QASP - Lift Pump Station Rehab CSJTC.pdf
PDF 286 KB Posted
- Attached to
- Camp Santiago Sanitary Lift Station
- Solicitation number
- W912LR-20-P-2020
- Issued by
-
Department of the Army National Guard
About this file
This document provides details for an upcoming federal contract opportunity to rehabilitate a sanitary lift station and entrance channel at Camp Santiago Joint Training Center in Puerto Rico. The Puerto Rico Army National Guard intends to issue a firm fixed-price invitation for bid seeking a contractor to demolish old infrastructure, construct a new entrance channel, perimeter fence, drainage lines, garbage station, and rehabilitate the lift pump station. The project value is between $250,000 and $500,000 with a 365-day period of performance. The North American Industry Classification System code for this work is 238220. This opportunity is set aside 100% for small businesses. Interested contractors should attend the pre-proposal conference on July 4, 2020 and site visit to receive a day pass. Questions are due by August 10, 2020 and bids are due by September 8, 2020. The award will be made to the lowest priced technically acceptable offeror without discussions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TE3 - Lift Pump Station Rehabilitation Drawings.pdf | ||
| SOW - Gray Water Lift Pump Station Rehab CSJTC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Ver May 2018)
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Pit Entrance Channel and Lift Pump Station Rehabilitation
For
Camp Santiago Joint Training Center (CSJTC), Salinas Puerto Rico (PR)
Issued 06 May 2020 ii
TABLE OF CONTENTS
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Technical Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
(Ver. May 2018) 1
1 INTRODUCTION
This QASP is pursuant to the requirements listed in the scope of work statement (SOW) entitled Pit
Entrance Channel and Lift Pump Station Rehabilitation at Camp Santiago Joint Training Center (CSJTC), Salinas Puerto Rico (PR). This plan sets forth the procedures and guidelines the Puerto Rico National
Guard (PRNG) and the Contracting Officer Representative (COR) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team
(IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to
“how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by COR to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance
(QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and
(Ver. May 2018) 2 implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The Contracting Officer Representative/Contracting Officer Technical Representative
(COR/COTR) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, cost control and for resolving any differences between the observations documented by the COR/COTR and the contractor. The KO will designate one full-time COR/COTR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.
2.2 The COR/COTR
The COR/COTR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR/COTR limitations are contained in the written appointment letter. The COR/COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR/COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR/COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
Random monitoring, which shall be performed by the COR/COTR designated inspector.
100% Inspection – Each month, the COR/COTR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
(Ver. May 2018) 3
Periodic Inspection – COR/COTR typically performs the periodic inspection on a monthly basis.
4.2 Customer Feedback
4.2.1 The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction.
Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
4.2.2 Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR/COTR as opposed to the contractor.
4.2.3 Customer complaints, to be considered valid, must set forth clearly and in writing. The detailed nature of the complaint must be stated, document signed and forwarded to the COR/COTR. Upon receipt of a complaint, the COR/COTR will investigate and document the findings on the monitoring form, Attachment 2 and in the COR file.
4.2.4 Customer feedback may also be obtained from the results of formal customer satisfaction surveys or random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements
Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving critical infrastructure components the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.
5 QUALITY ASSURANCE DOCUMENTATION The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1, Performance Requirements Summary.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR/COTR, will be reported using the monitoring form in Attachment 2. The form, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required quality levels are being achieved.
5.2.1 The COR/COTR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
(Ver. May 2018) 4
6.1.1 The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment.
6.2 Reporting
6.2.1 At the end of each month, the COR will prepare a written report for the KO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes contractor’s submitted monthly report and the completed quality assurance monitoring form (Attachment 2), will become part of the QA documentation and COR/COTR file.
It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR/COTR may require the contractor’s project manager, or a designated alternate, to meet with the KO, COR/COTR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR/COTR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR/COTR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
Issues arising from the performance monitoring processes
6.3.2 The COR/COTR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR/COTR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.
Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the KO.
(Ver. May 2018) 5
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Performance
Objective
Performance Standard Performance
Standard
Acceptable
Quality
Levels (AQL)
Surveillance Method / By
Whom
Demolition of old sanitary and storm water lines, existing perimeter fence, and existing utilities in accordance with provided design
a. Provides demolition plan
b. Ensures water treatment service is not interrupted
Design Drawing Meets or exceeds the standards of quality stated in the plans and specifications.
