QUOTES ARE DUE BY: 1300 / 1:00 p.m. (PST), 20 September 2018
Request for Proposal (RFP) 195 OG – Trailer Utilities
195th Wing, Beale AFB, California
On behalf of the 195th Operations Group (195OG), located at the Sepulveda Air National Guard Station, the 195th Contracting Office (195WG/MSC) is seeking quotes from qualified small business sources to provide utilities to temporary facilities (trailers) located at the site.
Project Title: 195 OG Trailer Utilities
Solicitation Issue Date: 6 September 2018
Contract Type: Firm-Fixed Price (FFP)
Location of Performance: 15900 Victory Blvd. Van Nuys, CA 91406
Project Scope:
The general scope of this work is for the contractor to provide all equipment, personnel, tools, materials, supervision, Personal Protective Equipment (PPE) and any other items necessary to construct utility systems to include but not limited to: electrical, Communication, Water, Sewer, Asphalt and Seal Coating to a temporary portable office building located at the Sepulveda Air National Guard Station as required by the statement of work, technical specifications, and drawings. Please reference the attachments as designated below for additional information regarding the requirement.
Contractual History:
The proposed requirement is a new requirement, and there is no previous or current contractor.
NAICS and Small Business Size Standard:
The NAICS Code for this acquisition is 238210, Electrical Contractors and Other Wiring Installation Contractors.
The Small Business Size Standard is $15,000,000.00.
**PLEASE NOTE: THIS ACQUISITION IS A 100% SMALL-BUSINESS SET-ASIDE**
Project Magnitude:
The government anticipates the magnitude of construction for this requirement to be between $25,000.00 and $100,000.00 in accordance with (IAW) FAR 36.204.
Pre-Proposal Conference / Site Visit:
A site-visit will be conducted at 1000 / 10:00 a.m. PST on Thursday, 13 September 2018.
Attendees will meet MSgt Mike DeAngelo at 15900 Victory Blvd. Van Nuys, CA 91406. A pre-proposal conference will not be held.
Once you have arrived at the designated location, please contact MSgt Mike DeAngelo at (530) 955-1599 for installation access. No pre-coordinated Entry Authority List (EAL) is required.
Questions / Requests for Information (RFIs):
Any questions or concerns regarding the project must be submitted in writing or by email to TSgt Smith by close of business (COB) Monday, 17 September 2018. Questions received after this deadline may not be answered. All RFIs will be answered no later than (NLT) Tuesday, 18 September 2018.
Offerors MAY NOT contact any points of contact identified in this RFP or its attachments until the contract is awarded by the Contracting Officer (KO).
Questions, RFIs, or concerns may be submitted as follows:
TSgt Justin K. Smith at: justin.smith.173@us.af.mil
Instructions to Offerors:
General:
Conflict of Interest:
Any Offeror (or member of its team (and /or subcontractor) having a conflict of interest as defined under FAR Part 9.5 must identify the conflict as soon as it is known and provide a recommended mitigation plan. Mitigation plans are required whenever a competing Contractor has had unequal access to non-public information regarding the task order requirement, or has assisted the Government in defining the task order requirements or evaluation criteria.
Evaluation Process:
The evaluation process is as follows:
(a) First, the government will list all proposals from lowest-price to highest-price.
(b) Second, the Government will evaluate Offeror technical capability as either Acceptable or Unacceptable; based on the proposal meeting the minimum requirements of the solicitation.
Rating Description
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
The evaluation of price will consider the overall price. The evaluation of price will be considered for award on the basis of award for some, none, or all portions of work proposed.
The Government will base its evaluation solely on information presented in the Offeror's proposal. Government review and determination of technical acceptability is objective, and the Contracting Officer's determination shall be final.
The Government intends to evaluate proposals and award a contract without discussions; the Offeror's initial proposal should contain the Offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them necessary.
Unsuccessful Offerors will be notified concurrent with contract issuance to the successful Offeror.
