CONSTRUCTION CONTRACT for Project PYKL162005 Repair Flightline Fire Hydrants at the 164th Airlift Wing, Memphis ANG Base, TN. Work shall be performed in accordance w ith (IAW) the plans and specif ications. This project is set aside for small businesses. The North American Industry Classif ication System (NAICS) Code is 237110 and the Small Business Size Standard is: $36,500,000.00 in average annual receipts for the past three years. Construction project magnitude is betw een $25,000.00 and $100,000. Persons intending to submit a proposal are strongly encouraged to attend the Pre-Proposal Conference and Site Visit. See Section 00100 for location and date.
KIRK A. MIDDLETON, II (901) 291-7108
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jul-2016
(RFP)
(IFB)
X
CALL:
Fire Hydrant Repair
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
164TH AW/CONTRACTING (FA6422)
4593 SWINNEA ROAD
MEMPHIS TN 38118-7101
W912L7
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
PYKL162005
8. ADDRESS OFFER TO (If Other Than Item 7)
901-291-7434FAX:TEL: 901-291-7108 TEL: FAX:
W912L7-16-R-0012 26
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912L7-16-R-0012
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair Flight Line Hydrant
FFP
Contractor to furnish all labor, material, tools, equipment, services, transportation, temporary equipment, structures, and payment of all cost incidental and necessary including all materials, labor, services, permits, licenses and taxes lawfully imposed to complete the work in every respect.
PYKL162005
Work Order # 201600169 Repair Flight Line Hydrant per attached PWS FOB: Destination
PURCHASE REQUEST NUMBER: F7YRRP6042A003
NET AMT
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442
SECTION 00010 -DELIVERY INFORMATION
SECTION 00100- INSTRUCTIONS TO OFFERORS, PERFORMANCE WORK STATEMENT
SECTION 00700- CONTRACT CLAUSES
SECTION 00800- SPECIAL CONTRACT REQUIRMENTS
See section 00100 Notes of Solicitation.
WAGE DETERMINATION(S) - to be inserted at award.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 120 dys. ADC 1 164 AW/ SRM/CE (F7YRRP)
2DLT MICHAEL TODD CUTLIFF
4593 SWINNEA ROAD
MEMPHIS TN 38118-7101
901-291-7540 FOB: Destination
F7YRRP
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE:
1.1. You are invited to submit a bid in response to our Request for Proposal (RFP) W912L7-16-R-0012 entitled Repair Flight Line Fire Hydrants, Project Number PYKL162005, at Memphis ANG Base, 4593 Swinnea Rd., Memphis, TN.
1.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible offeror whose bid, conforming to the request for proposal, will be most advantageous to the Government, considering lowest price technically acceptable (LPTA).
1.3. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE AND SITE VISIT:
2.1. A pre-proposal conference will be conducted on 10 August 2016 at 09:00 A.M. Central Standard Time for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at 164th Civil Engineering, Building 2884 Starlifter Lane located on Memphis ANG Base, Memphis, TN. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Kirk Middleton/Chris Rhyne at the following address:
usaf.tn.164-aw.mbx.msc@mail.mil
Firm Name and Telephone Number Visitor’s Name and Drivers License Number and State of Issue
2.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference.
This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.4. Visitors must arrive at the Installation’s Main Gate fourty-five (45) minutes prior to scheduled site visit in order to pick up their passes.. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.6. A record of the conference shall be made and furnished to all prospective offerors via email. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
3.1. Submit all questions in the format shown below by email to the contracting office at the addresses shown below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W912L7-16-R-0012 Email: usaf.tn.164-aw.mbx.msc@mail.mil
PRE-PROPOSAL INQUIRY FORMAT
Date of Offeror Inquiry: _______________ From: ______________________________ Company Name: ________________________________ Address:_____________________________________________________________________________ Phone Number: _____________________________ Fax Number:______________________________ Email address: ________________________________________________________________________ Offeror Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their proposal.
3.3. All questions and requests for information (RFI) must be received NOT LATER THAN 12 August 2016 9:00 AM CST prior to proposal due date. OFFERORS ARE STRONGLY ENCOURAGED TO
SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via email.
3.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective bidders.
