remove HazMat/CBRNE/WMD scene and spot checks
Detection and monitoring device
CST must be able to pick up readings while utilizing their organic detection and monitoring devices from stimulants and spot checks
Personal/Staffing Requirements
Contractor provides qualified and sufficient personnel in support of and during the exercise
100% of time -Daily inspections and spot checks
Timely Services Meet training timelines per performance work statement (PWS)
100% of time -Daily inspections and spot checks
Training services are IAW contract requirements
Training follows the Unit Task List for Weapons of Mass Destruction – Civil Support Team and meet laboratory scene requirements per PWS
W912MM-17-T-0008
QUALITY CONTROL AND QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The Government will monitor/perform surveillance the Contractor’s performance using the Quality
Assurance Surveillance Plan (QASP). Government personnel will record all surveillance observations. When an observation indicates substandard performance (i.e. yellow or red ratings), the Government POC/COR must annotate their findings on the QASP form and must immediately acquire the Contractor’s initials, or their representative at the site, on the completed QASP. The initialing does not necessarily constitute concurrence with the observation, only acknowledgement that the Contractor or their representative has been made aware of the substandard performance. Government surveillance of tasks not listed on the QASP or by methods other than those listed herein may occur during the performance of the contract. Any action taken by the Contracting Officer as a result of surveillance will be in accordance with the terms of the contract.
Metrics and Methods are designed to determine if performance exceeds, meets or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral or negative outcome. The following ratings shall be used:
GREEN Performance meets or exceeds contract requirements to the Government's benefit.
YELLOW Substandard Performance was corrected on the spot.* RED Substandard Performance that was not corrected on the spot or at all.*
* Government POC/COR must annotate their findings on the QASP form and must immediately acquire the Contractor’s initials, or their representative at the site, on the completed QASP.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) WORKSHEET
Instructions for Performance Rating – Within the elements listed below, the evaluator must “check” the applicable rating and annotate any/all sub-standard performances. Additional elements may be noted in the "Other" below.
Deliverable/Service
Quality Rating
Causative Factors Effect on Mission
Action Required / Date
Pre Scenario training coordination between participating agencies
Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Exercise execution \ proper equipment provided
Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Quality of contractor staff facilitating the exercise
Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Safety measures in place
Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Adhere to Antiterrorism / Operational Security Requirements
Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Post exercise activities Hot Wash and Written AAR
Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Other Green Comments Unnecessary for “Green” QA Rating.
Yellow Red
Government POC/COR must submit a completed QASP worksheet with each DD250/SF1449 receiver’s report.
CLIN/Exercise Name:
Exercise Dates:
Gov’t POC/COR Name (print) Contractor’s Representative Name (print)
Signature of Gov’t POC/COR Date Signature of Contractor’s Representative Date
File details come from the government source that posted it. Updated .