Department of Labor Wage Determination – Davis-Bacon Act:
The applicable Wage Determination for this task order will be Department of Labor Davis- Bacon Act (DBA) Wage Determination General Decision Number CA180033 08/24/2018 CA33 (Attachment 5).
Proposal Submittal Instructions:
Proposal Format and Delivery:
Offerors shall prepare and mail, commercially-deliver, hand-deliver, or email one (1) copy of their proposal as follows:
Justin K. Smith Base Contracting Officer
195WG/MSC
17840 13th St.
Building 2180
Beale AFB, CA 95903 or justin.smith.173@us.af.mil
Electronic proposals via facsimile (fax) will not be accepted.
Proposals are due no later than 1300 / 1:00 p.m. PST, 20 September 2018.
Proposal Acceptance Period:
All offers submitted in response to this solicitation must remain valid for Government acceptance through 30 September 2018; proposals that expire prior to this date will not be accepted.
PLEASE INCLUDE THE FOLLOWING INFORMATION ALONG WITH YOUR QUOTE:
Offeror Name:
mailto:justin.smith.173@us.af.mil
Address:
Point of Contact:
Phone Number:
E-mail Address:
Tax Identification Number
(TIN):
DUNS:
CAGE Code: __________________________________________
Circle one: Offeror is / is not a women owned small business.
Circle one:
Offeror is / is not SAM registered in www.sam.gov
Other Classifications:
(ex: 8(a), HubZone, woman-owned, veteran-owned, service-disabled veteran-owned)
Provisions and Clauses (By Reference):
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements Jan-17
52.204-7 System for Award Management Oct-16 52.204-8 Annual Representations and Certifications Jan-18 52.204-9 Personal Identity Verification of Contractor Personnel Jan-11 52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards Oct-16
52.204-12 Unique Entity Identifier Maintenance Oct-16 http://www.sam.gov/
52.204-13 System for Award Management Maintenance Oct-16 52.204-16 Commercial and Government Entity Code Reporting Jul-16 52.204-18 Commercial and government Entity Code Maintenance Oct-16 52.204-19 Incorporation by Reference of Representations and Certifications Dec-14 52.204-21 Basic Safeguarding of Covered Contractor Information Systems Jun-16 52.204-22 Alternative Line Item Proposal Jan-17 52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities Jul-18
52.208-8 Required Sources for Helium and Helium Usage Data Aug-18 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations—
Representation Nov-15
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
Oct-15
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations Nov-15 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law Feb-16
52.211-10 Commencement, Prosecution, and Completion of Work Apr-84 52.219-1 Small Business Program Representations Oct-14 52.219-1 Small Business Program Representations--Alternate I Sep-15 52.219-6 Notice of Total Small Business Set-Aside Nov-11 52.222-3 Convict Labor Jun-03 52.222-4 Contract Work Hours and Safety Standards —Overtime
Compensation May-18
52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work May-14 52.222-6 Construction Wage Rate Requirements Aug-18 52.222-7 Withholding of Funds May-14 52.222-8 Payrolls and Basic Records Aug-18 52.222-9 Apprentices and Trainees Jul-05 52.222-10 Compliance with Copeland Act Requirements Feb-88 52.222-11 Subcontracts (Labor Standards) May-14 52.222-12 Contract Termination—Debarment May-14 52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations May-14
52.222-14 Disputes Concerning Labor Standards Feb-88 52.222-15 Certification of Eligibility May-14 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding
$15,000 May-14
52.222-21 Prohibition of Segregated Facilities Apr-15 52.222-22 Previous Contracts and Compliance Reports Feb-99 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction Feb-99
52.222-26 Equal Opportunity Sep-16 52.222-27 Affirmative Action Compliance Requirements for Construction Apr-15 52.222-30 Construction Wage Rate Requirements—Price Adjustment (None or
Separately Specified Method) Aug-18
52.222-50 Combating Trafficking in Persons Mar-15 52.222-55 Minimum Wages Under Executive Order 13658 Dec-15 52.222-62 Paid Sick Leave Under Executive Order 13706 Jan-17 52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts.