4. AMENDMENTS PRIOR TO DATE SET FOR PROPOSALS: The right is reserved, as the interest of the Government may require, to revise or amend the solicitation, specifications and/or drawings, prior to the date set for proposals, as necessary. Such changes, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and other information applicable prior to the date set for receipt of proposal will be emailed.
5. WAGE DETERMINATION:
5.1. Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are. General Decision Number TN160103 Building, dated 05/13/2016.
Applicable wage rates can be found at Applicable wage rates can be found at http://www.wdol.gov/dba.aspx
6. PROPOSAL PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This RFP does not commit the Government to pay costs incurred in preparation and submission of proposals or for other costs incurred prior to award of a formal contract.
7. Submission Instructions:
a. DUE DATE: 17 August 2016 no later than 01:00 p.m., Central Standard Time
b. Quote may be emailed (usaf.tn.164-aw.mbx.msc@mail.mil );
or submitted by common carrier; (USPS, UPS, FEDEX, DHL, etc.) to the address located in block 7 of SF1442
8. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES: Reference information found at Section 00700 FAR Provision/Clause 52.236-14, Availability and Use of Utility Services consideration when computing its offer.
9. CLAUSES:
9.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
9.2. Clauses and provisions in this document may not appear in consecutive order.
9.3. REMOVAL OF SECTIONS AT TIME OF AWARD: Sections 00100 and 00600 will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
10. DISPOSITION OF UNSUCCESSFUL PROPOSALS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals.
The Government will destroy extra copies of unsuccessful bids. No destruction certificate will be provided.
11. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
12. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
13. All information relating to this RFP, including pertinent changes/amendments and information will be provided via email.
14. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site. You will need your DUNS number and MPIN in order to log in to the Online Representations and Certifications Application (ORCA) website. The solicitation and associated information and the plans and specifications will be made available only from the Contracting Officer or Engineers.
15. A complete proposal package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00010 Line Items- all items must be priced
(c) Representations and Certifications, completed and return only additional certifications found in this section. In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications (ORCA), is http://orca.bpn.gov.
(d) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
One copy of the SF1442 is required to have an original signature.
(e) All amendments to the solicitation must be acknowledged.
16. A single award is contemplated. Prospective bidders must bid on all items to be considered for award.
PERFORMANCE WORK STATEMENT
1.0 GENERAL
This project consists of furnishing all labor, materials, tools, and equipment necessary to complete Project PYKL162005, Flight line Hydrant Repair. The project includes inspecting all fire hydrants and their utility systems contained within the military aircraft apron, repair/replace non-operational or faulty hydrants, identified by numerical markings, and correct issues discovered during inspection, and then verify fire hydrant system for entire military aircraft apron are operating to correct specifications and requirements.
Deliverables:
1.1 PERFORMANCE PERIOD
The period of performance for this project is 120 calendar days.
1.2 PROJECT DESCRIPTION
PROJECT Number: PYKL162005 Project Name: Flight line Hydrant Repair
1.3 REFERENCES:
In general, all technical specifications are provided within the Construction Documents. However, in the event any project element is not covered in the specifications provided, the Contractor should refer to the Specification Hierarchy for direction related to the element.
1.3.1 Specification Hierarchy
The specification hierarchy is the collection of technical specifications to be used for all projects. The Contractor should refer to the specifications provided in the Construction Documents first before moving to the next technical specification listed in the specification hierarchy. The hierarchy is listed in the order of precedence (i.e. “A” supersedes “B”, “B” supersedes “C”, etc.).
The hierarchy is as follows:
A. Any Specifications provided with Construction Documents.
B. Base Standard Specifications.
C. MATOC Default Specifications.
2.0 GENERAL REQUIREMENTS FOR ALL WORK
2.1 DESCRIPTION OF WORK
2.1.1 Area of Work: The Contractor will be allowed a reasonable working area at all times. The Contractor will confine operations, including material storage, to the area of work indicated by the Contracting Officer.
2.1.2 Regulations: The Contractor will comply with all applicable local, state, federal, and Air National Guard regulations pertaining to safety, traffic control, fire prevention, and environmental protection.
