This is the rom layout where the caging will be placed. This is to give the vendor a heads up before they come to the site visit.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

DN

DN

DN

DN

FD

FD

D501-V

A322-V

D501-V

EXISTING CAGES TO REMAIN

12 12

12 12

OPEN TO BELOW

D501-V

D501-V

A322-V

A322-V

A322-V

GENERAL DEMOLITION NOTES

A. DEMOLITION SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK. WHERE SUCH DAMAGE

OCCURS, PATCH, REPAIR OR OTHERWISE RESTORE BUILDING TO IT'S ORIGINAL CONDITION.

B. SOLID LINES INDICATE EQUIPMENT AND/OR STRUCTURE TO REMAIN.

C. HEAVY DASHED LINES INDICATE EQUIPMENT AND/OR STRUCTURE TO BE REMOVED.

D. ALL ITEMS NOT SPECIFICALLY IDENTIFIED TO BE REMOVED THAT MUST BE DEMOLISHED TO ACCOMMODATE NEW

CONSTRUCTION SHALL BE REMOVED. VERIFY WITH ARCHITECT BEFORE PROCEEDING.

E. COORDINATE ALL DEMOLITION WORK WITH CORRESPONDING NEW CONSTRUCTION.

F. GENERAL CONTRACTOR TO COORDINATE CONSTRUCTION STAGING AND CLEANUP WITH OWNER TO MAXIMIZE

CLEANLINESS AND MINIMIZE DISRUPTION OF CORRIDORS, SIDEWALKS, BUILDING ENTRANCES AND DRIVEWAYS

THROUGHOUT JOB.

G. ALL ASSEMBLIES NOTED TO BE DEMOLISHED SHALL BE REMOVED COMPLETE WITH FASTENERS, ANCHORS, SEALANTS, CAULKING, ADHESIVES, ETC.

H. REMOVE ALL DEBRIS RESULTING FROM DEMOLITION FROM SITE. TRANSPORT AND LEGALLY DISPOSE OFF-SITE. REFER

TO SPECIFICATIONS. PROVIDE OWNER FIRST RIGHT OF REFUSAL.

I. CONTRACTOR SHALL FIELD VERIFY EXISTING CONSTRUCTION AND RELATED CONDITIONS PRIOR TO START OF WORK.

EXISTING BUILDING DRAWINGS CAN BE MADE AVAILABLE FOR CONTRACTOR REVIEW VIA ELECTRONIC FORMAT UPON

REQUEST.

J. CONSTRUCT DUST AND SOUND CONTROL BARRIERS PRIOR TO THE START OF WORK. COMPLY WITH IOSHA & LOCAL REQUIREMENTS FOR BRACING, SHORING, PUBLIC BARRICADES, ETC. - COORDINATE WITH OWNER.

K. ALL OPENINGS, VOIDS OR DAMAGED SURFACES CREATED BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, WINDOWS, ETC. SHALL BE PATCHED & REPAIRED TO MATCH SURROUNDING WORK.

L. CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS OF DEMOLITION, PUBLIC SAFETY AND WORK

RELATED TO SAFETY PROGRAMS THERETO.

Project Number

CERTIFIED BY

ISSUANCE INDEX

DATE:

PROJECT PHASE:

NOT F

OR C

ONSTRUCTIO

N

INDIANA NATIONAL

GUARD

/1

/2

:2

:2

A

M

D101-V

FIRST & SECOND FLOOR

DEMOLITION PLANS

2017.01350

08/16/2017

CD

VALPARAISO LATRINE

RENOVATION

1502 Linwood Ave Valparaiso, IN 46383

N

1/8" = 1'-0" D101-V

1 FIRST FLOOR DEMOLITION PLAN

1 REMOVE DOOR AND FRAME COMPLETE

2 REMOVE WALL COMPLETE

3 REMOVE 2ND FLOOR TILE FLOOR AND PORTION OF THICKSET GROUT

BED DOWN TO STABLE SUBSTRATE. REINFORCED STRUCTURAL SLAB

AND FLOOR JOISTS TO REMAIN IN THEIR ENTIRETY.

4 REMOVE WINDOW COMPLETE AND ASSOCIATED SILLS

5 REMOVE SEGMENT OF RAILING AS REQUIRED FOR NEW

CONSTRUCTION

6 REMOVE ALL TOILET PARTITIONS, CASEWORK, AND/OR TOILET

ACCESSORIES

7 SALVAGE ALL PLAQUES, BULLETIN BOARDS, SIGNAGE, AND/OR

ARTWORK AND RETURN TO OWNER

8 REMOVE PORTION OF LOAD-BEARING MASONRY WALL AS REQUIRED

FOR NEW DOOR OPENING; SEE STRUCTURAL

9 REMOVE PLUMBING FIXTURES COMPLETE, REFER TO MEP DRAWINGS

10 REMOVE THICK SET TILE FLOOR AND SLAB ON GRADE IN ITS ENTIRETY.

PREPARE FOR NEW CONSTRUCTION, SEE STRUCTURAL.

