AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this Amendment 0005 is to provide a revised Performance Work Statement (PWS).
The proposals are due by or before June 4, 2020 at 2:00 P.M.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L620R0008
X 9B. DATED (SEE ITEM 11)
20-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-May-2020
CODE
USPFO OK PURCHASING & CONTRACTING
3501 MILITARY CIRCLE
OKLAHOMA CITY OK 7111-4398
W912L6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912L620R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR
Portable Latrines, Hand Washing Stations, Packaged Ice, Roll-Off Dumpsters, and Refrigeration Trailer Services
1.0 General:
1.1 Scope: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Portable Latrines, Hand Washing Stations, Packaged Ice, Roll-Off Dumpsters and Refrigeration Trailer Services, as defined in this PWS.
1.2 Background: The Oklahoma Army National Guard (OKARNG) has a requirement for portable latrines, hand washing stations, packaged ice, roll-off dumpsters and refrigeration trailers with 24 hour access and support located at Fort Chaffee Arkansas.
1.3 Period of Performance (PoP): The Period of Performance shall be from July 23, 2020, through August 09, 2020.
1.4 General Information:
1.4.1 Quality Control (QC): The Contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the Contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 5 days after contract award. After acceptance of the QCP, the Contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.2 Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.3 Place and Performance of Services: The Contractor shall provide services 24 hours a day for the entirety of the PoP except when the Government installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
Performance shall be at Fort Chaffee, AR. The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.3.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. The Contractor may not be compensated for unexpected closures or delays. Vehicles operated by the Contractor’s personnel are subject to search pursuant to applicable regulations. All vehicles must be driven by an appropriately licensed individual per state licensing requirements and vehicle will have proof of insurance appropriate to state insurance requirements. Any moving violation of any applicable motor vehicle regulation may result in the termination of that person’s installation driving privileges.
1.4.3.3 The Contractor’s employees shall become familiar with and obey the regulations of the installation; including but not limited to fire, traffic, safety and security regulations while on the installation.
The Contractor’s employees shall only enter restricted areas when required to do so and only upon prior approval. All Contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The Contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor’s employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.4 Security Requirements. The Contractor shall comply with all applicable installation/facility access and local security policies and procedures, which will be furnished upon request. The Contractor and all associated sub-Contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The Contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in Contractor security matters or processes.
1.4.4.1 The Contractor and all associated sub-Contractor’s employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a government representative).
1.4.4.2 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the Contractor is advised that any time the Contractor’s personnel place or receive a call they are subject to COMSEC procedures. The Contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information.
The Contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5 Physical Security. The Contractor shall safeguard all Government property provided for the Contractor’s use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.5.1 Lock Combinations: The Contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
1.4.6 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor’s performance. At these meetings, the KO will apprise the Contractor of how the Government views the Contractor’s performance and the Contractor shall apprise the Government of problems, if any, being experienced. The Contractor shall resolve outstanding issues raised by the Government. The Contractor’s attendance at these meetings shall be at no additional cost to the Government.
1.4.7 Contract Manager (CM): The Contractor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the Contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services.
The CM shall ensure that the Contractor’s employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure the Contractor’s employees understand that services performed outside the scope of the contract are performed wholly at the expense of the Contractor.
1.4.8 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. The Contractor and its employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The Contractor shall take appropriate action, up to and including termination, against employees or sub-Contractor’s that violate the US Government policy as described at FAR 22.17.
1.4.9 Organizational Conflicts of Interest (OCI): The Contractor and sub-Contractor’s personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g. cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor the Contractor’s performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of the Contractor’s performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Sub-Contractor: One that enters into a contract with a Prime Contractor. The Government does not have privy of contract with the sub-Contractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager CMRA Contractor Manpower Reporting Application COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PWS Performance Work Statement QA Quality Assurance
QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: None.
3.2 Materials: None.
3.3 Equipment: None.
3.4 Services: None.
3.5 Utilities:
3.5.1 Potable and Non-potable Water: Refill may be available to the Contractor through coordination with the COR.
3.5.2 Waste Disposal: The water treatment plant at Fort Chaffee may be available to the Contractor through coordination with the COR. The Contractor will be responsible for discharge hoses of sufficient length to release waste water into the water treatment plant site being utilized.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the Contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements: The Contractor shall:
5.1 Portable Latrines and Hand Washing Stations:
5.1.1 Provide and place enough self-contained portable latrines and hand washing stations to support 3000 personnel in a field environment with 24 hour accessibility at Fort Chaffee, AR. Placement and quantity will be approved by OKARNG.