2.1.3 Working Hours: The Contractor's working hours will be between 7:00 a.m. and 4:15
Performance Objective (The Service required— usually a will statement)
PWS
Paragraph
Performance Threshold
Deliverable completed
Training 3.1 Contractor will provide all system training as specified 98% of requirements must be met.
Monthly or as needed
Testing 3.2 Contractor will provide all testing requirements specified 98% of requirements must be met.
Monthly or as needed
Progress Schedule 3.3 Contractor will provide Progress Schedule by direction of Contracting Officer not to exceed ten (10) days after contract award.
Monthly or as needed
Maintenance Plan 3.4 Contractor will provide maintenance plan as specified 99% of requirements must be met
Monthly or as needed
Construction Performance 3.5 Contractor will perform construction by regulation and acceptable standards 98% of the time.
Monthly or as needed.
Documentation 3.6
1413, 1354, 1477, payment Schedule, Bonds, Submittals, payment, Contractor will provide warranties on system and replacement parts, and repairs as specified with specified 99% of requirements being met
Month or as needed p.m., with no work scheduled on weekends or Federal holidays. Permission to work at times other than those stated above must be obtained from the Contracting Officer at least 5 working days in advance.
2.1.4 Material Storage: The Contractor's material and equipment storage site will be approved by the Contracting Officer, coordinated through the Contracting Officer’s Representative (COR) and will be kept orderly and free of litter.
2.1.5 SIGNAGE: The Contractor will erect a project sign with his name, address and phone numbers in his area. The sign will include the project name, the name and logo of the Tennessee Air National Guard along with the design Architect/Engineer. The Contractor is required to establish and maintain DAVIS BACON signage in conformance with requirements for every project.
2.2 VERIFICATION OF DIMENSIONS and SITE CONDITIONS
The Contractor will be responsible for the proper coordination and proper relation of the work required.
The Contractor will field verify all dimensions and advise the Contracting Officer of any discrepancies prior to proceeding with that phase of the work. The Contractor is required to temporarily stop work for any and all site review and approval of direction in the event of any and all unforeseen conditions.
ONLY the Contracting Officer can approve time and additional work. In the event there is adequate time to perform the extra work at the time the UNFORSEEN work is approved no additional time will be awarded; approved by contracting “officer only. Where exact locations are not given for the positioning of equipment/devices, positioning to permit easy access for maintenance, removal and replacement of component parts are required.
Information from the base, the COR and architect and engineering firm may be solicited to maintain conformity with government needs. Final placement will be verified by the Contracting Officer prior to anchoring equipment in place.
2.3 UTILITIES
2.3.1 Amounts: The Contractor may use reasonably required amounts of electricity and water from existing outlets and lines without charge. Contractor may also access site sanitary sewer, with approval through the COR, and if Contractor so desires. Telephone services will be the responsibility of the contractor: services arranged and paid for, in their entirety, by the Contractor.
2.3.2 Maintenance: The Contractor will be responsible for installing and maintaining temporary cords, lines or other equipment in a safe and clean condition.
2.3.3 Fire Hydrant Connections: Only compatible adapters will be utilized for hydrant connections. A hydrant wrench of the correct size is required to be used. The Contractor will install a separate valve on the hydrant for control of water. Temporary connections to fire hydrants will be disconnected at the end of each working day. Connection is required to include backflow protection.
Notify the COR and Base Fire Department prior to connection.
2.3.4 Removal: Prior to final acceptance, all temporary cords, lines or other equipment will be removed and the existing outlets and lines restored to the condition existing prior to the start of construction.
2.4 OUTAGES: Any utility outages necessitated by the work will be requested in writing at least five (5) working days prior to the proposed outage. The request will be directed to the Contracting Officer and will stipulate the specific utility system to be affected and the time duration anticipated. A complete schedule of the work will be presented by the Contractor and reviewed by the Contracting Officer. All outages require syncing with base schedules to minimize negative effects.
2.5 SALVAGEABLE ITEMS: Project Signs removed during or after construction will be salvaged: contact COR for coordination. Signs are required new if no salvage signs are available.
