W912KZ23R0002 Hard Toppers Amendment 0001.pdf

PDF 298 KB Posted

Attached to
Request For Quote (RFQ) for Hard Toppers for Military MTV
Solicitation number
W912KZ23R0002
Issued by

View the file

Other files

File Type Posted
W912KZ23R0002 Hard Toppers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPFO KY PURCHASING & CONTRACTING

BOONE NATIONAL GUARD CENTER,

BUILDING 120

120 MINUTEMAN PARKWAY

FRANKFORT KY 40601-6192

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

-The purpose of this amendment is to correct the specifications, and are marked w ithin the solicitation as ****AMDMT 0001****.

-There are no other changes at this time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Nov-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912KZ23R0002

X 9B. DATED (SEE ITEM 11)

02-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Nov-2022

CODE

USPFO FOR KENTUCKY

BNGC, BLDG 120

120 MINUTEMAN PARKWAY

FRANKFORT KY 40601-6192

W912KZ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912KZ

FACILITY CODECODE

EMAIL:TEL:

W912KZ23R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

- A hard shell top that covers the same general area as the MTV tarp and bows; approx 175" long x 96" wide x 72" high.- Size and weight of the hard shell top makes no significant change to the vehicles' center of gravity.- It must be made of a material durable enough to maintain its structure in multiple environments; heat, cold, dust, snow, heavy rainfall, both high and low humidity.- The design will facilitate the ease of installation and removal of the hard shelltop from the MTV without modification of the MTV.- The hard shell must be water tight, i.e. keeps water out of the MTV cargo area during driving, washing, rainfall, and melting snow.- The material must be adhesive to military spec Chemical Agent ResistantCoating (CARC) paint, as the hard shell top may be painted to match the colorscheme of the vehicle.- Two doors, at the rear of the hard shell top giving access to the MTV cargo area for personnel to enter and exit the vehicle and also that allows cargo to be placed in the cargo area of the MTV. Doors must open to the outside and each door must be a minimum of 30 inches wide and 60 inches tall hinged on the left and right sides.The bottom of the door should be flush with the bed of the truck. Doors must be securable with padlocks.- Must allow for the option of air vents to allow air flow and circulation in theenclosed storage area.- Must allow for the option of porthole type windows in the sidewalls and rear doors of the hard shell top.CONTRACTOR

PROVIDE DELIVERY DATE ON QUOTE

To:

- A hard shell top that covers the same general area as the MTV tarp and bows; approx 175" long x 96" wide x 72" high.

- Size and weight of the hard shell top makes no significant change to the vehicles' center of gravity.

- It must be made of a material durable enough to maintain its structure in multiple environments; heat, cold, dust, snow, heavy rainfall, both high and low humidity.

- The design will facilitate the ease of installation and removal of the hard shell top from the MTV without modification of the MTV.

- The hard shell must be water tight, i.e. keeps water out of the MTV cargo area during driving, washing, rainfall, and melting snow.

- The material must be adhesive to military spec Chemical Agent Resistant Coating (CARC) paint, as the hard shell top may be painted to match the color scheme of the vehicle.

- Two doors, at the rear of the hard shell top giving access to the MTV cargo area for personnel to enter and exit the vehicle and also that allows cargo to be placed in the cargo area of the MTV. Doors must open to the outside and each door must be a minimum of 30 inches wide and 60 inches tall hinged on the left and right sides. The bottom of the door should be flush with the bed of the truck. Doors must be securable with padlocks.

*****AMDT 0001*****- Must include 6 x two way ventilators to allow air flow and circulation in the enclosed storage area on both Hard Tops.- One Topper must include porthole type windows in the sidewalls and rear doors of the hard shell top.

*****AMDT 0001*****

CONTRACTOR PROVIDE DELIVERY DATE ON QUOTE

(End of Summary of Changes)

File details come from the government source that posted it. Updated .