5.1.1.1 Place all portable latrines and hand washing stations no later than 23 July 2020.
5.1.1.2 The Contractor will be provided grid coordinate locations from the COR no later than 20 days prior to placement.
5.1.1.3 The Contractor will survey the placement sites, in person at Fort Chaffee with the COR and BDE S4 prior to placement. This needs to be coordinated, scheduled and conducted with the COR no later than two weeks prior to placement.
5.1.2 Keep all portable latrines and handwashing stations stocked with all goods and products necessary for their use for the entirety of the Period of Performance.
5.1.3 Maintain all portable latrines and handwashing stations in a sanitary and fully operable condition.
5.1.4 Provide periodic cleaning of the portable latrines and handwashing stations to maintain a clean appearance free of dirt, trash or debris from 30 July 2020 to 09 Aug 2020.
5.1.5 Provide periodic dumping and refilling of the portable latrines and hand washing stations to maintain them in a sanitary and usable condition in accordance with the QASP.
5.1.5.1 Dispose of all waste water into approved water treatment plant at Fort Chaffee or at another appropriate facility.
5.1.6 Provide an on-site team at Ft. Chaffee for the entirety of the Period of Performance with the ability to move, service and assist the unit with all portable latrines and handwashing stations.
5.1.6.1 This team will be available for use on-site 24/7.
5.1.6.2 The Contractor is responsible for providing all food, water, incidentals, lodging, equipment and any items the team may need to perform the tasks of servicing and moving the portable latrines and hand washing stations.
5.1.7 Only move the portable latrines and/or handwashing stations with approval of the COR.
5.2 Packaged Ice:
5.2.1 Provide and deliver 300,000 pounds of packaged ice to Fort Chaffee, AR.
5.2.1.1 Deliveries will be every other day starting after the first delivery with a total of ten deliveries of 30,000 pounds of ice.
5.2.1.2 The Contractor will be provided final schedule for delivery no later than 30 days prior to the first delivery.
5.2.2 Transfer ice from their container into the cold storage or refrigeration trailer determined by the COR.
5.2.3 Notify COR immediately of any delays or issues with any delivery.
5.3 Roll-off Dumpsters:
5.3.1 Provide and place six 30 yard roll-off dumpsters to Fort Chaffee, AR with 24/7 access and use through the entirety of the Period of Performance.
5.3.2 Provide the ability to move and/or dump the 30 yard roll-off dumpster within 8 hours of request.
5.3.3 Only relocate the roll-off dumpsters with approval of the COR.
5.3.4 Maintain the roll-off dumpsters in a fully operable condition for the entirety of the Period of Performance.
5.4 Refrigeration Trailer:
5.4.1 Provide and place two 53 foot refrigeration trailers with 24/7 access and use throughout the entirety of the Period of Performance.
5.4.1.1 Deliver the refrigeration trailers with a full tank of fuel.
5.4.2 Train four service members (two per trailer), designated by the COR, on how to operate the refrigeration trailers. The Contractor will be responsible for maintenance during the Period of Performance.
5.4.3 Maintain the refrigeration trailer in a fully operable condition for the entirety of the Period of Performance.
5.4.4 Provide the ability to move the refrigeration trailer within 8 hours of request.
5.4.4.1 Request will only be made by the COR.
5.5 The Contractor Manpower Reporting Application (CMRA):
5.5.1 The Contractor shall report ALL contracted labor hours (including sub-Contractor labor hours) required for performance of services provided under this contract for the National Guard Bureau OKARNG via a secure data collection site.
