Bid Abstract - Bids are Still Under Review

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Abstract

W912LQ-10-B-0002

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0001 1 JB -$ -$ 558,994.00$ 558,994.00$ 398,891.16$ 398,891.16$

0002 1 JB -$ -$ 154,311.00$ 154,311.00$ 201,853.81$ 201,853.81$

0003 1 JB -$ -$ 89,211.00$ 89,211.00$ 126,185.48$ 126,185.48$

0004 1 JB -$ -$ 139,851.00$ 139,851.00$ 314,983.74$ 314,983.74$

0005 1 JB -$ -$ 141,388.00$ 141,388.00$ 314,983.74$ 314,983.74$

0006 1 JB -$ -$ 163,671.00$ 163,671.00$ 171,104.61$ 171,104.61$

0007 1 JB -$ -$ 355,081.00$ 355,081.00$ 846,998.08$ 846,998.08$

0008 1 JB -$ -$ 17,416.00$ 17,416.00$ 35,201.40$ 35,201.40$

0009 1 JB -$ -$ 73,446.00$ 73,446.00$ 85,127.27$ 85,127.27$

0010 1 JB -$ -$ 287,394.00$ 287,394.00$ 721,028.28$ 721,028.28$

0011 1 JB -$ -$ 329,000.00$ 329,000.00$ 737,316.36$ 737,316.36$

0012 100 BF -$ -$ 7.50$ 750.00$ 11.54$ 1,154.00$

0012 450 BF -$ -$ 7.50$ 3,375.00$ 11.54$ 5,193.00$

0012 50 BF -$ -$ 7.50$ 375.00$ 11.54$ 577.00$

0013 -$ 2,314,263.00$ 3,960,597.93$

0014 1 JB 750.00$ 750.00$ 235.32$ 235.32$ 208.26$ 208.26$

0015 1 JB 5,500.00$ 5,500.00$ 3,463.20$ 3,463.20$ 208.26$ 208.26$

0016 1 JB 750.00$ 750.00$ 235.32$ 235.32$ 2,704.48$ 2,704.48$

0017 1 JB 5,500.00$ 5,500.00$ 3,463.20$ 3,463.20$ 2,704.78$ 2,704.78$

0018 1 JB 2,500.00$ 2,500.00$ 3,856.88$ 3,856.88$ 5,059.02$ 5,059.02$

0019 1 JB 3,900.00$ 3,900.00$ 4,648.68$ 4,648.68$ 4,616.65$ 4,616.65$

0020 1 JB 17,700.00$ 17,700.00$ 18,659.84$ 18,659.84$ 12,908.63$ 12,908.63$

0021 1 JB 18,900.00$ 18,900.00$ 20,646.00$ 20,646.00$ 20,030.13$ 20,030.13$

0022 1 JB 24,800.00$ 24,800.00$ 20,848.76$ 20,848.76$ 20,109.90$ 20,109.90$

0023 1 JB 50,600.00$ 50,600.00$ 19,467.92$ 19,467.92$ 44,221.48$ 44,221.48$

0024 1 JB 9,500.00$ 9,500.00$ 18,985.44$ 18,985.44$ 19,816.92$ 19,816.92$

0025 1 JB 17,700.00$ 17,700.00$ 20,073.24$ 20,073.24$ 20,537.77$ 20,537.77$

0026 1 JB 14,000.00$ 14,000.00$ 7,515.44$ 7,515.44$ 8,590.77$ 8,590.77$

Lighting Facility T0218

Lighting Facility T0212

HVAC Bldg 218

Description of Item

HVAC Bldg 134

HVAC Bldg 147

HVAC Bldg 311

Lighting Facility 00001

Lighting Facility 00002

HVAC Bldg 1613

HVAC Bldg 2601

Lighting Facility T0229

Lighting Facility 00005

Lighting Facility DGIF1

Lighting Facility T0049

HVAC Bldg 1485

HVAC Bldg T0049

Lighting Facility T0222

Lighting Facility T0224

Lighting Facility T0216

BIDS

# _1__

Lighting Facility T0215

Lighting Facility 00003

HVAC Bldg 234

HVAC Bldg 472

HVAC Bldg 471

I certify that I have opened, read and recorded on this abstract all bids received in response to this solicitation.

