This document contains questions and answers regarding a federal solicitation for repainting the exterior of a main hangar building. The solicitation is for the California Army National Guard and seeks to paint all exterior surfaces of the building, including windows, doors, and any exterior frames. Bidders must comply with prevailing wage requirements and insurance standards outlined in FAR clauses. The entire painting crew will need to complete all required trainings on flight line safety, FOD, OPSEC, and iWATCH. One supervisor may oversee safety and quality control provided they have the necessary certifications. Access to low roofs will be via hatches and ladders or by using the contractor's own lift.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. Is there a union or prevailing wage requirement?

A1. Yes, See wage determination starting on Page 39 of the solicitation. General Decision Number: CA20230018

Q2. What types of insurances (liability or otherwise) or endorsements are required for this job?

A2. See included FAR Clause 52.228-5 Insurance - Work On A Government Installation

Q3. Looks like SOW includes only exterior paint all around the building, but some area of SOW refers to offices in South and North side. Is there any interior paint in this contract?

A3. There is no interior painting. Exteriors only. The SOW is referring to the exterior of the North and South side offices.

Q4. SOW refers to Caulking and sealing. Should we consider to seal all Windows in SOW? Do we have idea how much seal and caulking needed?

A4. I am not sure why they would need to caulk or seal windows. Is this something painters need to do? No caulking or sealing is needed. Remove from SOW.

Q5. Should we include in SOW painting of exterior frames on windows.

A5. Yes, paint the exterior window frames since that is part of the exterior of the building

Q6. Can we walk on or work off of the low roofs?

A6. Yes, they can access hatches through ladders from inside the building or take their own lift to the top of the low roofs.

Q7. Is it acceptable to have one person on site as Superintendent/Safety/QC manager if that person has QC certificate and OSHA/EM 385-1.1 certificate?

A7. Yes, This is allowed.

Q8. Should entire crew go through training for Flight line, AT level 1, FOD, Level 1 OPSEC, iWATCH Training? Or only superintendent need to go through these trainings?

A8. Entire crew should take all training

Q9. Should we include exterior side and frames of doors in SOW?

A9. Yes, any exterior door and frame should be painted