W912LC-18-B-0001_Amendment_5.pdf

PDF 139 KB Posted

Attached to
Space Battalion Readiness Center
Solicitation number
W912LC-18-B-0001
Issued by

About this file

W912LC-18-B-0001 Amendment 05-revise drawings and specifications

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPFO-PNC-CO

660 S. ASPEN ST., MS #66, BLDG 1005

BUCKLEY AIR FORCE BASE

AURORA CO 80011-9551

080115

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Title: (National Guard) Space Battalion Readiness Center, Fort Carson, Colorado.

Project Number: PN080115 Amendment 5 is issued as follow s:

1) Revise various draw ings and specification sections as described on block 14 continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LC18B0001

X 9B. DATED (SEE ITEM 11)

17-Sep-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Oct-2018

CODE

NATIONAL GUARD BUREAU-AQ

111 SOUTH GEORGE MASON DR

BLDG. 2, 4TH FLOOR

ARLINGTON VA 22202-1373

W9133L 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912LC

FACILITY CODECODE

EMAIL:TEL:

W912LC18B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 5

CHANGES TO THE SPECIFICATION WITHOUT REISSUING:

SPECIFICATION SECTION 32 13 13

ADD THE FOLLOWING PARAGRAPH TO 1.02 SUMMARY:

B. Colorado Department of Transportation CDOT Type P concrete pavement mixes with a demonstrated successful performance can be submitted for approval, as long as the mix meets the minimum 28 day 4500 psi compressive strength and 650 psi minimum modulus of rupture (flexural strength) described in paragraph 2.04 of this specification.

SPECIFICATION SECTION 08 33 23

DELETE:

1.1 SUMMARY

A. Section Includes:

1. Counter doors.

2. Insulated coiling doors @ GPWB and Unheated Storage

ADD:

1.1 SUMMARY

A. Section Includes:

1. Counter doors.

2. Vertical Lift Overhead Doors at Assembly Hall (OLI #4)

3. Insulated coiling doors heated storage, facility maintenance (OLI #1), and unheated storage (OLI #2)

Under Paragraph 2.9 DOOR ASSEMBLY

DELETE:

C. Door Curtain Material: Stainless steel.

ADD:

C. Door Material:

1. Supply Counter Doors: Stainless Steel

2. Vertical Lift Overhead Doors at Assembly Hall (OLI #4): Clear Anodized Aluminum

FINISH MATERIAL SCHEDULE

On page 09040-4

On the line labeled for Specification Section 08 3323 OH Coiling Doors, OHD-4:

DELETE:

Match Antique Bronze

ADD:

Match MWP-4

On the line labeled for Specification Section 08 3323 Security Shutter OHD-5 Overhead Door

DELETE:

O.H. Manual Coiling Grille / 6' W x 3'-7" H Stainless Steel Supply Counters

O.H. Manual Coiling Door / 6' W x 3'-7" H Stainless Steel with Stainless Steel Hood Counter and Frame

CHANGES TO THE SPECIFICATION WITH REISSUING:

REPLACE Specification Section 03 30 00, dated June 7, 2018 WITH new Specification Section 03 30 00, dated October 24, 2018.

CHANGES TO THE DRAWINGS WITHOUT REISSUING:

Drawing Sheets A301-D, A302-D, A303-D and A304-D

On the EXTERIOR FINISH SCHEDULE (BASIS OF DESIGN) Under the column COLOR for OHD-1, OHD-2 and OHD-3

DELETE:

MATCH MWP-1

ADD:

CLEAR ANODIZED ALUMINUM

Under the column COLOR for OHD-4

DELETE:

MATCH ANTIQUE BRONZE

MATCH MWP 4

Drawing Sheet A701 On the DOOR AND FRAME SCHEDULE (RE: SPEC 090640 FOR FINAL COLOR/FINISH)

Under the Column labeled DOORS, sub-column CONST for Doors 1225B, 1226B and 1227 B

DELETE:

HM

ADD:

OVERHEAD COILING DOOR

Under the Column labeled DOORS, sub-column FINISH for Doors 1225B, 1226B and 1227 B

DELETE:

PT

ADD:

MFR

Under the Column labeled DOORS, sub-column FINISH for Doors 1301C 1301E, 1303C, 1401B and 1401C

ADD:

MFR

Under the Column labeled REMARKS for Doors 1228 B and 1229B

DELETE

PER MFR TO MATCH PT-7

ADD:

MFR

Under the Column labeled DOORS, sub-column CONST for Doors 1301C, 1301E, 1303C, 1401B, 1401C

DELETE:

OVERHEAD COILING

OVERHEAD ROLLING

CHANGES TO THE DRAWINGS WITH REISSUING:

1. REPLACE Drawing Sheet C201-D with new Drawing Sheet C201-E

2. REPLACE Drawing Sheet A411-D with new Drawing Sheet A411-E

3. REPLACE Drawing Sheet A 651-E with new Drawing Sheet A 651-E

4. Issue SKETCH SKA-1 provides a detail on how to infill between the high and low roofs and supplements the structural details F&G/S320 where the I beam occurs at the low and high roofs in building area B

(End of Summary of Changes)

File details come from the government source that posted it.