Signature & Date:

Name & Title of Certifying Official:

Total 0001-0012

Bid Security: Y

Amendments Acknowledged: N

Bidder: Boykin, West Columbia, SC

Deteriorated Wood

Deteriorated Wood

Deteriorated Wood

Bidder: Iron Cross, Chester, VA

Bid Security: Y

Amendments Acknowledged: Y

# _2__ # _3__

Bidder: Trifecta, Annapolis Junction, MD

Bid Security: Y

Amendments Acknowledged: Y

Page ___ of ___

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0001 1 JB 484,497.00$ 484,497.00$ 68,046.00$ 68,046.00$ 593,230.00$ 593,230.00$

0002 1 JB 88,063.00$ 88,063.00$ 92,716.00$ 92,716.00$ 178,618.00$ 178,618.00$

0003 1 JB 172,359.00$ 172,359.00$ 51,636.00$ 51,636.00$ 133,808.00$ 133,808.00$

0004 1 JB 132,869.00$ 132,869.00$ 90,046.00$ 90,046.00$ 243,530.00$ 243,530.00$

0005 1 JB 142,895.00$ 142,895.00$ 105,078.00$ 105,078.00$ 250,280.00$ 250,280.00$

0006 1 JB 205,348.00$ 205,348.00$ 60,605.00$ 60,605.00$ 180,952.00$ 180,952.00$

0007 1 JB 271,963.00$ 271,963.00$ 326,804.00$ 326,804.00$ 253,630.00$ 253,630.00$

0008 1 JB 53,530.00$ 53,530.00$ 15,846.00$ 15,846.00$ 38,316.00$ 38,316.00$

0009 1 JB 52,352.00$ 52,352.00$ 38,643.00$ 38,643.00$ 173,770.00$ 173,770.00$

0010 1 JB 154,857.00$ 154,857.00$ 211,198.00$ 211,198.00$ 221,572.00$ 221,572.00$

0011 1 JB 197,487.00$ 197,487.00$ 148,924.00$ 148,924.00$ 164,317.00$ 164,317.00$

0012 100 BF 12.00$ 1,200.00$ 25.00$ 2,500.00$

0012 450 BF 10.00$ 4,500.00$ 25.00$ 11,250.00$

0012 50 BF 12.00$ 600.00$ 25.00$ 1,250.00$

0013 1,962,520.00$ 1,212,870.00$ 2,447,023.00$

0014 1 JB 2,410.00$ 2,410.00$ -$ -$ 332.00$ 332.00$

0015 1 JB 2,434.00$ 2,434.00$ -$ -$ 332.00$ 332.00$

0016 1 JB 4,084.00$ 4,084.00$ -$ -$ 2,828.00$ 2,828.00$

0017 1 JB 4,084.00$ 4,084.00$ -$ -$ 2,828.00$ 2,828.00$

0018 1 JB 5,109.00$ 5,109.00$ -$ -$ 3,677.00$ 3,677.00$

0019 1 JB 3,298.00$ 3,298.00$ -$ -$ 6,548.00$ 6,548.00$

0020 1 JB 18,797.00$ 18,797.00$ -$ -$ 12,807.00$ 12,807.00$

0021 1 JB 26,062.00$ 26,062.00$ -$ -$ 17,618.00$ 17,618.00$

0022 1 JB 29,106.00$ 29,106.00$ -$ -$ 17,500.00$ 17,500.00$

0023 1 JB 84,710.00$ 84,710.00$ -$ -$ 34,585.00$ 34,585.00$

0024 1 JB 20,706.00$ 20,706.00$ -$ -$ 57,011.00$ 57,011.00$

0025 1 JB 26,135.00$ 26,135.00$ -$ -$ 21,336.00$ 21,336.00$

0026 1 JB 27,643.00$ 27,643.00$ -$ -$ 6,754.00$ 6,754.00$

3,328.00$

Lighting Facility T0224

Lighting Facility T0049

Lighting Facility T0229

Lighting Facility T0222

Lighting Facility T0215

Lighting Facility 00005

Lighting Facility T0218

Lighting Facility T0212

Lighting Facility T0216

Lighting Facility DGIF1

Lighting Facility 00001

Deteriorated Wood

Lighting Facility 00003

Total 0001-0012

Lighting Facility 00002

