About this file

Addendum 3 to Plans and Specs.

View the file

Other files

File Type Posted
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Attachment 5.pdf PDF
Attachment 4.pdf PDF
Amendment 2.pdf PDF
Amendment 1.pdf PDF
ATTACHMENT 1.pdf PDF
ATTACHMENT 2.pdf PDF
ATTACHMENT 3.doc DOC document
EXHIBIT A.doc DOC document
PH21442.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JFTB HANGAR 1 REPAIRS PHASE 2

ADDENDUM 3 – 12 MARCH 2010

CLARIFICATIONS

The relatively new fluorescent lights in the main hangar bay (located at level of the lower truss chords) are to remain. Older light fixtures shown in Phase 2 Addendum 1 Photos are to be demolished.

RFI’s

1.01 Q: Is there a conflict between Phase 2 Addendum 2 items 1.09 and 2.05b?

A: Yes delete item 2.05b. Parallel set of conduits are required for the 400 Hz Power.

1.02 Q: Drawing E-1 LIGHTING FIXTURE SCHEDULE TYPE BE400. This type of fixture is not available with an emergency pack as indicated. Please advise.

A: The fixture is available.