Attachment 6.pdf
PDF 14 KB Posted
- Solicitation number
- W912LA-10-R-0001
About this file
Addendum 3 to Plans and Specs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Attachment 5.pdf | ||
| Attachment 4.pdf | ||
| Amendment 2.pdf | ||
| Amendment 1.pdf | ||
| ATTACHMENT 1.pdf | ||
| ATTACHMENT 2.pdf | ||
| ATTACHMENT 3.doc | DOC document | |
| EXHIBIT A.doc | DOC document | |
| PH21442.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JFTB HANGAR 1 REPAIRS PHASE 2
ADDENDUM 3 – 12 MARCH 2010
CLARIFICATIONS
The relatively new fluorescent lights in the main hangar bay (located at level of the lower truss chords) are to remain. Older light fixtures shown in Phase 2 Addendum 1 Photos are to be demolished.
RFI’s
1.01 Q: Is there a conflict between Phase 2 Addendum 2 items 1.09 and 2.05b?
A: Yes delete item 2.05b. Parallel set of conduits are required for the 400 Hz Power.
1.02 Q: Drawing E-1 LIGHTING FIXTURE SCHEDULE TYPE BE400. This type of fixture is not available with an emergency pack as indicated. Please advise.
A: The fixture is available.
File details come from the government source that posted it. Updated .