Notification through COR and base prior to opening or closing roads to traffic: signage for direction, alternative parking areas, and detours are required for all road work (see section 2.8). Availability of salvage item(s) requested by submittal and approved by Contracting Officer. All other equipment, systems and materials noted to be salvaged and to be delivered to an on base location designated by the Contracting Officer and organized through the COR.
2.6 PROJECT CLEAN-UP: The Contractor is responsible to maintain the construction site in a clean and orderly condition from the start of the project to completion. Daily clean-up is mandatory.
The Contractor shall provide the construction site, during the work day, with minimal to no Foreign Object Debris (FOD), due to the severity of the work location in and around aircraft. The Contractor shall have a dumpster at a pre-destination site for disposal of debris and will arrange for transport of dumpster(s) and debris to and from the base. Failure of the Contractor to maintain the project site and work areas free of debris and excess materials, will result with the immediate cessation of all construction and related activities until such time as the Contracting Officer has determined that adequate clean-up has occurred.
2.7 PARKING: Parking of the Contractor's vehicles will be restricted to the area as determined at the Pre-Construction meeting and shown on the site plans. The company name will be prominently displayed on all construction vehicles parked in the designated spaces unless prior approval through COR is received. Construction trailers require 5 day preapproval.
2.8 TRAFFIC CONTROL DEVICES: Contractor will comply with CFR Title 49 Transportation. When the contract will affect road closures or lane closures, the Contractor will contact the COR for traffic coordination with security and base safety then provide written submittal at least 5 days prior to needing the traffic pattern to change, to the Contracting Officer.
2.9 Drawings and Specifications: Contain Project details of work required.
3.0 Deliverables
3.1 Training: Familiarization training with project equipment and its abilities.
3.2 Testing: Contractor will submit test results in both paper and electronic format for approval.
The contractor will accompany the Base Civil Engineer or their designated representatives and the COR on an inspection of the work. The system will be visually inspected for workmanship, damage, construction flaws, and defects and to ensure all components are properly marked and identified. The installer will correct all deficiencies noted during the inspection in accordance with the terms of the contract. For fiber optic cabling, optical time domain reflectometer traces are required with end-to-end attenuation. The contractor will furnish the manufacturer, model number, and date of calibration for all test equipment used on the job site to perform testing. Contractor will submit all test results identified in the Architect and Engineering documents to the COR and Contracting Officer timely and with acceptable test results. Submit test results in both paper and electronic format. Submit two papers and one electronic copy, either in Adobe® Portable Document Format or Microsoft® Word format, of test results to the contracting officer.
3.3 Progress Schedules: Required for all construction projects with a performance period of 30 days or longer.
3.3.1 Contractor's proposed schedule (AF Form 3064), prepared by the Contractor and submitted through the Base Civil Engineer/Facilities Management (BCE/FMO) to the Contracting Officer, must be accomplished within ten (10) days after award. The Progress Schedule will indicate the order in which the Contractor proposes to perform the work, the date which work will begin, and date of anticipated completion. The AF Form 3064 must continue through the entire contract period, even if earlier completion is anticipated.
3.3.2 The schedule shall begin in the form of a Progress Chart of suitable scale to indicate appropriately the percentage of work scheduled for completion at any time.
3.3.3 In the event of differing site conditions, change in specifications, additional work, etc., which would require a time extension in excess of 60 calendar days, a revised schedule is to be prepared. The revised schedule will reflect work completed up to the date of revision, the percentages adjusted accordingly, and performance time extended to the new completion date established by a Modification (MOD) to the contract as a result of the change.
3.3.4 The initial and revised schedules will include time for a final inspection and correction of any punch list items, which might be discovered during the final inspection.
3.3.5 AF Form 3064, Contract Progress Schedule and AF Form 3065, Contract Progress Report, will be used to satisfy the requirements of FAR 52.236-15, "Schedules for Construction Contracts". The Contractor's proposed progress schedule shall be submitted in a minimum of three copies. After review by the BCE/FMO, and approval by the Contracting officer, distribution will be made as follows:
3.3.5.1 Original will be maintained within the Contracting office.
3.3.5.2 Signed copy maintained by the BCE/FMO.
3.3.5.3 Signed copy maintained by the Contractor.
3.3.6 Instructions concerning the use of the AF Form 3064, Contract Progress Schedule, are on the reverse of the form. Additional instructions are as follows:
3.3.6.1 Block 2 - will be the actual date that the contract performance period begins as determined by receipt of the Notice to Proceed.