Deteriorated Wood

HVAC Bldg T0049

Deteriorated Wood

HVAC Bldg 218

HVAC Bldg 311

HVAC Bldg 2601

HVAC Bldg 1485

HVAC Bldg 471

HVAC Bldg 234

HVAC Bldg 472

HVAC Bldg 1613

HVAC Bldg 147

Bidder: Lanier Contracting, Suwanee, GA

BIDS

# _4__ # _5__ # _6__

Bidder: Ameriphysics Energy, Knoxville, TN

Bidder: SDV East, Sarasota, FL

Description of Item

Bid Security: Y Bid Security: Y Bid Security: Y

HVAC Bldg 134

Amendments Acknowledged: Y Amendments Acknowledged: Y Amendments Acknowledged: Y

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0001 1 JB 414,781.00$ 414,781.00$ 490,418.00$ 490,418.00$ 723,741.00$ 723,741.00$

0002 1 JB 107,587.00$ 107,587.00$ 102,082.00$ 102,082.00$ 209,374.00$ 209,374.00$

0003 1 JB 97,145.00$ 97,145.00$ 82,084.00$ 82,084.00$ 163,245.00$ 163,245.00$

0004 1 JB 150,324.00$ 150,324.00$ 155,162.00$ 155,162.00$ 267,217.00$ 267,217.00$

0005 1 JB 164,865.00$ 164,865.00$ 165,310.00$ 165,310.00$ 273,317.00$ 273,317.00$

0006 1 JB 143,268.00$ 143,268.00$ 159,828.00$ 159,828.00$ 220,762.00$ 220,762.00$

0007 1 JB 297,981.00$ 297,981.00$ 208,625.00$ 208,625.00$ 277,404.00$ 277,404.00$

0008 1 JB 38,759.00$ 38,759.00$ 33,985.00$ 33,985.00$ 46,745.00$ 46,745.00$

0009 1 JB 40,334.00$ 40,334.00$ 39,200.00$ 39,200.00$ 165,029.00$ 165,029.00$

0010 1 JB 260,499.00$ 260,499.00$ 182,077.00$ 182,077.00$ 227,618.00$ 227,618.00$

0011 1 JB 257,147.00$ 257,147.00$ 178,500.00$ 178,500.00$ 179,116.00$ 179,116.00$

0012 100 BF 11.06$ 1,106.00$ 1.60$ 160.00$ 25.00$ 2,500.00$

0012 450 BF 11.06$ 4,977.00$ 1.60$ 720.00$ 25.00$ 11,250.00$

0012 50 BF 11.06$ 553.00$ 1.60$ 80.00$ 25.00$ 1,250.00$

0013 1,979,326.00$ 1,798,231.00$ 2,768,568.00$

0014 1 JB 3,069.00$ 3,069.00$ 351.00$ 351.00$ 405.00$ 405.00$

0015 1 JB 3,443.00$ 3,443.00$ 351.00$ 351.00$ 405.00$ 405.00$

0016 1 JB 7,164.00$ 7,164.00$ 1,813.00$ 1,813.00$ 3,450.00$ 3,450.00$

0017 1 JB 7,164.00$ 7,164.00$ 1,813.00$ 1,813.00$ 3,450.00$ 3,450.00$

0018 1 JB 4,818.00$ 4,818.00$ 3,151.00$ 3,151.00$ 4,486.00$ 4,486.00$

0019 1 JB 8,413.00$ 8,413.00$ 2,203.00$ 2,203.00$ 7,989.00$ 7,989.00$

0020 1 JB 17,479.00$ 17,479.00$ 11,163.00$ 11,163.00$ 15,625.00$ 15,625.00$

0021 1 JB 20,225.00$ 20,225.00$ 13,094.00$ 13,094.00$ 21,494.00$ 21,494.00$

0022 1 JB 20,225.00$ 20,225.00$ 13,284.00$ 13,284.00$ 21,350.00$ 21,350.00$

0023 1 JB 35,579.00$ 35,579.00$ 15,259.00$ 15,259.00$ 42,194.00$ 42,194.00$

0024 1 JB 22,407.00$ 22,407.00$ 26,682.00$ 26,682.00$ 69,553.00$ 69,553.00$

0025 1 JB 34,567.00$ 34,567.00$ 18,922.00$ 18,922.00$ 26,030.00$ 26,030.00$

0026 1 JB 15,522.00$ 15,522.00$ 6,491.00$ 6,491.00$ 8,240.00$ 8,240.00$ Lighting Facility T0229