Sep-13
52.223-5 Pollution Prevention & Right-To-Know Information May-11 52.223-6 Drug-Free Workplace May-01 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and
Construction Contracts.
Aug-18
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
Aug-11
52.223-19 Compliance with Environmental Management Systems May-11 52.223-20 Aerosols Jun-16 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction
Goals—Representation Dec-16
52.225-9 Buy American—Construction Materials May-14 52.225-13 Restrictions on Certain Foreign Purchases Jun-08 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran—Representation and Certifications
Aug-18
52.232-5 Payments under Fixed-Price Construction Contracts May-14 52.232-23 Assignment of Claims May-14 52.232-27 Prompt Payment for Construction Contracts Jan-17 52.232-33 Payment by Electronic Funds Transfer—System for Award
Management Jul-13
52.232-39 Unenforceability of Unauthorized Obligations Jun-13 52.232-40 Providing Accelerated Payments to Small Business Subcontractors Dec-13 52.233-1 Disputes May-14 52.233-3 Protest After Award Aug-96 52.233-4 Applicable Law for Breach of Contract Claim Oct-04 52.236-2 Differing Site Conditions Apr-84 52.236-5 Material and Workmanship Apr-84 52.236-27 Site Visit (Construction) Feb-95 52.236-27 Site Visit (Construction)--Alternate I Feb-95 52.242-14 Suspension of Work Apr-84 52.243-5 Changes and Changed Conditions Apr-84 52.244-6 Subcontracts for Commercial Items Aug-18
52.245-1 Government Property Jan-17 52.246-12 Inspection of Construction Aug-96 52.246-21 Warranty of Construction Mar-94 52.252-1 Solicitation Provisions Incorporated by Reference Feb-98 52.252-2 Clauses Incorporated by Reference Feb-98 52.252-3 Alterations in Solicitation Apr-84 52.253-1 Computer Generated Forms Jan-91 252.203-
Requirements Relating to Compensation of Former DoD Officials Sep-11
252.203-
Requirement to Inform Employees of Whistleblower Rights Sep-13
252.203-
Representation Relating to Compensation of Former DoD Officials Nov-11
252.204-
Control of Government Personnel Work Product Apr-92
252.204-
Alternate A, Annual Representations and Certifications Jan-15
252.204-
Safeguarding Covered Defense Information and Cyber Incident Reporting
Oct-16
252.204-
Notice of Authorized Disclosure of Information for Litigation Support May-16
252.211-
Reporting of Government-Furnished Property Aug-12
252.223-
Prohibition of Hexavalent Chromium Jun-13
252.225-
Export-Controlled Items Jun-13
252.225-
Secondary Arab Boycott of Israel Jun-05
252.232-
Electronic Submission of Payment Requests and Receiving Reports Jun-12
252.232-
Levies on Contract Payments Dec-06
252.236-
Modification Proposals--Price Breakdown Dec-91
252.236-
Contract Drawings and Specifications Aug-00
252.243-
Pricing of Contract Modifications Dec-91
252.244-
Subcontracts for Commercial Items Jun-13
252.245-
Tagging, Labeling, and Marking of Government-Furnished Property Apr-12
252.245-
Reporting Loss of Government Property Dec-17
252.245-
Contractor Property Management System Administration Apr-12
252.245-
Reporting, Reutilization, and Disposal Dec-17
252.246-
Safety of Facilities, Infrastructure, and Equipment for Military Operations
Oct-10
252.247-
Transportation of Supplies by Sea--Basic Apr-14
Provisions and Clauses (Full Text):
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JUL 2013)
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following re-representation and submit it to the contracting office, along with the contract number and the date on which the re-representation was completed:
The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code _____________ assigned to contract number ______________________________.
[Contractor to sign and date and insert authorized signer's name and title].