11 REMOVE SLAB ON GRADE IN ITS ENTIRETY. PREPARE FOR NEW

CONSTRUCTION. SEE STRUCTURAL.

12 REMOVE PORTION OF SLAB ON GRADE AS REQUIRED FOR NEW

CONSTRUCTION. COORDINATE WITH MEP DRAWINGS.

13 REMOVE CEILING IN ITS ENTIRETY

14 REMOVE COILING DOOR AND FRAME IN ITS ENTIRETY

15 SALVAGE ANY EQUIPMENT OR STORAGE SHELVING AND RETURN TO

OWNER

KEYED DEMO PLAN NOTES (NOTED WITH )1

N

1/8" = 1'-0" D101-V

2 SECOND FLOOR DEMOLITION PLAN

REVISION SCHEDULE

NO. DESCRIPTION DATE

FD

FD

FD

FD

FD

A301-V

A301-V

A301-V

A301-V

A401-V

MALE

LATRINE

G013

FITNESS

ROOM

G008

VAULT

G019

LOBBY

G016

DRILL FLOOR

G001

STAIR 2

G104

JANITOR

G002

MECHANICAL

G003

MAINT.

OFFICE

G005

KITCHEN

G006

EXT. ALCOVE

G004

A401-V

24' - 9" 12' - 0" 11' - 11"

M8M8

A301-V

A301-V

A301-V

A B C D

STORAGE

G017

FEMALE

LATRINE

G007

STAIR 1

G115

TOOTH-IN NEW

MASONRY TO MATCH

EXISTING MASONRY AT

EXISTING OPENING

BAG

STORAGE

G00988' LINEAL FEET OF NEW OCIE STORAGE

(APPROX 84' EXISTING)

A322-V

A322-V

A322-V

A322-V

M12

A401-V

A322-V

2/A701-V

STORAGE

G018

A

EXISTING CAGES TO REMAIN

A322-V

A322-V

A301-V

A301-V

A301-V

A301-V

OPEN TO BELOW

A401-V

FEMALE

LATRINE

MALE

LATRINE

LOBBY

STAIR 1

G115

SUPPLY

SERGEANT

READINESS

1ST

SERGEANT

COMMANDER

RECRUITING

DIST.

LEARNING

CLASSROOM

STORAGE

PSG OFFICE

STAIR 2

CORRIDOR

MEZZANINE

A301-V

A301-V

A301-V

A301-V

A B C D

G3S

G3S

G3S

JANITOR

A322-V

VCT EXIST

A322-V

A322-V

A322-V

Project Number

CERTIFIED BY

ISSUANCE INDEX

DATE:

PROJECT PHASE:

NOT F

OR C

ONSTRUCTIO

N

INDIANA NATIONAL

GUARD

/1

/2

:2

:2

A

M

A101-V

FIRST & SECOND FLOOR

PLANS

2017.01350

08/16/2017

CD

VALPARAISO LATRINE

RENOVATION

1502 Linwood Ave Valparaiso, IN 46383

N

1/8" = 1'-0" A101-V

1 BASE_01_FIRST LEVEL

KEYED FLOOR PLAN NOTES (NOTED WITH )1

1 LOCATION OF CANOPY ABOVE - REFER TO SHEET XXX

2 MOP SINK - REFER TO PLUMBING DRAWINGS

3 CASEWORK/COUNTERTOP - REFER TO A400 SHEETS

4 ADA ACCESSIBLE DRINKING FOUNTAIN

5 TILE SHOWER - REFER TO INTERIOR AND PLUMBING DRAWINGS

6 TWO-TIER LOCKER W/ INTEGRAL BENCH - REFER TO A400 AND A700

SHEETS

6A TWO-TIER LOCKER W/ ACCESSIBLE INTEGRAL BENCH - REFER TO

A400 AND A700 SHEETS

7 EQUIPMENT BY OTHERS

N

1/8" = 1'-0" A101-V

2 BASE_02_SECOND LEVEL

REVISION SCHEDULE

NO. DESCRIPTION DATE

Sheets
D101-V - FIRST & SECOND FLOOR DEMOLITION PLANS
A101-V - FIRST & SECOND FLOOR PLANS

File details come from the government source that posted it.