Lighting Facility T0218

Lighting Facility T0222

Lighting Facility T0224

Lighting Facility T0215

Lighting Facility T0216

Lighting Facility DGIF1

Lighting Facility T0049

Lighting Facility T0212

Lighting Facility 00002

Lighting Facility 00003

Lighting Facility 00005

Deteriorated Wood

Total 0001-0012

Lighting Facility 00001

HVAC Bldg 311

HVAC Bldg 218

Deteriorated Wood

Deteriorated Wood

HVAC Bldg 1485

HVAC Bldg T0049

HVAC Bldg 1613

HVAC Bldg 2601

HVAC Bldg 472

HVAC Bldg 471

HVAC Bldg 147

HVAC Bldg 234

Description of Item

HVAC Bldg 134

Amendments Acknowledged: 3 Amendments Acknowledged: Y Amendments Acknowledged: Y

Bid Security: Y Bid Security: Y Bid Security: Y

Bidder: American Veteran, Chester, VA Bidder: Eagle Crossing, VA Beach, VA

Bidder: MNM Corporation, Burstonville, MD

# _7__ # _8__ # _9__

BIDS

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0027 1 JB 21,500.00$ 21,500.00$ 23,632.64$ 23,632.64$ 24,113.03$ 24,113.03$

0028 1 JB 32,000.00$ 32,000.00$ 29,401.68$ 29,401.68$ 29,041.52$ 29,041.52$

0029 1 JB 18,000.00$ 18,000.00$ 18,878.88$ 18,878.88$ 16,174.95$ 16,174.95$

0030 1 JB 5,800.00$ 5,800.00$ 3,960.48$ 3,960.48$ 6,439.81$ 6,439.81$

0031 1 JB 10,900.00$ 10,900.00$ 9,427.60$ 9,427.60$ 9,178.18$ 9,178.18$

0032 1 JB 29,000.00$ 29,000.00$ 23,423.96$ 23,423.96$ 19,579.06$ 19,579.06$

0033 1 JB 21,000.00$ 21,000.00$ 21,551.76$ 21,551.76$ 20,487.01$ 20,487.01$

0034 1 JB 6,000.00$ 6,000.00$ 7,039.64$ 7,039.64$ 6,310.72$ 6,310.72$

0035 1 JB 9,000.00$ 9,000.00$ 8,621.00$ 8,621.00$ 9,292.76$ 9,292.76$

0036 1 JB 3,500.00$ 3,500.00$ 2,317.68$ 2,317.68$ 2,329.35$ 2,329.35$

0037 1 JB 6,000.00$ 6,000.00$ 5,239.20$ 5,239.20$ 6,763.25$ 6,763.25$

0038 1 JB 24,000.00$ 24,000.00$ 21,963.20$ 21,963.20$ 19,406.46$ 19,406.46$

0039 1 JB 21,000.00$ 21,000.00$ 17,385.56$ 17,385.56$ 19,525.39$ 19,525.39$

0040 1 JB 3,000.00$ 3,000.00$ 24,829.96$ 24,829.96$ 2,529.51$ 2,529.51$

0041 1 JB 8,000.00$ 8,000.00$ 6,214.52$ 6,214.52$ 7,326.01$ 7,326.01$

0042 1 JB 91,000.00$ 91,000.00$ 110,761.72$ 110,761.72$ 99,189.04$ 99,189.04$

0043 1 JB 54,200.00$ 54,200.00$ 28,778.60$ 28,778.60$ 36,236.99$ 36,236.99$

0044 1 JB 2,500.00$ 2,500.00$ 4,583.56$ 4,583.56$ 3,884.19$ 3,884.19$

0045 1 JB 5,000.00$ 5,000.00$ 2,023.16$ 2,023.16$ 1,924.69$ 1,924.69$

0046 1 JB 5,400.00$ 5,400.00$ 54,270.12$ 54,270.12$ 4,718.18$ 4,718.18$

0047 1 JB 9,700.00$ 9,700.00$ 5,943.68$ 5,943.68$ 7,362.27$ 7,362.27$

0048 1 JB 46,300.00$ 46,300.00$ 32,947.76$ 32,947.76$ 32,570.36$ 32,570.36$

0049 1 JB 11,800.00$ 11,800.00$ 8,193.28$ 8,193.28$ 8,830.08$ 8,830.08$

0050 1 JB 7,200.00$ 7,200.00$ 6,843.52$ 6,843.52$ 7,017.07$ 7,017.07$

0051 1 JB 7,200.00$ 7,200.00$ 7,512.48$ 7,512.48$ 7,613.19$ 7,613.19$

0052 1 JB 6,500.00$ 6,500.00$ 1,394.16$ 1,394.16$ 9,724.98$ 9,724.98$

0053 1 JB 2,500.00$ 2,500.00$ 2,202.24$ 2,202.24$ 1,785.45$ 1,785.45$

0054 1 JB 8,100.00$ 8,100.00$ 6,051.72$ 6,051.72$ 6,429.66$ 6,429.66$

0055 1 JB $20,100.00 20,100.00$ 19,423.52$ 19,423.52$ 18,177.96$ 18,177.96$

Lighting Facility T0764

Bidder: Bidder: Bidder:

Amendments Acknowledged: Amendments Acknowledged: Amendments Acknowledged:

# _1__ # _2__

Bid Security: Bid Security:

# _3__

Bid Security:

Lighting Facility T0230

Description of Item

Lighting Facility T0234

Lighting Facility T0303

Lighting Facility T0309

Lighting Facility T0311

Lighting Facility T0312

Lighting Facility T0232

Lighting Facility T0763

Lighting Facility AT495

Lighting Facility T0495

Lighting Facility 503

Lighting Facility 561

Lighting Facility AT562

Lighting Facility T0562

Lighting Facility T0563

Lighting Facility AT564

Lighting Facility T0564

Lighting Facility T0761

Lighting Facility T0762

Lighting Facility T0320

Lighting Facility T0321

Lighting Facility T0468

Lighting Facility T0469

Lighting Facility T0471

Lighting Facility T0472

Lighting Facility T0765

Lighting Facility T0767

Lighting Facility T1307

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0027 1 JB 29,296.00$ 29,296.00$ -$ -$ 22,289.00$ 22,289.00$

