This document is a Performance Work Statement (PWS) for the repair of a Rotary Lift, vehicle maintenance lift system, model MCHW618U100, serial no. HBJ15F0013, located at Field Maintenance Shop #3 in Sioux City, Iowa. The contractor shall inspect, repair, service, and refurbish the lift to meet original manufacturer standards and industry safety requirements. Known repair items include replacing a control board, UI board, and service chip. The contractor must have Automotive Lift Institute (ALI) certified employees perform the work. The work must be completed within 120 days after contract award.

The related federal contract opportunity is a solicitation from the Iowa Army National Guard to purchase these repair services. Proposals are due by 11:00 a.m. central time on July 18, 2024. The contractor's proposal must include an itemized breakdown of all costs. The Iowa National Guard is exempt from state and federal taxes. The North American Industry Classification System (NAICS) code is 811310 with a small business size standard of $12.5 million.

View the file

Other files

File Type Posted
Atch 3 - Wage Determination.pdf PDF
Atch 2 - Provisions and Clauses.pdf PDF
CSS W912LP-24-R-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT (PWS)

FOR

Field Maintenance Shop # 3 Vehicle Rotary Lift Repair Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Field Maintenance Shop (FMS) 3 Vehicle Rotary Lift Repair Service, as defined in this PWS.

1.1.1 Objectives: Repair Rotary Lift to safely lift equipment at systems authorized limit.

Inspection, component repair, service, refurbishment, and update to original manufacture standard, and testing procedures required to bring equipment to serviceable condition.

1.2 Background: Rotary Lift no longer meets American National Standard (ANSI) “Automotive Lifts – Safety Requirements for Construction, Testing, and Validation” ANSI/ALI Automotive Lift Operation, Inspection and Maintenance (ALOIM). Equipment failure was identified by annual FMS lift inspections and shall be repaired to safely lift FMS equipment.

1.3 Period of Performance (PoP): The Period of Performance shall be completed within 120 days after contract award date.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at FMS 3, 3200 2ND Mech Drive, Sioux City, IA 51111.

The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

Attachment 1 - Performance Work Statement

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Reserved

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 Reserved

1.4.5.2 Reserved

1.4.5.3 Reserved

1.4.5.4 Reserved.

1.4.5.5 Reserved

1.4.5.6 Reserved

1.4.5.7 Reserved

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Reserved

1.4.5.11 Reserved

1.4.5.12 Reserved

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Reserved

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Reserved

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Contractor Travel: The contractor shall travel to FMS 3, 3200 2ND Mech Drive, Sioux City, IA during the performance of this contract to repair FMS 3 Rotary. The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract.

All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made.

1.4.13 Reserved

1.4.14 Reserved

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms: (List all acronyms used in the PWS and what they represent. At a minimum, insert the acronyms provided below. You may delete acronyms not used in the PWS but should not delete the entire Acronyms section.)

AT/OPSEC Antiterrorism/Operational Security ASI Automotive Lift Institute CM Contract Manager COR Contracting Officer Representative DA Department of the Army DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army

KO Contracting Officer NGB National Guard Bureau POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan SCR Service Contract Reporting TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.

3.2 Materials: Reserved

3.3 Equipment: Reserved

3.4 Services: Reserved

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.1.1 Expenses: All expenses including but not limited to the following, shall be incurred by the contractor and shall be included in the firm fixed price proposal.

4.1.1.1 Travel, lodging and meals for contractor and employees.

4.1.1.2 Tools and materials required to perform repairs.

4.2 Reserved

4.3 Reserved

5.0 Requirements: The contractor shall:

5.1 Perform equipment inspection and repairs to a Rotary Lift model: MCHW618U100, serial No.: HBJ15F0013. Contractor shall return the lift to fully serviceable condition in accordance with manufacturer and government standards. The following are known repair/replacement items:

P/N: M140018 – MACH Control Board Replacement P/N: FA7963 – UI Board P/N: M140014 – Service Chip

Notify Contracting Officer immediately for approval if additional repair(s)/part(s) are needed to meet the requirements stated herein. All additional repair(s)/part(s) provided without the Contracting Officer’s prior approval are completed at contractor’s own expense.

5.2 Contractor shall ensure the Lift is repaired to meet the Certified Automotive Lift under the provisions of ANSI/ALI ALCTV-2011 requirements to meet the industry standards of Automotive Lift Institute (ALI).

5.2.1 Contractor shall submit certificates from ALI for employees conducting the inspection and repairs with proposal.

5.2.2 Contractor’s proposal shall include an itemized breakdown of each expense to include but not limited to: labor, parts, consumables, milage, etc. The Iowa National Guard is exempt from State and Federal taxes.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsef ar

Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarsp gi/current/index.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/tr avelreg.cfm

6.1 Applicable Forms: None

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance Method /

By Whom 5.1

Perform equipment inspection and repair to the Rotary Lift

The contractor shall repair Rotary Lift to 100% capabilities.

Meets the standard 100% of the time.

100% Inspection / COR or a Unit POC