About this file
This document contains an abstract of offers and continuation sheet for an invitation for bid to provide roofing services at Camp Pendleton State Military Reservation in Virginia Beach, Virginia. The 192d Wing, Virginia Air National Guard is seeking a single firm fixed-price construction contract to retrofit one roof and replace two roofs at specified buildings. Work includes removing and replacing steep slope metal panels at Building 203, installing a new standing seam metal roof system over existing panels at Building 204, and replacing one slow slope and four steep slope roof sections at Building 205. The estimated value is between $1 million and $5 million and work must be completed within 180 to 365 calendar days of the notice to proceed. The solicitation number is W912LQ19B5001 and bids are due on September 3, 2019. The NAICS code is 238160 and this is a total small business set-aside with a size standard of $15 million. At least 15% of the work must be self-performed by the contractor per the limitations on subcontracting clause.
Abstract of Offers
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
192 MSG/MSC CONTRACTING OFFICE
165 SWEENEY BOULEVARD
BLDG 768, SUITE 214 (LANGLEY AFB)
HAMPTON VA 23665-2207
203d RHS Roof Repairs, Buildings 203 (Replace), 204 (Retrofit), and 205 (Replace)
PROJECT NUMBER: ERVD162001
Bldg 203; Steep Slope Roof Replacement
Bldg 204; Steep Slope Roof Retrofit
Bldg 205; Roof Replacement
Contractor Manpower Reporting
Job
Job
Job
Job
515,178.00
390,505.00
447,031.00
250.00
515,178.00
390,505.00
447,031.00
250.00
545,640.00
352,708.00
369,933.00
1,400.00
545,640.00
352,708.00
369,933.00
1,400.00
705,382.08
347,662.73
455,255.41
3,000.00
705,382.08
347,662.73
455,255.41
3,000.00
W912LQ19B5001 1 2
R. FRANK HARTZELL, SMSgt Contracting Officer
G.M. Hill Engineering, Inc. Cherico Construction Services, LLC
Bond - 20% of Bid Price Bond - 20% of Bid Price
Yes Yes
09/03/201906/18/2019
09/03/2019
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W912LQ19B5001
203d RHS Roof Repairs, Buildings 203 (Replace), 204 (Retrofit), and 205 (Replace)
PROJECT NUMBER:
ERVD162001 Bond - 20% of Bid Price Bond - 20% of Bid Price
Yes Yes
306,600.00306,600.006,500.006,500.00Job14
526,700.00526,700.00340,000.00340,000.00Job13
617,200.00617,200.00525,000.00525,000.00Job12
1 Job 500,000.00 500,000.00 855,400.00 855,400.00
2 2
3 4
Associates Roofing & Construction, Inc.
Succor, Inc.
| OF 1419 (complete) |
| OF 1419A (complete) |
| 2019-09-03T14:33:46-0400 | |
| HARTZELL.ROGER.F.1078815376 |
File details come from the government source that posted it. Updated .