3.3.6.2 Block 3 - will be the completion date established by the contract terms.
3.3.6.3 Block 6 - will be the date Contractor physically starts work under the contract.
3.3.6.4 Block 7 - self-explanatory (cannot be completed until work is completed).
3.3.6.5 Column B - "Work Elements" must be in sufficient detail to identify all elements of work required to complete the project. Work elements must be limited to those tasks, which indicate progress and which can be readily identified and measured by the Government inspector. These elements of work shall correspond with the elements of work shown on the AF Form 3065, Contract Progress Report. Some contracts will require supplies /services with very long lead times. While this delivery time is included in the construction period, it can have an impact on the performance. Long lead-time is relative to available performance period and the critical path of work.
3.3.6.6 Dates entered above columns D through Q will be the ending date for the period covered by each column. Each column will represent the performance period covered by each AF Form 3065, Contract Progress Report. Since AF Form 3065's are required semi-monthly, these dates will be the 15th or the last day of the month.
3.3.6.7 The top half of the space under each column will be used by the Contractor to show the percentage of each work element that will be accomplished during that period. The percentage contained in Column D through Q for each work element must equal the percentage in Column C. Each column will be totaled and the total entered in the top half of line 16. The totals of Column D through Q on line 16 must equal 100%.
3.3.6.8 Starting on line number 16, on the extreme right hand side of the form, number upward from 0 to 100 as follows: line 15 in "0", line 14 is "10", line 13 is "20", etc.
3.3.6.9 Beginning at the lower left corner of line 15, column D, the Contractor will graph his proposed progress, using a broken line.
3.4 Maintenance Plan: Contractor will submit a maintenance plan as specified. The contractor will perform daily area cleanup at all equipment upgrade/installation locations until completion of work at each site. The contractor will remove all excess debris (boxes, wrapping, cables, etc.) and return facilities to previous condition once all upgrade/install actions are complete. The contractor will repair and/or replace all facilities and/or equipment damaged by the contractor or their subcontractors and warranty said facilities and/or equipment for the specified warranty period of new equipment of like kind, but for no less than one year. All affected areas will be restored to their original condition.
Contractor will submit a maintenance plan for the equipment and address interconnection of equipment due to heat, moisture, and routine maintenance as it applies and the maintenance required for equipment items. The contractor will furnish the manufacturer, model number, and date of calibration for all equipment used installed, repaired, or updated by contractor.
3.5 Construction Performance: Contractor will perform Flight Line Hydrant Repair specified in Solicitation, Contract, Performance Work Statement, Specifications, and Drawings to an acceptable quality level of ninety-eight (98) percent.
3.5.1 Contractor shall ensure 164 AW owned fire hydrants around the military aircraft apron area are functioning to operational status. Hydrants are numerically numbered and marked. Construction Performance includes but is not limited to:
3.5.1.1 Contractor will repair/replace three (3) hydrants, numbered 18,19, and 26, cross-threaded on right 2 1/2 outlet, and one (1) hydrant, numbered 20, with 2 1/2 cap on right outlet cannot be removed because of sleeve spins with cap.
3.5.1.2 Contractor will repair and/or replace one (1) hydrant, number 25, leaks from the top of the cap, and for one (1) hydrant, number 24, water rises from underneath asphalt when system is engaged.
3.5.1.3 Contractor will replace entire one (1) hydrant, numbered 22.
3.5.1.4 Find and repair the reoccurring leak on one (1) hydrant, numbered 32.
3.5.1.5 Static and Residual test all hydrants and provide documentation.
3.5.2 Contractor shall test, inspect, and document the closeout test results of all 164 AW owned fire hydrants located on or around the military aircraft apron area.
3.5.3 The contractor shall ensure any hydrants that were replaced are the same threading, type, color and functionality of the exiting 164 AW owed hydrants.
3.5.4 Contractor shall provide submittals on all equipment to be purchased / installed for approval, along with any value engineering that may be obtained.