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.232-25 PROMPT PAYMENT (JAN 2017)
(a) Invoice payments—
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the **** day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Regulations URLs: (Click on the appropriate regulation.)
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/far1toc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfartoc.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/affar1toc.htm
NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page, conduct a search for the desired regulation reference using your browser's FIND function. When located, click on the regulation reference (hyperlink).
252.203-7996 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE
CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—REPRESENTATION
(DEVIATION 2016-O0003)(OCT 2015)
(a) In accordance with section 101(a) of the Continuing Appropriations Act, 2016 (Pub. L. 114-
53) and any subsequent FY 2016 appropriations act that extends to FY 2016 funds the same restrictions as are contained in section 743 of division E, title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), none of the funds appropriated (or otherwise made available) by this or any other Act may be used for a contract with an entity that requires employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or contactors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(b) The prohibition in paragraph (a) of this provision does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(c) Representation. By submission of its offer, the Offeror represents that it does not require employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or contactors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(End of provision)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Invoice and Receiving Report (Combo)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Destination / Destination
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table Field Name in WAWF Data to be entered in WAWF Contract Number (TBD) Delivery Order Number (TBD) Pay Official DoDAAC F87700 Issue By DoDAAC W912LA Admin DoDAAC W912LA Inspect By DoDAAC FA6045 Extension - F9YGC0 Ship To Code FA6045 Extension - F9YGC0 Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) FA6045 Extension - F9YGC0 Service Acceptor (DoDAAC) FA6045 Extension - F9YGC0 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Not Applicable
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(TBD)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
Attachments:
1. Statement of Work (SOW) – 4 pages.
2. Drawings (Electrical) – 1 page.
3. Drawings (Water and Sewer) – 1 page.
4. Drawings (Plumbing) – 1 page.
5. Wage Determination (CA180033 08/24/2018 CA33) – 27 pages.
Statement of Work Install Utilities to Temporary Facility
Sepulveda Air National Guard Station
1. DESCRIPTION OF SERVICES
1.1 Description: The general scope of this work is for the contractor to include all material, labor, plant, tools, equipment, supervision and transportation to improve pavements and install utilities to a temporary portable office building located at the Sepulveda Air National Guard Station as required by the statement of work, technical specifications, and drawings.
1.2 Location: All work will be performed at the:
Sepulveda Air National Guard Station 15900 Victory Blvd
Van Nuys, California 91406
1.3 Technical Point of Contact (POC): Wherever in this Performance Work Statement the abbreviation POC is referenced, it shall be the same as if the term Technical Point of Contact is referenced. The on-site POC for this service will be Gregory Alonzo who can be contacted at gregory.alonzo.2@us.af.mil or (818) 909-2347. No Government personnel, other than the Contracting Officer, have the authority to change or alter these requirements. The POC shall clarify technical points or supply relevant technical information, but no requirements in this scope of work may be altered as a sole result of such clarification.
2. BASIC SERVICES: The intent of this project is to provide, install and connect general utilities from Bldg. 22 to the Temporary Office Trailer. This project requires qualified construction service expertise to provide all the necessary connections for all the utilities (electric/water connection/plumbing/sewer etc.) and life safety requirements. This project must meet all applicable state and federal codes in order for occupation of CA ANG staff in this facility.
2.1 Electrical
2.1.1 Contractor shall assess the available power in the Electrical Room of Bldg 22.
Contractor shall install all necessary panels, sub-panels, transformer, equipment, conduit, conductors, mast heads, power poles, etc. to provide overhead power to the Temporary Office Trailer located west of Bldg 22. The Temporary Office Trailers include two 230/208 Volt, 125 amp, single phase power panels located on the west end of the Temporary Office Trailer.
2.1.2 Contractor shall verify proper operation, voltage and grounding in accordance with attached specifications.
2.2 Communication
2.2.1 Install 1” conduit to house communications fiber from Bldg. 22, Telecomm room
107, to the exterior of Temporary Office Trailer within 2 linear feet of the electrical power being installed. Contractor shall not penetrate the roof covering.
