Valpo_Room_Layout.pdf
PDF 552 KB Posted
- Attached to
- Duffle Bag Caging
- Solicitation number
- W912L9-19-R-0025
About this file
This is the rom layout where the caging will be placed. This is to give the vendor a heads up before they come to the site visit.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
DN
DN
DN
DN
FD
FD
D501-V
A322-V
D501-V
EXISTING CAGES TO REMAIN
12 12
12 12
OPEN TO BELOW
D501-V
D501-V
A322-V
A322-V
A322-V
GENERAL DEMOLITION NOTES
A. DEMOLITION SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK. WHERE SUCH DAMAGE
OCCURS, PATCH, REPAIR OR OTHERWISE RESTORE BUILDING TO IT'S ORIGINAL CONDITION.
B. SOLID LINES INDICATE EQUIPMENT AND/OR STRUCTURE TO REMAIN.
C. HEAVY DASHED LINES INDICATE EQUIPMENT AND/OR STRUCTURE TO BE REMOVED.
D. ALL ITEMS NOT SPECIFICALLY IDENTIFIED TO BE REMOVED THAT MUST BE DEMOLISHED TO ACCOMMODATE NEW
CONSTRUCTION SHALL BE REMOVED. VERIFY WITH ARCHITECT BEFORE PROCEEDING.
E. COORDINATE ALL DEMOLITION WORK WITH CORRESPONDING NEW CONSTRUCTION.
F. GENERAL CONTRACTOR TO COORDINATE CONSTRUCTION STAGING AND CLEANUP WITH OWNER TO MAXIMIZE
CLEANLINESS AND MINIMIZE DISRUPTION OF CORRIDORS, SIDEWALKS, BUILDING ENTRANCES AND DRIVEWAYS
THROUGHOUT JOB.
G. ALL ASSEMBLIES NOTED TO BE DEMOLISHED SHALL BE REMOVED COMPLETE WITH FASTENERS, ANCHORS, SEALANTS, CAULKING, ADHESIVES, ETC.
H. REMOVE ALL DEBRIS RESULTING FROM DEMOLITION FROM SITE. TRANSPORT AND LEGALLY DISPOSE OFF-SITE. REFER
TO SPECIFICATIONS. PROVIDE OWNER FIRST RIGHT OF REFUSAL.
I. CONTRACTOR SHALL FIELD VERIFY EXISTING CONSTRUCTION AND RELATED CONDITIONS PRIOR TO START OF WORK.
EXISTING BUILDING DRAWINGS CAN BE MADE AVAILABLE FOR CONTRACTOR REVIEW VIA ELECTRONIC FORMAT UPON
REQUEST.
J. CONSTRUCT DUST AND SOUND CONTROL BARRIERS PRIOR TO THE START OF WORK. COMPLY WITH IOSHA & LOCAL REQUIREMENTS FOR BRACING, SHORING, PUBLIC BARRICADES, ETC. - COORDINATE WITH OWNER.
K. ALL OPENINGS, VOIDS OR DAMAGED SURFACES CREATED BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, WINDOWS, ETC. SHALL BE PATCHED & REPAIRED TO MATCH SURROUNDING WORK.
L. CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS OF DEMOLITION, PUBLIC SAFETY AND WORK
RELATED TO SAFETY PROGRAMS THERETO.
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
NOT F
OR C
ONSTRUCTIO
N
INDIANA NATIONAL
GUARD
/1
/2
:2
:2
A
M
D101-V
FIRST & SECOND FLOOR
DEMOLITION PLANS
2017.01350
08/16/2017
CD
VALPARAISO LATRINE
RENOVATION
1502 Linwood Ave Valparaiso, IN 46383
N
1/8" = 1'-0" D101-V
1 FIRST FLOOR DEMOLITION PLAN
1 REMOVE DOOR AND FRAME COMPLETE
2 REMOVE WALL COMPLETE
3 REMOVE 2ND FLOOR TILE FLOOR AND PORTION OF THICKSET GROUT
BED DOWN TO STABLE SUBSTRATE. REINFORCED STRUCTURAL SLAB
AND FLOOR JOISTS TO REMAIN IN THEIR ENTIRETY.