Periodic inspections / COR
Construction of new
Perimeter Fence
a. Follows designs and specifications
b. Materials Submittals are provided with sufficient time for evaluation
c. Materials comply with
BAA/TAA
d. Gates and fencing has no defects and works as intended
e. Conducts testing of materials
(concrete)
QASP
Design Drawing
Meets or exceeds the standards of quality stated in the plans
Periodic inspections/ COR
Construction of New
Entrance Pit
Channel
a. Follows designs and specifications
b. Materials Submittals are provided with sufficient time for evaluation
c. Materials comply with
BAA/TAA
d. Conducts testing of materials
(concrete, aggregates, asphalt, fill material, soil compaction)
Design
Drawings
Lab Reports
Meets or exceeds the standards of quality stated in the plans
Periodic Inspections / COR
/ Certified Laboratory Tests
Reports
Installation of new
PVC Lines and
Construction of new
Concrete Culvert
a. Follows designs and specifications
b. Materials Submittals are provided with sufficient time for evaluation
c. Materials comply with
BAA/TAA
d. Conducts testing of materials
(concrete, aggregates, asphalt, fill material, soil compaction)
e. Sanitary and Storm Water Line
Connections are free of leakages or obstructions and in accordance with design
QASP
Design
Drawings
Lab Reports
Meets or exceeds the standards of quality stated in the plans
Reports
(Ver. May 2018) 6
Construction of
Garbage Station
a. Follows designs and specifications
b. Materials Submittals are provided with sufficient time for evaluation
c. Materials comply with
BAA/TAA
d. Conducts testing of materials
(concrete, aggregates, asphalt, fill material, soil compaction)
e. Sanitary and Storm Water Line
Connections are free of leakages or obstructions and in accordance with design
Design
Drawings
Lab Reports
Meets or exceeds the standards of quality stated in the plans
Reports
Supply and
Installation of
Pumps
a. Follows designs and specifications
b. Materials Submittals are provided with sufficient time for evaluation
c. Materials comply with
BAA/TAA
d. Provides warranty
e. Provides and operates temporary pumps for continuity of water treatment
QASP
Design
Drawings
Meets or exceeds the standards of quality stated in the plans
/ Site Plumber Inspection
Quality Control /
1.4.1, TE3
a. Quality of Workmanship
b. Adequacy of the QASP
c. Implementation of the QASP
d. Quality of QC Documentation
e. Storage of Materials
f. Adequacy of Materials
g. Adequacy of Submittals
h. Adequacy of Testing
i. Use of Specified Materials
j. Identification/Correction of deficiency works in a timely manner
QASP Meets or exceeds the standards of quality stated in the plans
Installation preconference.
Periodic Inspections
(Ver. May 2018) 7
Effectiveness of
Management
1.4.9, TE3
a. Cooperation and
b. Responsiveness
c. Management Resources &
d. Personnel
e. Coordination and Control of
Subcontractors
f. Adequacy of Site Clean-up
g. Effectiveness of Job Site
h. Supervision
i. Compliance with Laws and
j. Regulations
k. Professional Conduct
l. Review/Resolution of
m. Subcontractors Issues
Specification
01320
Coordinate progress meetings and inform weekly on project progress.
Periodic Inspection. COR will review monthly work order logs.
Timely Performance
/ TE3
a. Adequacy of Initial Progress
Schedule
b. Adherence of Approved
Schedule
c. Resolution of Delays
d. Submission of Required
Documentation
e. Completion of Punch List Items
f. Submission of Updated and
Revised Progress Schedules
g. Warranty Response
Specification
01320
CPM Schedule is on time.
Excess of 21 days delay shall present catch-up plan.
Bi-weekly submittal of progress schedules.
Periodic Inspection (35%, 65% and 100%)/ COR
Compliance with
Safety Standards
a. Adequacy of Safety Plan
b. Implementation of Safety Plan
c. Correction of Noted
Deficiencies
Specification
01351
OSHA
EM-385-1
Fill OSHA
Form 300
Provide evidence of
‘Toolbox Meetings’ and
Periodic Inspections of
Safety Officer. Inspections must be accompanied with
Safety Officer OSHA
Certifications/Credentials
(Ver. May 2018) 8
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
PERFORMANCE OBJECTIVE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________