Encl_16_-_Brand_Name_Justification_and_Approval_Howitzer_Covers_PR_10923031.pdf

PDF 365 KB Posted

Attached to
M777 Covers
Solicitation number
W912L1-17-T-0022
Issued by

About this file

J&A

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Organization/Contracting Office

2. Description of Action Being Taken:

If needed, continue on a separate piece of paper

3. Description of Product, Supplies or Services:

If needed, continue on a separate piece of paper

4. An identification of the statutory authority permitting other than full and open competition (Requesting activity completes with the assistance of the Contracting Specialist)

P&C Form 0005 (26 Dec 13) 1 If needed, continue on a separate piece of paper

USPFO For Texas Purchasing and Contracting Office

PR Number:

Requesting Activity:

BRAND NAME JUSTIFICATION AND APPROVAL

Limited Sources Justification and Approval

Enclosure 16

5. Identification of the Justification Rationale:

6. Best Value Determination:

If needed, continue on a separate piece of paper

7. Market Research Conducted If needed, continue on a separate piece of paper

If needed, continue on a separate piece of paper

8. Statement of actions, if any, to remove barriers to competition in the future.

P&C Form 0005 (26 Dec 13) 2

If needed, continue on a separate piece of paper

9. Any other facts supporting justification:

If needed, continue on a separate piece of paper

TECHNICAL CERTIFICATION/ REQUIREMENTS CERTIFICATION: “I certify that the supporting data under my cognizance which are included in the J&A are accurate and complete to the best of my knowledge and belief.”

Name: Date:

Title: Signature:

PROGRAM MANAGER REVIEW: “The requirement herein described is a valid requirement of the activity named in paragraph 3 of this J&A. The technical and requirements information contained in the J&A represent the minimum needs of the government. The only way to satisfy this requirement is by limiting competition as described herein.”

Name: Date:

Title: Signature:

CONTRACTING SPECIALIST: “I certify that this J&A is accurate and complete to the best of my knowledge and belief.” Recommend: Approval Disapproval

Name: Date:

Title: Signature:

APPROVAL

CONTRACTING OFFICER: Based on the forgoing justification, I hereby Approve Disapprove the brand name justification for the requirement listed in paragraph 3 above for limited sources.

Name: Date:

Title:

P&C Form 0005 (26 Dec 13) 3

Signature:

PR Number: 10923031
Requesting Activity: Purchase of M777 Howitzer Cover / M777 HYDRO Strut Corrosion Protective Cover / M119 Howitzer SLED and Complete Cover
If needed continue on a separate piece of paper: The USPFO for Texas, Purchasing and Contrating Office, requests a Firm Fixed Price contract with L&C Protec, Inc (DBA Cocoon). The Government intends to award on the basis of other than full and open competition.
If needed continue on a separate piece of paper_2: The Texas National Guard has a requirement to acquire M777 Howitzer gun (body and barrel) covers with a patented corrosion preventive textile with a high vapor transfer rate and shielding properties utilized as a unique artillery cover application. This patented cover material is an extremely durable 3-layer laminate that is air permeable, waterproof, and contains a hydrophobic polytetrafluoroethylene membrane. This unique patented membrane fabric system offers military equipment and weapons systems a very high level of environmental protection.
If needed continue on a separate piece of paper_3: The statutory authority permitting other than full and open competition is 10 U.S.C. 2304(c)(1) or 41 U.S.C. 253(c)(1) as implemented by the Federal Acquisition Regulation (FAR) Subpart 6.302-1 "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." FAR subpart 6.302-1 allows for the limiting of competition to procure unique supplies or services available form only one source or only one suppler with unique capabilities.
If needed continue on a separate piece of paper_4: Cocoon is the only contractor that has the patented material for these covers. The Cocoon covers protect against corrosion, mold/mildew, extreme temperatures, abrasion, UV damage, pollution and ice through a patented expanded polytetrafluoroethylene fabric membrane and are required in order to adequately protect the M777 Howitzers from the harsh elements. Cocoon cover material is inherently electrostatic discharge, a critical requirement when covering artillery. The Cocoon's cover material's dry weight is equal to its wet weight at less that 12 ounces per square yard. A too heavy cover will damage artillery components, become a user safety hazard and when frozen, become unusable. Cocoon is the only COTS cover that meets ASTM D737 0.1 CFM, the minimal requirement needed to eliminate heat and moisture under a cover to prevent corrosion and mitigate heat degradation to electronics. Additionally, there are no vapor corrosion inhibitors or desiccants in Cocoon covers - substances that cause corrosion.
If needed continue on a separate piece of paper_5: Based on Cocoon's patented cover material outlined above and technical information provided by AMCOM Corrosion Program Office, Cocoon covers provide the best protection for the M777 Towed Howitzer artillery equipment which can be damaged by heat and corrosion leading to inoperable, non-mission ready weaponry.
If needed continue on a separate piece of paper_6: The Market Research we conducted was contacting the AMCOM Corrosion Program Office. We then were sent the INFORMATION PAPER attached to the PR. This covers the background, technical description, testing, and recommendation. It was determined by the AMCOM Corrosion Program Manager that Cocoon Covers are Army approved. This provided the research and testing we used to make a decision on Market Research.
If needed continue on a separate piece of paper_7:
If needed continue on a separate piece of paper_8: The detrimental effects to the mission if the covers are not procured is that the M777 Towed Howitzers will sustain severe weather related damage ultimately making the equipment inoperable and the unit non-mission ready. Additionally, equipment defects puts the unit at a greater danger of loss of life and mission failure. The cost for repair because of damage would continue and may ultimately lead to the loss of the entire Howitzer. This type of damage can be prevented with the acquisition of these Cocoon material patented COTS covers.
Name: Ruiz, Dennis
Date: 11-10-16
Title: BN S-4
2016-11-10T10:03:20-0700
RUIZ.DENNIS.1241906970
Name_2: Suzanne Fallis
Date_2: 12-20-2016
Title_2: Contract Specialist
2016-12-20T10:14:56-0600
FALLIS.SUZANNE.LYNN.1160573097
Approval: Off
Disapproval: Off
Name_3:
Date_3:
Title_3:
Approve: Off
Disapprove the brand: Off
Name_4:
Date_4:
Title_4:

File details come from the government source that posted it. Updated .