A-1_Attach_1_-_BATS_Cable_Distribution_Plan_(Revised).pptx
PPTX presentation 654 KB Posted
- Attached to
- Cable and Associated Equipment
- Solicitation number
- W912K3-18-Q-5004
About this file
Distro Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-1_Attach_2_-_Cable_Specs_-_Nov16.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comm Infrastructure – NCC to BATS
Comm Infrastructure – NCC to BATS image1.emf
H
V
A
C
H V
A
C
DOOR
Comm Cabling Site Plan
In Rm 102 connect SM, MM fiber and CAT6e copper into new or existing patch panels in rack 1206
Use existing cable tray and/or install J- hooks for support.
Transition to existing conduit in room 111 and thru Rm 113A.
Transition to existing underground conduit to Junction box.
Install new conduit from junction box to pass thru device
Continue along beam appx 10ft a.f.f. to terminal location. Terminate into a new patch panel within a new 19” equipment rack.
- (Qty 1) 24 port singlemode LC patch panel
- (Qty 1) 24 port multimode LC patch panel
- (Qty 1) 24 port CAT6e LC patch panel image3.png image4.png image1.png image2.png image2.png image3.emf