2.2.2 The Government will install the fiber from the Telecomm Room to a patch panel in the Temporary Office Trailer via the contractor installed conduit.
mailto:gregory.alonzo.2@us.af.mil
Deductive Item #1
2.3 Water
2.3.1 Install a 1” water supply from the existing aboveground water line located at the west entrance to Bldg. 22 to the water system in the temporary office building as shown on attached drawings. Waterline shall be installed underground from Bldg.
22 under the roadway to the edge of the temporary office building site and then underneath the trailer to the connection point on the south side of the Temporary Office Trailer.
2.3.2 An accessible isolation valve ball valve and a pressure reducer shall be installed where waterline is tapped on Bldg. 22 going to Temporary Office Trailer.
2.3.3 Contractor shall properly mark all installed underground pipe with detectable underground marking tape, compact subgrade and repair asphalt to original state.
2.3.4 Contractor shall test and verify proper operation of water supply to the Temporary Office Trailer site for industry standard water pressure and GPM flow.
2.4 Sewer Connection
2.4.1 Contractor shall install a sewer connection from the existing sewer clean-out, to the
Temporary Office Building. The sewer clean-out is located under the roadway midway between Bldg. 22 and the Temporary Office Trailer location as referenced on attached drawings.
2.4.2 Contractor shall provide a clean-out at the Temporary Office Building connection points and at the connection point under the roadway.
2.4.3 Install a suitable access cover in the roadway for access to the clean-out.
2.4.4 Contractor shall properly mark underground pipe with detectable underground marking tape, compact subgrade and repair asphalt to original.
2.4.5 Contractor shall verify newly installed sewer system drains properly and does not leak.
Deductive Item #2
1.1 Asphalt Work and Seal Coating
1.1.1 Remove existing asphalt curbing on the north and east side of the temporary office building as indicated on the attached diagram. Properly dispose of, or recycle asphalt curbing.
1.1.2 Remove sufficient soil and regrade the dirt strip, install and compact base course in preparation for asphalt to be placed between the temporary office building site and the roadway as indicated on the drawing.
1.1.3 Remove approximately 12 concrete bases to old chain-link fence posts that have been removed.
1.1.4 Remove sufficient soil, place and compact base course at an approximately 13’ X 20’ dirt patch on the north side of the temporary office building location.
1.1.5 Install asphalt at the dirt strip and dirt patch and join into the existing asphalt.
Insure new asphalt properly drains water away from the temporary office building to the north and east.
1.1.6 Seal coat the existing asphalt area in front of the temporary office building as indicated on the attached diagram. Prior to seal coating, fill cracks and sweep surface of all debris.
2. ADDITIONAL ITEMS:
2.1 Work shall meet or exceed all appropriate Local, State and Federal regulations.
2.2 Contractor shall provide submittals on AF Form 3000 to the Contracting Officer for all items to be installed for approval. The Government shall respond to all submittals within 14 business days.
2.3 2 sets of hard copy reproducible as-built drawings are required upon completion of the project.
2.4 All utilities indicated on maps are approximate and for reference only. Contractor shall locate all utilities in work area prior to any trenching.
2.5 Utility outages are unacceptable unless requested 14 days in advance and approved by the Contracting Officer. Coordination for planned utility outages are a responsibility of the contractor to forecast and manage once approved.
2.6 The Contractor shall dispose of all construction debris off-site in accordance with all applicable laws and regulations.
2.7 Period of Performance: Contractor shall complete performance of all contractual obligations within 60 days of Notice to Proceed (NTP) issuance.
3. GENERAL REQUIREMENTS:
3.1 MEASUREMENTS and QUANTITIES: Measurements and quantities are provided to enhance the contractor’s understanding of the magnitude of the work required in this Performance Work Statement. Government provided measurements and quantities shall not be used by contractors in establishing pricing. Contractors are responsible for making their own measurements in determining their bids for work under this project.