3.6 Documentation: Contractor will provide accurate, complete documentation for this contract 99% of time. In the event of errors, the contractor will provide corrections timely.
3.5.1 Bonds
3.5.2 1413e Subcontractor
3.5.3 1354 real estate form
3.5.4 1477 or approved daily schedule
3.5.5 Payment Schedule
3.5.6 Submittals, payment
3.5.7 Test Results
3.5.8 RFI
3.5.9 Warranty and Closing documentation. Contractor will warranty system for at least One
Year to include replacement parts, and repairs as specified in clause(s) 52.246-19 and by Contracting Officer. The contractor will repair and/or replace all facilities and/or equipment damaged by the contractor or their subcontractors and warranty said facilities and/or equipment for the standard warranty period of new equipment of like kind, but for no less than one year. All affected areas will be restored to their original condition.
3.5.10 Meeting Notes for project
The Contractor will comply with the Computer Security Act of 1987 and all DOD and AF requirements for access to Sensitive, But Unclassified Information. The Contractor is responsible for providing properly cleared personnel, providing security briefings, and ensuring compliance by its employees with the Government or Contractor security regulations. This includes the safekeeping, wearing, and visibility of a Contractor provided picture name badge, and any special agency badges clearly identifying the person as a contractor. The contractor will ensure the return of all badges, and any other Government property, upon task completion, or when personnel depart a task. The contractor will coordinate with the contracting officer on all security issues and to gain access to the base and all areas necessary to execute this project.
The contractor will provide the necessary security clearance information to the site contracting officer no later than two weeks prior to installation commencement for contractor personnel being granted access to any work locations. All contracted personnel will comply with established security procedures for entering an installation and its facilities, including special security procedures for entry to restricted or controlled areas. The Government reserves the right to refuse entry to any individual at any work location.
Contractor Manpower Reporting (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for AIR FORCE collection site. The contractor is required to completely fill in all required data fields using the following web ad-dress: http://www.ecmra.mil/ .
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/ .
Quality Assurance Surveillance Plan (FAR 46)
The role of a Trusted Agent (TA) and Contracting Officer’s Representative (COR), assumes Quality Assurance duties. The COR monitors contractor performance, completes and signs that the Quality Assurance Worksheets provided below are correct and within the contract requirements. CORs are encouraged to submit the worksheet more frequently if needed. This worksheet strives to be compliant with the Contract and regulatory requirements to ensure adequate oversight is being performed. VCE-COR has more information on oversight.
The COR is required to annotate the Quality of work performed by the Contractor and subcontractors for the work associated in this award.
Quality Assurance Plan Worksheets are to be sent directly to the COR and Administering Contracting Office.
The COR will assume a quality performance rating of “Green” on all measured deliverables unless otherwise notified.
The quality rating may change from “Green” to “Red” without notice; however, we encourage the COR to utilize “Yellow” quality rating to alert the contracting office of quality issues that have the potential for a “Red” quality rating if corrective action is not taken.
Any time a rating is less than “Green,” the COR must clearly document the worksheet to indicate what did or did not occur per the PWS requirement. When an observation indicates other than a “Green” rating, the COR may require the Contractor to initial understanding of the COR’s observation. Initialing the observation does not constitute concurrence with the observation; it only acknowledges that the contract employee is made aware of the defective performance. If the Contractor’s response to an identified quality deficiency is unsatisfactory, the Contracting Officer or COR will contact the Contractor (company) to implement a plan of action to remedy the identified deficiencies.
The COR for this PWS is: 2nd Lt Michael Cutliff, email address is michael.t.cutliff.mil@mail.mil, and the commercial telephone number is 901-291-7479.
POC for Contracting for this PWS is: SMSgt Chris Rhyne, email address:
christopher.d.rhyne.mil@mail.mil and commercial telephone number 901-291-7109.
Quality Assurance Surveillance Plan (QASP):
Rating Description Green Yes, performance and technical specifications are being met at AQL and timely.
Yellow Yes, performance and technical specifications are currently being met at the minimum
AQL, but the following construction services / deliverable requires contractor attention.
Red No, performance and technical specifications are not being met at AQL and the following construction services / deliverable needs immediate contractor resolution.
