EXHIBIT F PROPOSAL INQUIRY FORMAT

Subject Line: Reference No. W912L1-18-R-0001

Email: denise.m.bailey.mil@mail.mil

Question 1: Drawing E-101, Note 4 says to provide “blue light. Please provide fixture specifications or part number.

Answer to Q1: The basis of design was Edwards Signaling, Model number 53B-G1. See attached product data sheet. The product is not brand name specific. The Government will accept an “or equal product”.

Question 2: A501- Elevations show an accent tile but the Finish Schedule on A605 only shows one tile

PORC-1. Please clarify if we shall consider PORC-1, or if specifications for the accent tile will be provided.

Answer to Q2: Sheet A-605 indicates several tiles, see snippet below.

Snippet from Sheet A-605

Snippet from Sheet A-501 for typical sleeping quarters restroom

The accent tile should call out PORC-4, rather than PORC-4/5 mailto:denise.m.bailey.mil@mail.mil

Question 3: A605 - RR Floors is show on the A605 Finish Schedule as PORC 4 and 5 but no pattern is shown, or percentage needed of each. Please provide pattern or indicate percentage we shall consider for each.

Answer to Q3: See attached snippet from the base standard for the floor pattern. Assume 10% accent tile for floor pattern.

Question 4: A803- No CT-1 is specified, but the elevations are similar to the Porcelain wall tile on A501.

Please indicate which tile shall we consider, or provide specifications for CT-1.

Answer to Q4: Please see below for base standard; however, the government will accept “or equal” products to the products outlined below.

WAINCOTS

A. Field Tile: Porcelain Tile (POR) : Daltile Corporation Matte

1). Size: Nominal 6” x 6” x 5/16”

2). Finish: Matte

3). Gout Joint 1/16”

4). Color: #X735 Matte Almond

B. Accent Tile: Ceramic Tile (CT): Daltile Corporation Matte

1). Size: Nominal 6” x6” x 5/16”

2). Finish: Matte

3). Grout Joint 1/16”

4). Color: #0766 Matte Elemental Tan

C. Porcelain Tile Base (Colors Crossville Ceramic Tile)

1). Size 6” H x 8” W x 5/16” thick integral cove bottom and bullnose top

2). Color: # A790 UPS Burgundy Stone

3). Grout: ¼” Color: Laticrete #42 Platinum

Question 5: Please provide clarifications of what the contractor is required to provide in regard to temporary facilities.

Answer to Q5: See revised specification 01 50 00 Temporary Facilities and Temporary Controls with clarifications clouded

Question 6: The Government has requested contractor to provide temporary facilities for personnel during renovation, however aside from information found on Drawing C-002, we have not been afforded precise information on the location (i.e. grass vs concrete), utility connections required by contractor, data requirements, etc. Please clarify.

Answer to Q6: Drawing C-002 shows the proposed location of the trailers. The proposed location is not on concrete and there is a drainage swell between concrete and trailers. ES-101 Keynote 4 indicates where power is to be pulled from. Communications is to be pulled from Building 1394. The contractor is to work with the contracting officer, base engineering and base communications on final placement of trailers and connection of utilities. A revised C-

002 is attached for clarification of existing utility locations.

Question 7: Are the temporary personnel facilities noted on C-002 required to be furnished?

Answer to Q7: Yes, see revised specification 01 50 00 Temporary Facilities and Temporary Controls with clarifications clouded

Question 8: Drawing E-101, Note 4 says to provide “blue light. Please provide fixture specifications or part number.

Answer to Q8: See answer to Question 1

Question 9: Drawing A-562 shows Detail 4 & B4, B5 for Armoire units to be constructed, however they do not appear on the Layout Plan A-101. Please clarify locations and quantity of the Armoire units.

Answer to Q9: Armoires are shown in Bedroom Type B see sheet A101 and detail B1/A501 for quantities

Additionally, the armoire is a part of Option 3, see sheet A-801 for locations – see Typical Enlarged Bedroom Plan and New Bunk Floor Plan.

Question 10: Drawings A-603 & A-604 detail a solid surface for window sill and jamb, however the layout plan A-101 does not show quantity or location. Please clarify quantity and locations of Window Sills &

Window jams.

Answer to Q10: The window types are called out on the floor plan on sheet A-101. The window types drawing on sheet A-603 indicate the sill and jamb details to clarify quantity of solid surface stools. For additional clarification, the existing building is composed of two construction types (PEMB and CMU). Details B1/A-604 and A1/A-604 are for the PEMB portion of the existing structure, details C2/A-603 and A2/A-603 are for the window in the kitchen and the Lounge which are in CMU structure. Details B3/A-604 and A3/A-604 are for the CMU portion of the new addition.

Question 11: Specification 01 03 20, 3.1.A.2 calls for Epoxy Floor Coating in Base Building areas with stained concrete. The drawings do not show the location of the areas with stained concrete. Please provide the location of areas with stained concrete floors that require Epoxy Floor Coating.

Answer to Q11: Refer to Finish Schedule on sheet A-605, areas with stained concrete are labeled STC in the legend.

This references Option 2 indicated on the cover sheet.