0028 1 JB 60,774.00$ 60,774.00$ -$ -$ 25,191.00$ 25,191.00$

0029 1 JB 20,443.00$ 20,443.00$ -$ -$ 13,522.00$ 13,522.00$

0030 1 JB 9,056.00$ 9,056.00$ -$ -$ 5,501.00$ 5,501.00$

0031 1 JB 12,642.00$ 12,642.00$ -$ -$ 13,083.00$ 13,083.00$

0032 1 JB 32,564.00$ 32,564.00$ -$ -$ 21,477.00$ 21,477.00$

0033 1 JB 30,552.00$ 30,552.00$ -$ -$ 24,065.00$ 24,065.00$

0034 1 JB 8,798.00$ 8,798.00$ -$ -$ 6,303.00$ 6,303.00$

0035 1 JB 11,406.00$ 11,406.00$ -$ -$ 8,494.00$ 8,494.00$

0036 1 JB 4,457.00$ 4,457.00$ -$ -$ 3,645.00$ 3,645.00$

0037 1 JB 9,347.00$ 9,347.00$ -$ -$ 8,402.00$ 8,402.00$

0038 1 JB 26,784.00$ 26,784.00$ -$ -$ 14,959.00$ 14,959.00$

0039 1 JB 26,510.00$ 26,510.00$ -$ -$ 14,048.00$ 14,048.00$

0040 1 JB 3,859.00$ 3,859.00$ -$ -$ 3,933.00$ 3,933.00$

0041 1 JB 9,580.00$ 9,580.00$ -$ -$ 7,915.00$ 7,915.00$

0042 1 JB 140,801.00$ 140,801.00$ -$ -$ 85,456.00$ 85,456.00$

0043 1 JB 33,677.00$ 33,677.00$ -$ -$ 33,909.00$ 33,909.00$

0044 1 JB 3,003.00$ 3,003.00$ -$ -$ 2,755.00$ 2,755.00$

0045 1 JB 6,202.00$ 6,202.00$ -$ -$ 5,607.00$ 5,607.00$

0046 1 JB 7,444.00$ 7,444.00$ -$ -$ 3,753.00$ 3,753.00$

0047 1 JB 28,672.00$ 28,672.00$ -$ -$ 6,551.00$ 6,551.00$

0048 1 JB 43,026.00$ 43,026.00$ -$ -$ 35,235.00$ 35,235.00$

0049 1 JB 9,780.00$ 9,780.00$ -$ -$ 8,822.00$ 8,822.00$

0050 1 JB 9,609.00$ 9,609.00$ -$ -$ 8,541.00$ 8,541.00$

0051 1 JB 8,431.00$ 8,431.00$ -$ -$ 9,201.00$ 9,201.00$

0052 1 JB 9,465.00$ 9,465.00$ -$ -$ 6,782.00$ 6,782.00$

0053 1 JB 2,734.00$ 2,734.00$ -$ -$ 2,530.00$ 2,530.00$

0054 1 JB 8,410.00$ 8,410.00$ -$ -$ 8,540.00$ 8,540.00$

0055 1 JB $30,024.00 30,024.00$ -$ -$ 23,452.00$ 23,452.00$

Lighting Facility T0761

Lighting Facility T0767

Lighting Facility T0762

Lighting Facility T0763

Lighting Facility T0765

Lighting Facility AT564

Lighting Facility T1307

Lighting Facility T0764

Lighting Facility T0564

Lighting Facility AT562

Lighting Facility T0495

Lighting Facility T0563

Lighting Facility 561

Lighting Facility T0562

Lighting Facility AT495

Lighting Facility T0469

Lighting Facility 503

Lighting Facility T0472

Lighting Facility T0471

Lighting Facility T0321

Lighting Facility T0468

Lighting Facility T0312

Lighting Facility T0320

Lighting Facility T0309

Lighting Facility T0311

Lighting Facility T0234

Lighting Facility T0303

# _4__ # _5__ # _6__

Bidder: Bidder: Bidder:

Bid Security: Bid Security: Bid Security:

Lighting Facility T0230

Amendments Acknowledged: Amendments Acknowledged: Amendments Acknowledged:

Lighting Facility T0232

Description of Item

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0027 1 JB 40,300.00$ 40,300.00$ 18,986.00$ 18,986.00$ 27,193.00$ 27,193.00$

