Questions-Answers_TKWR182303_Aguadilla.pdf
PDF 170 KB Posted
- Solicitation number
- W912LR-R-5002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign_In_Sheet_060518.pdf | ||
| 4._QASP_TKWR182303.docx | DOCX document | |
| W912LR-18-R-5002.pdf | ||
| 2._PWS_TKWR182303.rtf | RTF text file | |
| 3._SOW_-_TKWR182303-BOUND.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.: TKWR182303
PROJECT NAME: REPAIR BUILDINGS 1,6,11,13,33 AND 35 INT/EXT AND PERIMETER FENCE
QUESTIONS:
A. Building 1
1. Dimensions of the windows of the RM108 to seal it.
A: Site visit verification requirement
2. Drawings and details of the structure of the "Cement board" of 130 ft.
A: Not available. Site visit verification requirement
B. Building 7
1. What is the area of the affected wood floor? Please indicate percent to consider
A: 50% (Site visit verification requirement for actual)
2. What are the specifications of the membrane and the type of seal?
A: WBDG site Spec 07 57 13
C. Building 6
1. Indicate if you will work with the "aluminum exterior ladder cage"
A: No. Remove from scope
2. Details of the works to be done in "Replace partition wall panel and ceiling on 2nd level"
A: Replace with same. Site visit requirement to verify
D. Building 13
1. We suggest an Allowance for the work of the fire system.
A: Remove from scope
2. We suggest an Allowance for the inspection and replacement of the other lamps.
A: Remove from scope
3. We request the square feet of the walls or cross-sectional details for the insulation.
A: SF of the wall was required to be verified at site visit.
E. Building 33
1. Dimensions of the louvers to repair
A: Contractor was required to verify dimensions during site visit
F. Building 35
1. Indicate square feet of VCT floor to be removed and replaced. We recommend an Allowance.
A: Allowance 2000 SF
G. Building 11 and its surroundings
1. Square feet of fence to be repaired
A: Site visit requirement to be verified for actual measurement
2. More details of the improvement works in the "bent metal supporting and electrical panel" and in the communications manhole.
A: Replace with the same. Site visit requirement (typical manhole)