3.2 PREVAILING WAGE RATE: The contractor’s bid proposal will comply with the Davis-Bacon
Act, WD CA180033 08/24/2018 CA33
3.3 GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government will provide access to the facilities within the Sepulveda ANGS as needed to complete the contracted work.
Power and water are available only to the degree of being utilized for meeting contractual obligations.
3.4 HOURS OF OPERATION: Normal hours of operation are from 7:00 a.m. to 4:00 p.m., Monday through Friday excluding federal holidays. Access to Sepulveda ANGS facilities at other times will require prior coordination with the COR. Contract work is not normally scheduled on weekends.
3.5 SECURITY REQUIREMENTS: All contractor personnel entering the installation must be authorized by the COR. It is unlawful to enter the installation without permission of the Installation Commander per Sec. 21 Internal Security Act of 1950; 50 U.S.C. 797. While on the installation, all personnel and the property under their control is subject to search. All contractor personnel must identify themselves upon request while working on the installation. All personnel must be a United States Citizen with identification (i.e. State issued driver’s license) or a properly documented foreign worker with appropriate paperwork on hand.
3.6 A site visit, while not mandatory, is highly advised for all interested parties
4. BUSINESS PRACTICES AND CONSTRUCTION GUIDES:
4.1 United Facilities Guide Specifications
4.1.1 DIVISION 01 - GENERAL REQUIREMENTS
4.1.1.1 01 11 00 SUMMARY OF WORK
4.1.1.2 01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
4.1.1.3 01 30 00 ADMINISTRATIVE REQUIREMENTS
4.1.1.4 01 32 01.00 10 PROJECT SCHEDULE
4.1.1.5 01 33 00 SUBMITTAL PROCEDURES
4.1.1.6 01 35 13 SPECIAL PROJECT PROCEDURES
4.1.1.7 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
4.1.1.8 01 45 00.00 40 QUALITY CONTROL
4.1.1.9 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
4.1.1.10 01 75 00.00 40 STARTING AND ADJUSTING
4.1.1.11 01 78 00 CLOSEOUT SUBMITTALS
4.1.1.12 01 78 23 OPERATIONS AND MAINTENANCE DATA
4.1.1.13 01 91 00.00 40 COMMISSIONING
4.1.2 DIVISION 02 - EXISTING CONDITIONS
4.1.2.1 02 41 00 DEMOLITION
4.1.3 DIVISION 07 - THERMAL AND MOISTURE PROTECTION
4.1.3.1 07 19 00 WATER REPELLENTS
4.1.3.2 07 84 00 FIRESTOPPING
4.1.3.3 07 92 00 JOINT SEALANTS
4.1.4 DIVISION 22 - PLUMBING
4.1.4.1 22 00 00 PLUMBING, GENERAL PURPOSE
4.1.5 DIVISION 26 - ELECTRICAL
4.1.5.1 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
4.1.5.2 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
4.1.5.3 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
4.1.5.4 26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
4.1.5.5 26 08 00 APPARATUS INSPECTION AND TESTING
4.1.5.6 26 24 16.00 40 PANELBOARDS
General Decision Number: CA180033 08/24/2018 CA33
Superseded General Decision Number: CA20170033
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: Los Angeles County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 01/19/2018 3 02/09/2018 4 02/23/2018 5 04/20/2018 6 05/04/2018 7 05/18/2018 8 06/15/2018 9 06/29/2018 10 07/06/2018 11 07/13/2018 12 07/20/2018 13 08/17/2018 14 08/24/2018
ASBE0005-002 07/03/2017
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, 8/30/2018https://www.wdol.gov/wdol/scafiles/davisbacon/CA33.dvb?v=14 protective coverings, coatings, and finishes to all types of mechanical systems).....$ 39.72 20.81 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)...........................$ 26.96 17.81
ASBE0005-004 07/03/2017
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 19.26 11.27
BOIL0092-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 44.07 33.52
* BRCA0004-007 05/01/2018
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 40.46 15.15
*The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate
BRCA0018-004 07/01/2017
Rates Fringes
MARBLE FINISHER..................$ 30.93 12.95
TILE FINISHER....................$ 25.98 11.23
TILE LAYER.......................$ 37.76 16.37
BRCA0018-010 09/01/2017
Rates Fringes
TERRAZZO FINISHER................$ 29.75 12.91
TERRAZZO WORKER/SETTER...........$ 36.75 13.82
CARP0409-001 07/01/2016
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 39.83 15.50
(2) Millwright..............$ 40.90 15.50
(3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 40.53 15.50
(4) Pneumatic Nailer, Power Stapler...............$ 40.09 15.50
(5) Sawfiler...............$ 39.83 15.50
(6) Scaffold Builder.......$ 31.60 15.50
(7) Table Power Saw Operator....................$ 40.93 15.50
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional.