0028 1 JB 45,422.00$ 45,422.00$ 19,010.00$ 19,010.00$ 30,733.00$ 30,733.00$

0029 1 JB 17,493.00$ 17,493.00$ 9,686.00$ 9,686.00$ 16,497.00$ 16,497.00$

0030 1 JB 7,219.00$ 7,219.00$ 5,924.00$ 5,924.00$ 6,711.00$ 6,711.00$

0031 1 JB 13,883.00$ 13,883.00$ 5,689.00$ 5,689.00$ 15,961.00$ 15,961.00$

0032 1 JB 20,117.00$ 20,117.00$ 13,130.00$ 13,130.00$ 26,202.00$ 26,202.00$

0033 1 JB 23,727.00$ 23,727.00$ 18,783.00$ 18,783.00$ 29,359.00$ 29,359.00$

0034 1 JB 14,105.00$ 14,105.00$ 5,772.00$ 5,772.00$ 7,690.00$ 7,690.00$

0035 1 JB 14,980.00$ 14,980.00$ 7,672.00$ 7,672.00$ 10,363.00$ 10,363.00$

0036 1 JB 5,525.00$ 5,525.00$ 1,959.00$ 1,959.00$ 4,447.00$ 4,447.00$

0037 1 JB 10,495.00$ 10,495.00$ 4,389.00$ 4,389.00$ 10,250.00$ 10,250.00$

0038 1 JB 19,783.00$ 19,783.00$ 9,956.00$ 9,956.00$ 18,250.00$ 18,250.00$

0039 1 JB 23,074.00$ 23,074.00$ 12,194.00$ 12,194.00$ 17,139.00$ 17,139.00$

0040 1 JB 7,538.00$ 7,538.00$ 2,765.00$ 2,765.00$ 4,798.00$ 4,798.00$

0041 1 JB 5,025.00$ 5,025.00$ 6,009.00$ 6,009.00$ 9,656.00$ 9,656.00$

0042 1 JB 85,345.00$ 85,345.00$ 69,734.00$ 69,734.00$ 104,256.00$ 104,256.00$

0043 1 JB 52,634.00$ 52,634.00$ 19,146.00$ 19,146.00$ 41,369.00$ 41,369.00$

0044 1 JB 5,025.00$ 5,025.00$ 1,541.00$ 1,541.00$ 3,361.00$ 3,361.00$

0045 1 JB 6,663.00$ 6,663.00$ 2,619.00$ 2,619.00$ 6,841.00$ 6,841.00$

0046 1 JB 5,025.00$ 5,025.00$ 2,706.00$ 2,706.00$ 4,579.00$ 4,579.00$

0047 1 JB 36,290.00$ 36,290.00$ 3,979.00$ 3,979.00$ 7,992.00$ 7,992.00$

0048 1 JB 31,265.00$ 31,265.00$ 18,502.00$ 18,502.00$ 42,987.00$ 42,987.00$

0049 1 JB 9,620.00$ 9,620.00$ 5,360.00$ 5,360.00$ 10,763.00$ 10,763.00$

0050 1 JB 6,885.00$ 6,885.00$ 5,705.00$ 5,705.00$ 10,420.00$ 10,420.00$

0051 1 JB 7,538.00$ 7,538.00$ 6,175.00$ 6,175.00$ 11,225.00$ 11,225.00$

0052 1 JB 6,334.00$ 6,334.00$ 7,160.00$ 7,160.00$ 8,274.00$ 8,274.00$

0053 1 JB 2,513.00$ 2,513.00$ 1,643.00$ 1,643.00$ 3,087.00$ 3,087.00$