5.5.2 The Contractor shall completely fill in all required data fields using the following web address:
http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. The Contractor may direct questions to the help desk at http://www.ecmra.mil.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=bro wsefar or http://farsite.hill.af.mil/ Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/d farspgi/current/index.html or http://farsite.hill.af.mil/
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 http://www.esd.whs.mil/Directives/i ssuances/dodm/
Federal Information Processing Standards (FIPS) Publication
201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIP S/NIST.FIPS.201-2.pdf
DoDM 5200.2 Regulation 5200.02 Procedures for the DoD Personnel
Security Program (PSP)
04/03/2017 http://www.dtic.mil/whs/directives/c orres/pub1.html
Army Directive 2014-05 Policy and Implementation
Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
03/07/2014 http://www.apd.army.mil/ProductM aps/PubForm/ArmyDir.aspx
AR 190-13
The Army Physical Security
Program
02/25/2011 http://www.apd.army.mil/ProductM aps/PubForm/AR.aspx
Homeland Security Presidential Directive (HSPD)-12
Policy for a Common Identification Standard for Federal Employees and Contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDD 5400.11 Department of Defense Privacy
Program
10/29/2014 http://www.dtic.mil/whs/directives/c orres/dir.html#
DoD 5400.11-R
Department of Defense Privacy Program
05/14/2007 http://www.dtic.mil/whs/directives/c orres/pub1.html
DoDD 8140.01
Cyberspace Workforce Management
08/11/2015 OK http://www.dtic.mil/whs/directives/c orres/dir.html
DoD 8570.01-M
Information Assurance Workforce Improvement Program
12/19/2005 (Change 4:
11/10/2015)
OK http://www.dtic.mil/whs/directives/c orres/pub1.html
AR 25-2
Information Assurance
10/24/2007 OK http://armypubs.army.mil/ProductM aps/PubForm/AR.aspx
AR 530-1
Operations Security
09/26/2014 OK http://armypubs.army.mil/ProductM aps/PubForm/AR.aspx
DoD 5220.22-M National Industrial Security Program Operating Manual
02/28/2006 (Change 2:
05/18/2016)
OK http://www.dtic.mil/whs/directives/c orres/pub1.html
AR 381-12
Threat Awareness and Reporting
Program (TARP) (Section II, ¶ 2-4.b)
06/01/2016 OK http://armypubs.army.mil/ProductM aps/PubForm/AR.aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9 Employment Eligibility
Verification
11/14/16 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense
Security Agreement
Jan 2017 http://www.dtic.mil/whs/directives/forms/dd/ddforms000 1-0499.htm
DD 250
Material Inspection and
Receiving Report
Aug 2000 http://dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm
TECHNICAL EXHIBIT 1
Quality Surveillance Assurance Plan (QASP)
This QASP includes performance objectives the Government will use to determine the Contractor’s performance and will compare Contractor performance to the Acceptable Quality Level (AQL).
Performance Objective
Performance Standard Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
5.1 Portable
Latrines and Handwashing
Stations
Keep all portable latrines and handwashing stations stocked with all items, good and products necessary for their use from 30 July 2020 to 10
Aug 2020.
Meets the standard 95% of the time.
Periodic Inspection / COR
5.1 Portable
Latrines and Handwashing
Stations
Provide periodic cleaning of the portable latrines and handwashing stations to maintain a clean appearance free of dirt, trash or debris from 30 July 2020 to 10 Aug 2020.
Meets the standard 95% of the time.
Periodic Inspection / COR
5.1 Portable
Latrines and Handwashing
Stations
Provide periodic dumping and refilling of the portable latrines and hand washing stations to maintain them in a sanitary and usable condition from 30 July 2020 to 10 Aug 2020.
Meets the standard 95% of the time.
Periodic Inspection / COR
5.2 Packaged Ice
Deliveries will be every other day starting after the first delivery with a total of ten deliveries of 30,000 pounds of ice.
Delivers made on schedule with the correct amount of ice 90% of the time.
Random Monitoring / COR
5.3 Roll-off
Dumpsters
Provide the ability to move and/or dump the 30 yard roll-off dumpster within 24 hours of request.
Request fulfilled within the 24 hour time frame
90% of the time.
Random Monitoring / COR
5.4 Refrigeration
Trailer
Maintain the refrigeration trailer in a fully operable condition for the entirety of the Period of Performance.
Refrigeration Trailer fails to function properly and is immediately fixed/repaired/replaced.
Periodic Inspection / COR
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS
Reference / Deliverable
Title
Frequency Number of Copies
Medium/Format Submit To
1.4.1 Quality
Control Plan
(QCP)
Provide NLT 5 days after contract award.
1 Electronic Submission
KO
(End of Summary of Changes)