TKWR182301_Pre-Bid_Questions_Responses.pdf
PDF 190 KB Posted
- Attached to
- TKWR182301 Punta Borinquen ANGB Repair Roofs Bldg 33 and 35 at Punta Borinquen, ANGB, Aguadilla, Puerto Rico
- Solicitation number
- W912LR-18-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4._QASP_TKWR182301.docx | DOCX document | |
| DOL_WD_PR180001_01052018.pdf | ||
| W912LR-18-R-0002.pdf | ||
| 2._PWS_TKWR182301.rtf | RTF text file | |
| 3._SOW_-_TKWR182301_-_Bound.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Especificaciones de los extractores,( Repair roof top exhaust fanto restore cover and make operational)
(Repair or replace?) **Replace. Submit information as the existing ones in roof.
2. Puedeutilizarse “self leveling” concrete, para minimizaremposamientos,?
**Self-leveling could be use. Materials, equipment and methods must be submitted.
3. Especificaciones de calentador solar, . (Repair solar hotwater heater system (Sunny Boy Model SB6000US) on that is mounted on the roofto restore it to full functionality.)
**Solar heater repair included in this project SOW. NOTE: Sunny Boy Model SB6000US refer to the electrical solar system AND NOT TO THE SOLAR HEATER. Electrical solar system is not included in this project.
4. Como se van a manejar los railingcorroídos? **Replace railings
5. Como se van a manejar las bases de antenas? **Please submit antenna base repairs.
6. Es responsabilidad del contratistaproteger el interior? El edificio continuará en uso oserá desalojado mientras se trabaja?
**Buildings are going to be functional during project execution. Contractor is responsible for protecting the interior of the building during the project execution.
7. Los días de atrasos por lluviacomo serán repuestos ?
**Contractor need to request the rain days. After the request, days could be given and only used if necessary.
8. Al hacer la demolición inicial yse encontrara el metal con mucha corrosión o en casos roto, cual será el " allowance" por pie cuadrado dereemplazar estos? O se preparará uncambio de orden al momento?
**Corroded metal sheets replacement are not contemplated in this contract.
9. Se requerirá trabajar en todas las áreas a la vez o sepodrá trabajar cada edificio de forma independiante?
**Project schedule required for both buildings. Both buildings are going to be impacted at the same time.
File details come from the government source that posted it.