4 REMOVE WINDOW COMPLETE AND ASSOCIATED SILLS
5 REMOVE SEGMENT OF RAILING AS REQUIRED FOR NEW
CONSTRUCTION
6 REMOVE ALL TOILET PARTITIONS, CASEWORK, AND/OR TOILET
ACCESSORIES
7 SALVAGE ALL PLAQUES, BULLETIN BOARDS, SIGNAGE, AND/OR
ARTWORK AND RETURN TO OWNER
8 REMOVE PORTION OF LOAD-BEARING MASONRY WALL AS REQUIRED
FOR NEW DOOR OPENING; SEE STRUCTURAL
9 REMOVE PLUMBING FIXTURES COMPLETE, REFER TO MEP DRAWINGS
10 REMOVE THICK SET TILE FLOOR AND SLAB ON GRADE IN ITS ENTIRETY.
PREPARE FOR NEW CONSTRUCTION, SEE STRUCTURAL.
11 REMOVE SLAB ON GRADE IN ITS ENTIRETY. PREPARE FOR NEW
CONSTRUCTION. SEE STRUCTURAL.
12 REMOVE PORTION OF SLAB ON GRADE AS REQUIRED FOR NEW
CONSTRUCTION. COORDINATE WITH MEP DRAWINGS.
13 REMOVE CEILING IN ITS ENTIRETY
14 REMOVE COILING DOOR AND FRAME IN ITS ENTIRETY
15 SALVAGE ANY EQUIPMENT OR STORAGE SHELVING AND RETURN TO
OWNER
KEYED DEMO PLAN NOTES (NOTED WITH )1
N
1/8" = 1'-0" D101-V
2 SECOND FLOOR DEMOLITION PLAN
REVISION SCHEDULE
NO. DESCRIPTION DATE
FD
FD
FD
FD
FD
A301-V
A301-V
A301-V
A301-V
A401-V
MALE
LATRINE
G013
FITNESS
ROOM
G008
VAULT
G019
LOBBY
G016
DRILL FLOOR
G001
STAIR 2
G104
JANITOR
G002
MECHANICAL
G003
MAINT.
OFFICE
G005
KITCHEN
G006
EXT. ALCOVE
G004
A401-V
24' - 9" 12' - 0" 11' - 11"
M8M8
A301-V
A301-V
A301-V
A B C D
STORAGE
G017
FEMALE
LATRINE
G007
STAIR 1
G115
TOOTH-IN NEW
MASONRY TO MATCH
EXISTING MASONRY AT
EXISTING OPENING
BAG
STORAGE
G00988' LINEAL FEET OF NEW OCIE STORAGE
(APPROX 84' EXISTING)
A322-V
A322-V
A322-V
A322-V
M12
A401-V
A322-V
2/A701-V
STORAGE
G018
A
EXISTING CAGES TO REMAIN
A322-V
A322-V
A301-V
A301-V
A301-V
A301-V
OPEN TO BELOW
A401-V
FEMALE
LATRINE
MALE
LATRINE
LOBBY
STAIR 1
G115
SUPPLY
SERGEANT
READINESS
1ST
SERGEANT
COMMANDER
RECRUITING
DIST.
LEARNING
CLASSROOM
STORAGE
PSG OFFICE
STAIR 2
CORRIDOR
MEZZANINE
A301-V
A301-V
A301-V
A301-V
A B C D
G3S
G3S
G3S
JANITOR
A322-V
VCT EXIST
A322-V
A322-V
A322-V
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
NOT F
OR C
ONSTRUCTIO
N
INDIANA NATIONAL
GUARD
/1
/2
:2
:2
A
M
A101-V
FIRST & SECOND FLOOR
PLANS
2017.01350
08/16/2017
CD
VALPARAISO LATRINE
RENOVATION
1502 Linwood Ave Valparaiso, IN 46383
N
1/8" = 1'-0" A101-V
1 BASE_01_FIRST LEVEL
KEYED FLOOR PLAN NOTES (NOTED WITH )1
1 LOCATION OF CANOPY ABOVE - REFER TO SHEET XXX
2 MOP SINK - REFER TO PLUMBING DRAWINGS
3 CASEWORK/COUNTERTOP - REFER TO A400 SHEETS
4 ADA ACCESSIBLE DRINKING FOUNTAIN
5 TILE SHOWER - REFER TO INTERIOR AND PLUMBING DRAWINGS
6 TWO-TIER LOCKER W/ INTEGRAL BENCH - REFER TO A400 AND A700
SHEETS
6A TWO-TIER LOCKER W/ ACCESSIBLE INTEGRAL BENCH - REFER TO
A400 AND A700 SHEETS
7 EQUIPMENT BY OTHERS
N
1/8" = 1'-0" A101-V
2 BASE_02_SECOND LEVEL
REVISION SCHEDULE
NO. DESCRIPTION DATE
| Sheets |
| D101-V - FIRST & SECOND FLOOR DEMOLITION PLANS |
| A101-V - FIRST & SECOND FLOOR PLANS |
File details come from the government source that posted it.