About this file

Distro Plan

View the file

Other files

File Type Posted
A-1_Attach_2_-_Cable_Specs_-_Nov16.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comm Infrastructure – NCC to BATS

Comm Infrastructure – NCC to BATS image1.emf

H

V

A

C

H V

A

C

DOOR

Comm Cabling Site Plan

In Rm 102 connect SM, MM fiber and CAT6e copper into new or existing patch panels in rack 1206

Use existing cable tray and/or install J- hooks for support.

Transition to existing conduit in room 111 and thru Rm 113A.

Transition to existing underground conduit to Junction box.

Install new conduit from junction box to pass thru device

Continue along beam appx 10ft a.f.f. to terminal location. Terminate into a new patch panel within a new 19” equipment rack.

- (Qty 1) 24 port singlemode LC patch panel

- (Qty 1) 24 port multimode LC patch panel

- (Qty 1) 24 port CAT6e LC patch panel image3.png image4.png image1.png image2.png image2.png image3.emf