This document outlines a federal contract opportunity for roof retrofit and replacement services. The 192nd Wing, Virginia Air National Guard is seeking a firm fixed-price construction contract to retrofit one roof and replace two roofs at Camp Pendleton State Military Reservation in Virginia Beach. The work includes removing and replacing metal roof panels on three buildings totaling approximately 44,750 square feet. The period of performance is estimated between 180 to 365 calendar days from notice to proceed. The solicitation is anticipated to be issued on or around June 17, 2019 with a pre-bid conference on June 30, 2019. The contract will be set aside for small businesses with a NAICS code of 238160 and size standard of $15 million. The contractor must perform at least 15% of the work cost with its own employees.

Questions & Answers, Pre-Bid Site Visit, dated 11 July 2019, 2 pages

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS, PRE-BID SITE VISIT 11 July 2019

W912LQ19B5001

RHS Roof Repairs

Question 01: Can FedEx be used to submit a bid?

Preliminary Verbal Response: Yes

Official Response: Bidders may use any commercial carrier to deliver bids. However, commercial carriers are required to have a bill of lading showing the location of delivery and process through the base vehicle control inspection. Both UPS and FedEx routinely deliver parcels to Langley AFB. If using a commercial carrier, it is recommended to obtain proof of date and time of delivery.

Question 02: Is a listing of Key Personnel required to be submitted with bids?

Preliminary Verbal Response: No

Official Response: A listing of Key Personnel is not required to be submitted with bids. However, the submittal registers require a Competent Person list as a preconstruction submittal. See specification section 02 83 13.00 20, paragraph 1.5.1.1

Question 03: Is a Project Schedule required to be submitted with bids?

Preliminary Verbal Response: No

Official Response: A Project Schedule is not required to be submitted with bids. However, the submittal registers require a Preliminary Project Schedule and an Initial Project Schedule as preconstruction submittals. See Specification Section 01 32 01.00 10, Paragraphs 3.4.1 and 3.4.2.

Question 04: What is the due date for questions to be submitted?

Preliminary Verbal Response: 16 July 2019

Official Response: In accordance with Solicitation Section 00100, Instructions to Bidders, Paragraph 3.4, all questions and requests for information must be received NOT LATER THAN JULY 16, 2019.

Offerors are strongly encouraged to submit questions early.

Question 05: Will building 203’s internal gutters be retained or removed?

Preliminary Verbal Response: Will be answered in writing.

Official Response: In accordance with Bldg 203 Specifications, Section 01 11 00, Paragraph 1.1.1, the existing internal gutters are to be abandoned and filled with wood blocking.

Question 06: Will building 204’s skylights be retained or removed?

Official Response: In accordance with Bldg 204 Specifications, Section 01 11 00, Paragraph 1.1.1, Sixteen existing curbed skylights are to be removed and disposed of. The resulting holes are to be infilled with new metal decking and polyisocyanurate insulation.

Question 07: Has a spray over product been considered?

Official Response: Answer pending

Question 08: Is building 205’s ethylene propylene diene terpolymer (EPDM) roof getting replaced?

Question 09: Will as-built drawings be provided?

Preliminary Verbal Response: As-built drawings will be made available on the Federal Business Opportunities (FBO) website as an amendment to the associated FBO Notice. As with the design drawings and specifications, companies are required to a valid MPIN on file with FBO in order to download the as-built drawings.

Official Response: As-built drawings will be made available on the FBO website (fbo.gov) as an amendment to the associated FBO Notice. As with the design drawings and specifications, companies are required to a valid Marketing Partner Identification Number (MPIN) on file with FBO in order to download the as-built drawings.

Question 10: Has a moisture survey been performed?

Question 11: Where can bids be hand carried?

Preliminary Verbal Response: The 192d Contracting Office on Langley AFB.

Official Response: Hand carried bids may be brought to the 192d Mission Support Group Commander’s Support Staff Office, 165 Sweeney Blvd, Bldg 768, Ste 214. An amendment to the solicitation is forthcoming to incorporate this information in Section 00100, Paragraph 4.2, of the solicitation.

R. FRANK HARTZELL

Contracting Officer