P00001 to W912L1-20-Q-0023.pdf

PDF 169 KB Posted

Attached to
Forklift
Solicitation number
W912L1-20-Q-0023
Issued by

View the file

Other files

File Type Posted
P00002 to W912L1-20-Q-0023.pdf PDF
Solicitation - W912L1-20-Q-0023 - Forklift.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPFO FOR TX - PURCHASING & CONTRACTING

ATTN: REGINA MCKINNIE

2200 W.35TH ST.

AUSTIN TX 78703

0011335272

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s: 1. Address questions submitted via email to TXARNG's-answ ers to each of the questions are included see attached. 2. Vendors are required to sign this document and return one (1) copy to the ISSUING OFFICE along w ith their quote. 3. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L120Q0023

X 9B. DATED (SEE ITEM 11)

30-Jan-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Feb-2020

CODE

USPFO FOR TEXAS

CONTRACTING BRANCH

2200 WEST 35TH STREET

BLDG 66

AUSTIN TX 78703-1222

W912L1 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912L1

FACILITY CODECODE

EMAIL:TEL:

W912L120Q0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWER SHEET

QUESTIONS AND ANSWERS

FOR

RFQ # W912L1-20-Q-0023

Forklift

VENDOR’S QUESTIONS GOVERNMENT’S ANSWERS

1.I just realized that the specs are not very specific and wanted to ask a couple of things. Do you know if there is a height requirement for the unit or forks length? I also need to know if the cab needs to be open or enclosed.

Our current forklift has 98" forks. So something within that range. No real height requirement but must stay under 18' due to powerlines.

2.Lifting height required (in order to determine correct mast configuration).

Double Mast

3. Fork length required. 98”

4.Are any attachments required (side shifter , fork positioner . or both)

Side Shifter and Fork Positioner

5. Does the unit require a cab?

Heating? Air conditioning?

No

6. Lighting (headlights, tail lights, directional signals, work lights?)

Yes, Headlights, and normal safety lights

7. Safety equipment (strobe/ warning lights, back up alarm, fire extinguisher).

Yes this is an OSHA requirement….must meet OSHA

8. Operator comfort (type of seat (suspension, semi suspension)

Normal seat

9.20k capacity at 24” load center, or 48” load center?

20K capacity

W912L120Q0023

(End of

Summary of Changes)

10.Lift height required, the fork length, type of forks (hook type or shaft type), is hydraulic fork positioning and hydraulic side shifting required?

Double mast

11.Do you want air tires or solid pneumatic?

Solid tires

12. Do you want enclosed cab either with or without HVAC, or just a standard open overhead guard ?

NA

13.Any special warning devices or lighting ?

NA

14. Do you have any further specs on the forklift that you require? The description in the line item does not give enough detail of what the end user requires. Please advise.

Diesel

15. What Type of application will the forklift used for?

Outdoor container lifting

16.Any additional technical details or required options that help us configure the proper forklift without proposing un-necessary features that will affect the overall price.

NO

File details come from the government source that posted it. Updated .