TECHNICAL SPECIFICATIONS

DEMOLITION SECURITY TOWER #63

PROJECT NO. TUMR172116

FROM:

156th AW/MSG BASE CIVIL ENGINEER

PUERTO RICO AIR NATIONAL GUARD

CAROLINA, PUERTO RICO

FOR:

156th AW/MSG CONTRACTING OFFICER

PUERTO RICO AIR NATIONAL GUARD

CAROLINA, PUERTO RICO

TECHNICAL PROVISIONS

DEMOLITION SECURITY TOWER #63

PROJECT NO. TUMR172116

GENERAL INDEX

SECTION CONTENTS PAGE NO.

A

Work to be done

B

Scope of work

C

Location of the works

D

Special Instructions to Contractor

E

LBP Report

Annex 1

PART 1

DESCRIPTION OF WORK:

a. Work to be done:

· The work consists in demolition of TOWER #63 to include removal and disposition and/or recycling of all demolition debris and the furnishing of all labor, equipment, appliances, materials and performing all operations in strict accordance with the specifications and the applicable drawings, and subject to the terms and conditions of the contract. Demolition includes tower foundation.

· Contractor will conduct demolition operations assuming that no hazardous materials are present at tower other than lead based paint in the areas identified in annexed report.

· The following is a list of the principal features of the project as described in the specifications, shown, noted or implied upon in the accompanying drawings, showing the general characteristics and extent of the work.

· Parts not specifically detailed shall be constructed in a manner and spirit conforming to the class of work required for the whole project following the best engineering practices.

· Period of Performance for this project is 120 days. This period of performance considers a period up to the initial 30 calendar days for permits and coordination for environmental requirement.

b. Scope of work:

1. Permits and Testing

· Contractor will be responsible for requesting and obtaining all required permits as per Federal and State regulations.

· Contractor is responsible to perform all testing required by Federal and state regulations.

2. Ancillary Equipment

· Contractor will demolish, remove and properly dispose according with Federal and State regulations Tower #63 including all existing equipment. Demolish works will also include Tower #63 foundation and floor concrete slab.

· Contractor will be required to perform Lead Based Paint (LBP) Abatement actions in accordance with Puerto Rico Environmental Quality Board lead regulations prior to demolishing the structure. The contaminated surfaces or substrates will be removed. The waste generated has to be characterized to determine if the waste generated is hazardous or non hazardous waste.

· The firm providing the abatement services must be certified as an abatement firm by the EQB.

· Workers conducting abatement must be trained and certified as abatement workers by a training provider accredited by the EQB.

· Manifests of all waste containing LBP must be provided by contractor to the PRANG.

· Refer to LBP and asbestos Inspection Report, dated March 2010.

· Contractor shall present documented evidence of recycling from total volume of materials resulting from project execution as per specifications.

· Excavation will include pavement saw cut and trenching of approximately 20 ft. Compact excavation by layers according to compacting equipment. Asphalt pavement finishing must match existing conditions smoothly. Provide photos of open excavation with final installation of conduits.

· All existing electric, water, data and control conduits running from the Tower #63 to any adjacent building will be capped and abandoned in place and documented as per specifications.

3. Existing Concrete Slab

· Demolish, remove and properly dispose according with Federal and state regulations concrete floor slab and walls on Tower #63 and surrounding areas as per construction drawings and specifications.

· Provide and install 4 inches of top soil to cover all excavation and disturbed areas resulting from the project activities.

· Provide and apply seeding treatment to match existing surrounding grass.

· Clean all affected areas and properly dispose of debris.

4. Closeout Documentation

· Contractor will submit to Contracting Officer one binder as per project specifications.

5. Annex 1: LBP Abatement

· Refer to LBP Report and Drawings

c. Location: The Site of the work covered by these specifications is, PRANG MUÑIZ ANG BASE in Carolina, P.R.

d. Special Instructions to Contractor:

1. For additional contracting issues will be directed to the Base Contracting Officer at Building 11, Muñíz ANG Base telephone (787) 253-5238 or 7438.

2. For additional information on drawings and specifications, and for entering the Site premises contact the Base Civil Engineer (BCE) Office at Building 25, Muñíz ANG Base telephone (787) 253-5172, or fax (787) 253-5226 or 7415.

3. For additional Environmental information contact the Base Environmental Manager at Building 25, Muñíz ANG Base telephone (787) 253-5192, or fax (787) 253-5226 or 7415.

4. Contractors must be registered (current) in the System for Award Management (SAM) internet program at: http://www.sam.gov

5. All invoices must be submitted using Wide Area Workflow (WAWF) internet program at: https://wawf.eb.mil

· Contractor will verify status of all invoices My Invoice link at: https://wawf.eb.mil

6. Contractor Manpower Reporting Application (CMRA): The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30.

7. Every day all garbage and remaining materials related to the work will be taken to a garbage container provided by contractor.

8. Only company cars with distinctive logos posted at passenger and driver doors will be authorized inside BASE premises.

9. All personnel are required to show a valid not expired ID in the main entrance gate before entering the Base premises.

10. At the end of each working day all areas will be clear from equipment, tools and materials.

11. Special precautions will be taken at no cost to government to protect base property during the project execution.

12. The use of Personal Protective Equipment is mandatory at all time while working in the project.

f.

SUBMITTAL LIST

· Submit for approval the following construction materials to BCE office;

1) Disposal procedures and agreements including truck manifests

2) Safety plan to include Personal Protective Equipment monitoring system

3) Credentials for LBP abatement from certified contractor

4) LBP Abatement Plan

5) Landfill proof of disposition papers

6) Recycling manifest

7) Electrical conduits & wiring

8) Certificates of no debts to suppliers or vendors

9) Breakdown for Payment

10) Project Schedule of activities