AIR NATIONAL GUARD
144TH FIGHTER WING
CALIFORNIA AIR NATIONAL GUARD
5323 McKinley Ave, Fresno, CA. 93727
REQUEST PROCUMENT ACTION
1 June 2017
MEMORANDUM FOR: 144MSG/LGC (SMSgt A. Olivas)
FROM: 144CES/CEC
SUBJECT: Request Procurement Action – Project No. HAYW172059
Buildings 100, 121, 125, 135, 2600, 2602, 2620, and 2640 – Install Surge Protective Device
1. The following documents/information are forwarded for procurement action
a. Statement of Work (SOW)
b. Independent Government Estimate (IGE)
2. Time of Completion for this Project: 30 Days
3. The following construction specialties will be involved in this project;
a. California class “B, C-10”
b. See CA State contractor license requirements for sub-contractor.
4. There is no government furnished equipment/materials involved in this project.
Signature Date
1164943123N Typewritten Text 3 August 2017
STATEMENT OF WORK
Buildings 100, 121, 125, 135, 2600, 2602, 2620, and 2640
Install Surge Protective Device (TVSS)
PROJECT NO.: HAYW172059
28 June 2017
144TH FIGHTER WING
CALIFORNIA AIR NATIONAL GUARD, FRESNO
TECHNICAL PROVISIONS
TABLE OF CONTENTS:
DESCRIPTION OF SERVICES
SITUS OF WORK
STATEMENT OF WORK
CONTRACTOR LICENSE REQUIREMENTS
PROJECT SPECIFIC REQUIREMENTS
GENERAL REQUIREMENTS
SUBMITTALS
CLOSEOUT DOCUMENTATION
DESCRIPTION OF SERVICES
This statement of work describes contractor requirements for the project titled “Buildings 100, 121, 125, 135, 2600, 2602, 2620, and 2640 Install Surge Protective Device (TVSS)”. All work will occur at the Fresno Air National Guard Station, Fresno, California. The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Statement of Work. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project. All information included in this document, along with the instructions and standards referenced in the document, should be considered as part of the Statement of Work.
SITUS OF WORK
All work will occur at the
Fresno Air National Guard Station 5323 McKinley Ave, Fresno, CA. 93727
STATEMENT OF WORK
1. Objectives: Surge Protection is required IAW NFPA 780.(T-0) Surge protective devices
(SPDs), formerly referred to as TVSS (transient voltage surge suppression),The purpose of this project is to protect equipment from transient voltages resulting from lightning and switching surges and protect the upstream distribution system from the rapid switching effects of electronics. SPDs are most effective when used in the form of tiered protection. Tiered protection means providing protection at main distribution panels, at secondary or sub-panels and at the equipment point of use. For protection of non-real property installed equipment, refer to the equipment manufacturers’ requirements for surge protection as specified..
2. Directions:
2.1. Complete all work according to AFI 32‐1065 (14 JUNE 2017).
2.2. Install 1 EA Surge protective device to building 100.
2.3. Install 1 EA Surge protective device to building 121
2.4. Install 1 EA Surge protective device to building 125
2.5. Install 1 EA Surge protective device to building 135
2.6. Install 1 EA Surge protective device to building 2600
2.7. Install 1 EA Surge protective device to building 2602
2.8. Install 1 EA Surge protective device to building 2620
2.9. Install 1 EA Surge protective device to building 2640
3. Demolition
3.1. Contractor must remove all materials completely off 144th FW property.
4. Finishing
4.1. General
4.1.1.
CONTRACTOR LICENSE REQUIREMENTS
1. The contractor will possess a valid California “B, C‐10” license and be able to provide proof of competence in the area of work. The contractor may self‐perform sections of the project.
2. All listed sub‐contractors working for the contractor will possess the applicable California Contractors license. Refer to the Project Specific Requirements section for the required license from the Contractor.
PROJECT SPECIFIC REQUIREMENTS
1. The contractor will possess a valid California “B, C‐10” license and be able to provide proof of competence in the area of interior remodels and masonry. The contractor may self‐ perform sections of the project.
2. All subcontractors working for the contractor will possess the applicable California Contractors license. For example, the contractor must be able to provide a Machinery contractor D‐21 licenses.
3. The project will be completed no later than 30 working days post Notice to Proceed (NTP).
Moving furniture and removal/replacement of wall hung items such as bulletin boards is the responsibility of the government. Cabinets and fixtures will remain in place during the project. The contractor and government will negotiate the final phasing (if applicable), and schedule during a review of the project at the pre‐construction conference.
4. Materials. The following lists out materials requirements for this project. Contractor may request substitutes for an approved equal during the pre‐construction conference. All substitution requests shall be made in writing on the AF Form 3000. Requests for material substitutions made after the pre‐construction conference may not be granted by the Government.
a. Surge Protection Devices
GENERAL REQUIREMENTS
1 When required, the Contractor will attend a Pre‐Construction Conference. The Pre‐ Construction Conference will generally be scheduled after award but prior to the NTP. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor will provide the following documents at the Pre‐ Construction Conference
a. Project Schedule
b. Contract Schedule of Values
c. Safety Plan
d. Quality Control Plan
e. Material Submittals
f. Material Safety Data Sheets
g. Draft DD 1354 – Final draft to be submitted at conclusion of project
2 Government Furnished Property and Services. The government will provide water, sewer and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing. Secured storage is the responsibility of the contractor.
3 Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Statement of Work and in accordance with all local, state and federal rules.
4 Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Statement of Work and in accordance with all local, state, and federal rules. The Project Manager will manage the Government’s QA program.
5 Hours of Operation. The hours of work shall be between 7:00 a.m. and 5:00 p.m. Monday through Friday unless otherwise prescribed by this statement of work. Work shall not be performed on Weekends and Federal Holidays without prior coordination from the Project Manager.
6 Base Access. Base security personnel require that all personnel entering the installation are cleared for access. The contractor will provide first name, last name, driver’s license number and applicable vehicle data for all personnel accessing the base. The contractor shall submit this information to the base Contracting Office NLT two working days prior to the date of required access. Personnel must maintain a valid driver’s license, vehicle registration and proof of insurance at all time while on the base.
7 The Contractor, and all listed sub‐contractors, must be licensed within the State of California. Refer to the Project Specific Requirements section for the required license from the Contractor.
8 Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.
9 Dimensions and Quantity. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.
10 Submittals. All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut‐sheet.
11 Warranty. The contractor shall guarantee all workmanship and materials covered under this statement of work for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this statement of work.
SUBMITTALS
All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut‐sheet.
CLOSEOUT DOCUMENTATION
10% Retainage will be released upon receipt of the following items:
Contractor workmanship letter of warranty up to one year.
Certificates of no debts to suppliers and vendors.
Electronic pictures showing the area before and after repair.
Recycling or Landfill proof of disposition document (if available).
All applicable O&M manuals.
Contractor Manpower Reporting The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data should be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/.
Unit Identification Code (UIC) for the Requiring Activity: FGW3CE
Issuing Office DoDAAC: W912LA