Performance Objective
(The Service required— usually a will statement)
PWS
Paragraph
Performance Threshold
Deliverable Completed
Acceptable Quality Level
(AQL)
COLOR
Performance Objective
(The Service required— usually a will statement)
PWS
Paragraph
Training 3.1 Contractor will provide all system training as specified 98% of requirements must be met.
Monthly or As Needed
Green Yellow
Requires Comments
Red Requires
Comments
Testing 3.2 Contractor will provide all testing requirements specified 98% of requirements must be met.
Monthly or As Needed
Green Yellow
Requires Comments
Red
Progress Schedules
3.3
Contractor will provide Progress Schedule by direction of Contracting Officer not to exceed ten(10) days after contract award.3….
Monthly or As Needed
Green Yellow
Requires Comments
Red
Maintenance Plan
3.4 Contractor will provide maintenance plan as specified 99% of requirements must be met
Monthly or As Needed
Green Yellow
Requires Comments
Red
Construction Performance
3.5
Contractor will perform construction by regulation and acceptable standards 98% of the time.
Monthly or As Needed
Green Yellow
Requires Comments
Red
Documentation 3.6
Contractor will provide accurate documentation 99% of the time.
Contractor will provide warranties on system and replacement parts, and repairs as specified with specified 99% of requirements being met.
Monthly or As Needed
Green Yellow
Requires Comments
Red
YELLOW AND OR RED COMMENTS:
Attachments: Yes or No (Choose One)
BCE acknowledgement of yellow and red concerns:
Mont
Contract N Task Order Contractor Period of P NTP Date:
POP Start POP End D
COR Nam COR Signa
LOCATIO
END OF P
thly or
Number:______ r Number: ___ r: ___________ Performance:__ Date:________
Date:________ me:______ ature:
ON: _________
PERFORMAN
As Needed (C
NCE WORK
Choose one) RE
STATEMENT
EVIEW for:
T
W912L7-16-R
R-0012
Section 00700 - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.212-5 Contract Terms and Conditions Required to Implement
Statutes or Executive Orders--Commercial Items
JUN 2016
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method)
MAY 2014
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-5 Alt I Pollution Prevention and Right-to-Know Information (May
2011) Alternate I
MAY 2011
52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.225-9 Buy American--Construction Materials MAY 2014 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.228-11 Pledges Of Assets JAN 2012 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.243-5 Changes and Changed Conditions APR 1984 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Within the continuum, the Government will employ a “Lowest Price Technically Acceptable FAR 15.101‐2” analysis of cost or price and non-cost factors in evaluating the proposals submitted. Evaluation of technical factors shall be on an acceptable/unacceptable basis. All factors are required to achieve an acceptable rating to be considered technically acceptable.
The following factors shall be used to evaluate quotes:
Factor 1 – Technical Capability
Sub-Factor 1: Ability to install/repair water main, 6” or larger Sub-Factor 2: Ability to inspect/evaluate/troubleshoot fire hydrants Sub-Factor 3: Ability to complete the project within the specified timeframe
Technical Capability Evaluation Ratings
Acceptable The quote clearly meets the minimum requirements of the RFP.
Unacceptable The quote does not clearly meet the minimum requirements of the RFP.
Factor 2 – Past Performance
The past performance evaluation results is an assessment of the quoter’s probability of meeting the minimum past performance that pertain to the products and/or services outlined in the solicitation requirements. The Government may use Contractor Performance Assessment Reporting System (CPARS), information in the quoter’s quote, and information obtained from other sources.
Past Performance Evaluation Ratings
Acceptable Based on the quoter’s performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter’s performance record is unknown.
Unacceptable Based on the quoter’s performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort.
Factor 3 – Price
The purpose of the price evaluation is to determine whether a quoter’s proposed prices for the service are realistic, complete and reflect an understanding of solicitation requirements, and to provide an assessment of the reasonableness of the proposed price. The Contracting Officer shall ultimately make any subsequent award to the quoter whose quote is determined to represent the Lowest Price Technically Acceptable.
Technical and past performance, when combined, are equal to price.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful quoter within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.
Material Identification No.
(If none, insert "None")
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items.
Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling,…