This document provides questions and answers from a pre-bid site visit for a federal construction contract opportunity. The contract involves retrofitting one roof and replacing two roofs at buildings on Camp Pendleton State Military Reservation in Virginia Beach. Work includes removing and replacing a steep slope metal roof at Building 203, installing a new standing seam metal roof over an existing roof at Building 204, and removing and replacing low and steep slope roof sections at Building 205. The contract value is between $1 million and $5 million. The period of performance is anticipated to be 180 to 365 days from notice to proceed. The solicitation number is W912LQ19B5001 and will be issued on or about June 17, 2019 as a total small business set-aside for offerors with less than $15 million in annual revenue. The pre-bid conference is scheduled for June 30, 2019 and bids are due in August 2019. The work must be performed with at least 15% of the costs going to the prime contractor's own employees.
Revision 01 to the Pre-Bid Site Visit Questions & Answers
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS & ANSWERS, PRE-BID SITE VISIT 13 July 2019 (Revision 01)
W912LQ19B5001
RHS Roof Repairs
Question 01: Can FedEx be used to submit a bid?
Preliminary Verbal Response: Yes
Official Response: Bidders may use any commercial carrier to deliver bids. However, commercial carriers are required to have a bill of lading showing the location of delivery and process through the base vehicle control inspection. Both UPS and FedEx routinely deliver parcels to Langley AFB. If using a commercial carrier, it is recommended to obtain proof of date and time of delivery.
Question 02: Is a listing of Key Personnel required to be submitted with bids?
Preliminary Verbal Response: No
Official Response: A listing of Key Personnel is not required to be submitted with bids. However, the submittal registers require a Competent Person list as a preconstruction submittal. See specification section 02 83 13.00 20, paragraph 1.5.1.1.
Question 03: Is a Project Schedule required to be submitted with bids?
Preliminary Verbal Response: No
Official Response: A Project Schedule is not required to be submitted with bids. However, the submittal registers require a Preliminary Project Schedule and an Initial Project Schedule as preconstruction submittals. See Specification Section 01 32 01.00 10, Paragraphs 3.4.1 and 3.4.2.
Question 04: What is the due date for questions to be submitted?
Preliminary Verbal Response: 16 July 2019
Official Response: In accordance with Solicitation Section 00100, Instructions to Bidders, Paragraph 3.4, all questions and requests for information must be received NOT LATER THAN JULY 16, 2019.
Offerors are strongly encouraged to submit questions early.
Question 05: Will building 203’s internal gutters be retained or removed?
Preliminary Verbal Response: Will be answered in writing.
Initial Official Response: In accordance with Bldg 203 Specifications, Section 01 11 00, Paragraph 1.1.1, the existing internal gutters are to be abandoned and filled with wood blocking.
Revised Official Response: See drawing set of bldg 203. Internal gutters will be removed with demolition of existing roof. External gutters and downspouts will be installed with new roof. Additional requirements associated with the internal gutters are in Bldg 203 Specifications, Section 01 11 00, Paragraph 1.1.1.
Question 06: Will building 204’s skylights be retained or removed?
Initial Official Response: In accordance with Bldg 204 Specifications, Section 01 11 00, Paragraph 1.1.1, Sixteen existing curbed skylights are to be removed and disposed of. The resulting holes are to be infilled with new metal decking and polyisocyanurate insulation.
Revised Official Response: See Drawing set for bldg. 204, drawing A101. Additional requirements associated with the skylights is in Bldg 204 Specifications, Section 01 11 00, Paragraph 1.1.1.
Question 07: Has a spray over product been considered?
Official Response: A spray over product is not desired.
Question 08: Is building 205’s ethylene propylene diene terpolymer (EPDM) roof getting replaced?
Official Response: See drawing set for bldg. 205, drawings A301 and A302.
Question 09: Will as-built drawings be provided?
Preliminary Verbal Response: As-built drawings will be made available on the Federal Business Opportunities (FBO) website as an amendment to the associated FBO Notice. As with the design drawings and specifications, companies are required to a valid MPIN on file with FBO in order to download the as-built drawings.
Official Response: As-built drawings will be made available on the FBO website (fbo.gov) as an amendment to the associated FBO Notice. As with the design drawings and specifications, companies are required to a valid Marketing Partner Identification Number (MPIN) on file with FBO in order to download the as-built drawings.
Question 10: Has a moisture survey been performed?
Official Response: Yes. An assessment report will be made available on the FBO website (fbo.gov) as an amendment to the associated FBO Notice.
Question 11: Where can bids be hand carried?
Preliminary Verbal Response: The 192d Contracting Office on Langley AFB.
Official Response: Hand carried bids may be brought to the 192d Mission Support Group Commander’s Support Staff Office, 165 Sweeney Blvd, Bldg 768, Ste 214. An amendment to the solicitation is forthcoming to incorporate this information in Section 00100, Paragraph 4.2, of the solicitation.