CARP0409-002 07/01/2016
Rates Fringes
Diver
(1) Wet.....................$ 712.48 17.03
(2) Standby.................$ 356.24 17.03
(3) Tender..................$ 348.24 17.03
(4) Assistant Tender........$ 324.24 17.03
Amounts in "Rates' column are per day
CARP0409-005 07/01/2015
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 40.40 15.03
STOCKER/SCRAPPER............$ 10.00 7.17
CARP0409-008 08/01/2010
Rates Fringes
Modular Furniture Installer......$ 17.00 7.41
ELEC0011-004 07/30/2018
ELECTRICIAN (INSIDE
ELECTRICAL WORK)
Journeyman Electrician......$ 43.35 3%+27.87
ELECTRICIAN (INTELLIGENT
TRANSPORTATION SYSTEMS Street Lighting, Traffic Signals, CCTV,and Underground Systems) Journeyman Transportation Electrician.................$ 44.40 3%+27.82 Technician..................$ 33.30 3%+27.82
FOOT NOTE:
CABLE SPLICER & INSTRUMENT PERSON: Recieve 5% additional per hour above Journeyman Electrician basic hourly rate.
TUNNEL WORK: 10% additional per hour.
SCOPE OF WORK - TRANSPORTATION SYSTEMS
ELECTRICIAN:
Installation of street lights and traffic signals,including electrical circuitry, programmable controllers, pedestal-mounted electrical meter enclosures and laying of pre-assembled multi-conductor cable in ducts, layout of electrical systems and communication installation, including proper position of trench depths and radius at duct banks, location for man holes, pull boxes, street lights and traffic signals.
Installation of underground ducts for electrical,telephone, cable television and communication systems.
Pulling,termination and splicing of traffic signal and street lighting conductors and electrical systems including interconnect,detector loop, fiber optic cable and video/cable.
TECHNICIAN:
Distribution of material at job site, manual excavation and backfill, installation of system conduits and raceways for electrical, telephone, cable television and communication systems. Pulling, terminating and splicing of traffic signal and street lighting conductors and electrical systems including interconnect, detector loop, fiber optic cable and video/data.
* ELEC0011-005 07/30/2018
COMMUNICATIONS & SYSTEMS WORK (excludes any work on Intelligent Transportation Systems or CCTV highway systems)
Rates Fringes
Communications System Installer...................$ 33.64 3%+14.33 Technician..................$ 33.30 3%+27.82
SCOPE OF WORK The work covered shall include the installation, testing, service and maintenance, of the following systems that utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for TV monitoring and surveillance, background foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms and low voltage master clock systems.