0054 1 JB 6,234.00$ 6,234.00$ 4,099.00$ 4,099.00$ 10,419.00$ 10,419.00$

0055 1 JB $22,518.00 22,518.00$ 10,506.00$ 10,506.00$ 28,611.00$ 28,611.00$ Lighting Facility T1307

Lighting Facility T0764

Lighting Facility T0765

Lighting Facility T0767

Lighting Facility T0762

Lighting Facility T0763

Lighting Facility AT564

Lighting Facility T0564

Lighting Facility T0761

Lighting Facility AT562

Lighting Facility T0562

Lighting Facility T0563

Lighting Facility AT495

Lighting Facility T0495

Lighting Facility 503

Lighting Facility 561

Lighting Facility T0469

Lighting Facility T0471

Lighting Facility T0472

Lighting Facility T0321

Lighting Facility T0468

Lighting Facility T0312

Lighting Facility T0320

Lighting Facility T0309

Lighting Facility T0311

Lighting Facility T0234

Lighting Facility T0303

Lighting Facility T0230

Lighting Facility T0232

Description of Item

Amendments Acknowledged: Amendments Acknowledged: Amendments Acknowledged:

Bid Security: Bid Security: Bid Security:

Bidder: Bidder: Bidder:

# _7__ # _8__ # _9__

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0056 1 JB 12,400.00$ 12,400.00$ 13,912.00$ 13,912.00$ 11,722.20$ 11,722.20$

0057 1 JB 17,300.00$ 17,300.00$ 14,292.36$ 14,292.36$ 14,672.33$ 14,672.33$

0058 1 JB 40,200.00$ 40,200.00$ 31,109.60$ 31,109.60$ 33,337.62$ 33,337.62$

0059 1 JB 17,500.00$ 17,500.00$ 18,625.80$ 18,625.80$ 16,682.59$ 16,682.59$

0060 1 JB 3,400.00$ 3,400.00$ 4,052.24$ 4,052.24$ 3,668.08$ 3,668.08$

0061 1 JB 3,000.00$ 3,000.00$ 2,477.52$ 2,477.52$ 2,735.47$ 2,735.47$

0062 1 JB 7,900.00$ 7,900.00$ 5,894.84$ 5,894.84$ 6,866.23$ 6,866.23$

0063 1 JB 6,900.00$ 6,900.00$ 6,338.84$ 6,338.84$ 7,278.15$ 7,278.15$

0064 1 JB 11,200.00$ 11,200.00$ 11,415.24$ 11,415.24$ 12,525.72$ 12,525.72$

0065 788,100.00$ 765,034.96$ 715,166.56$

0066 788,100.00$ 3,079,297.96$ 4,675,764.49$

Bid Security: Bid Security:

Lighting Facility 1485

# _1__ # _2__ # _3__

Bidder:

Bid Security:

Amendments Acknowledged:

Description of Item

Lighting Facility T1309

Amendments Acknowledged: Amendments Acknowledged:

Bidder: Bidder:

Lighting Facility T2856

Lighting Facility T1613

Lighting Facility T2204

Lighting Facility T2360

Lighting Facility T2361

Lighting Facility T2372

Lighting Facility T2373

TOTAL 0014-0064

TOTAL 0013 & 0065

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0056 1 JB 14,264.00$ 14,264.00$ -$ -$ 9,772.00$ 9,772.00$

0057 1 JB 19,720.00$ 19,720.00$ -$ -$ 12,996.00$ 12,996.00$

0058 1 JB 15,382.00$ 15,382.00$ -$ -$ 29,632.00$ 29,632.00$

0059 1 JB 22,241.00$ 22,241.00$ -$ -$ 13,537.00$ 13,537.00$

0060 1 JB 5,076.00$ 5,076.00$ -$ -$ 3,573.00$ 3,573.00$

0061 1 JB 3,662.00$ 3,662.00$ -$ -$ 3,549.00$ 3,549.00$

0062 1 JB 8,769.00$ 8,769.00$ -$ -$ 7,967.00$ 7,967.00$

0063 1 JB 9,274.00$ 9,274.00$ -$ -$ 6,313.00$ 6,313.00$

0064 1 JB 14,815.00$ 14,815.00$ -$ -$ 13,731.00$ 13,731.00$

0065 1,005,127.00$ -$ 719,187.00$

0066 2,967,647.00$ 1,212,870.00$ 3,166,210.00$

Alternative bid for HVAC

TOTAL 0014-0064

TOTAL 0013 & 0065

Lighting Facility T2373

Lighting Facility T2856

Lighting Facility T2361

Lighting Facility T2372

Lighting Facility T2204

Lighting Facility T2360

Lighting Facility 1485

Amendments Acknowledged:

Lighting Facility T1309

Lighting Facility T1613

Bidder: Bidder:

Amendments Acknowledged: Amendments Acknowledged:

Bid Security: Bid Security: Bid Security:

# _4__ # _5__ # _6__

Bidder:

Description of Item

Issued: 6 July 10

Opened: 12 August 10

Issuing Office: VaARNG USPFO-AQS W912LQ

Project Title: Energy Upgrades

Number of Amendments Issued: 3

CLIN # Est Qty Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0056 1 JB 9,402.00$ 9,402.00$ 6,307.00$ 6,307.00$ 11,922.00$ 11,922.00$

0057 1 JB 16,937.00$ 16,937.00$ 11,367.00$ 11,367.00$ 15,855.00$ 15,855.00$

0058 1 JB 28,752.00$ 28,752.00$ 22,197.00$ 22,197.00$ 36,151.00$ 36,151.00$

0059 1 JB 17,493.00$ 17,493.00$ 10,613.00$ 10,613.00$ 16,515.00$ 16,515.00$

0060 1 JB 5,025.00$ 5,025.00$ 1,921.00$ 1,921.00$ 4,359.00$ 4,359.00$

0061 1 JB 4,372.00$ 4,372.00$ 1,711.00$ 1,711.00$ 4,330.00$ 4,330.00$

0062 1 JB 7,538.00$ 7,538.00$ 5,891.00$ 5,891.00$ 9,720.00$ 9,720.00$

0063 1 JB 7,538.00$ 7,538.00$ 5,660.00$ 5,660.00$ 7,702.00$ 7,702.00$

0064 1 JB 14,980.00$ 14,980.00$ 6,975.00$ 6,975.00$ 16,752.00$ 16,752.00$

0065 864,687.00$ 488,018.00$ 877,410.00$

0066 2,844,013.00$ 2,286,249.00$ 3,645,978.00$ TOTAL 0013 & 0065

Lighting Facility T2856

TOTAL 0014-0064

Lighting Facility T2372

Lighting Facility T2373

Lighting Facility T2360

Lighting Facility T2361

Lighting Facility T1613

Lighting Facility T2204

Lighting Facility T1309

Lighting Facility 1485

Amendments Acknowledged: Amendments Acknowledged:

Description of Item

Bid Security: Bid Security:

Amendments Acknowledged:

Bidder: Bidder:

Bid Security:

# _7__ # _8__ # _9__

Bidder:

File details come from the government source that posted it. Updated .