A. Communication systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems SCADA (Supervisory control/data acquisition PCM (Pulse code modulation) Inventory control systems Digital data systems Broadband & baseband and carriers Point of sale systems VSAT data systems Data communication systems RF and remote control systems Fiber optic data systems
B. Sound and Voice Transmission/Transference Systems Background-Foreground Music Intercom and Telephone Interconnect Systems Sound and Musical Entertainment Systems Nurse Call Systems Radio Page Systems School Intercom and Sound Systems Burglar Alarm Systems Low-Voltage Master Clock Systems Multi-Media/Multiplex Systems Telephone Systems RF Systems and Antennas and Wave Guide
C. *Fire Alarm Systems-installation, wire pulling and testing.
D. Television and Video Systems Television Monitoring and Surveillance Systems Video Security Systems Video Entertainment Systems Video Educational Systems CATV and
CCTV
E. Security Systems, Perimeter Security Systems, Vibration Sensor Systems Sonar/Infrared Monitoring Equipment, Access Control Systems, Card Access Systems
*Fire Alarm Systems
1. Fire Alarms-In Raceways: Wire and cable pulling in raceways performed at the current electrician wage rate and fringe benefits.
2. Fire Alarms-Open Wire Systems: installed by the Technician.
ELEC1245-001 06/01/2018
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 56.79 17.91
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 45.36 16.74
(3) Groundman...............$ 34.68 16.36
(4) Powderman...............$ 49.55 3%+17.65
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0018-001 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 53.85 32.645
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0012-003 07/01/2018
Rates Fringes
OPERATOR: Power Equipment (All Other Work)
GROUP 1....................$ 45.30 25.25
GROUP 2....................$ 46.08 25.25
GROUP 3....................$ 46.37 25.25
GROUP 4....................$ 47.86 25.25
GROUP 5....................$ 48.96 25.25
GROUP 6....................$ 48.08 25.25
GROUP 8....................$ 48.19 25.25
GROUP 9....................$ 49.29 25.25
GROUP 10....................$ 48.31 25.25
GROUP 11....................$ 49.41 25.25
GROUP 12....................$ 48.48 25.25
GROUP 13....................$ 48.58 25.25
GROUP 14....................$ 48.61 25.25
GROUP 15....................$ 48.69 25.25
GROUP 16....................$ 48.81 25.25
GROUP 17....................$ 48.98 25.25
GROUP 18....................$ 49.08 25.25
GROUP 19....................$ 49.19 25.25
GROUP 20....................$ 49.31 25.25
GROUP 21....................$ 49.48 25.25
GROUP 22....................$ 49.58 25.25
GROUP 23....................$ 49.69 25.25
GROUP 24....................$ 49.81 25.25
GROUP 25....................$ 49.98 25.25
OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting)
GROUP 1....................$ 46.65 25.25
GROUP 2....................$ 47.43 25.25
GROUP 3....................$ 47.72 25.25
GROUP 4....................$ 47.86 25.25
GROUP 5....................$ 48.08 25.25
GROUP 6....................$ 48.19 25.25
GROUP 7....................$ 48.31 25.25
GROUP 8....................$ 48.48 25.25
GROUP 9....................$ 48.65 25.25
GROUP 10....................$ 49.65 25.25
GROUP 11....................$ 50.65 25.25
GROUP 12....................$ 51.65 25.25
GROUP 13....................$ 52.65 25.25
OPERATOR: Power Equipment (Tunnel Work)
GROUP 1....................$ 47.15 25.25
GROUP 2....................$ 47.93 25.25
GROUP 3....................$ 48.22 25.25
GROUP 4....................$ 48.39 25.25
GROUP 5....................$ 48.58 25.25
GROUP 6....................$ 48.69 25.25
GROUP 7....................$ 48.81 25.25
PREMIUM PAY:
$3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank operator);
Concrete mixer operator-skip type; Conveyor operator;
Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd.
without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground);
Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator;
Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).
GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types
- Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted);
Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator;
Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor;
Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types -drilling depth of 60' maximum); Elevating grader operator;
Grade checker; Gradall operator; Grouting machine operator;
Heavy-duty repairman; Heavy equipment robotics operator;
Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type);
Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu.
yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck);
Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self-propelled curb and gutter machine operator; Shuttle buggy;
Skiploader operator (crawler and wheel type over 1-1/2 yds.
up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull (compaction) operator
GROUP 9: Heavy Duty Repairman
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.