Bidders Questions Answered

View the file

Other files for this federal contract opportunity

Other files attached to Repair Roads, newest first.
File Type Posted
ROADIMPROVE_B.pdf PDF
ROADIMPROVE_A_and_E.pdf PDF
ROADIMPROVE_C.pdf PDF
W912JM-19-R-6009_SOLICITATION.pdf PDF
SOW_XDQU192452_Repair_Roads-Bob_Harman_Road,_Brushwood_Drive,_&_Robbins_Drive.docx DOCX document
ROADIMPROVE_F.pdf PDF
RFI_Template.doc DOC document
ROADIMPROVE_D.pdf PDF
Past_Performance_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION Responses

REQUESTOR SECTION

Company:

Date:

07/17/2019

To:

Contracting Officer james.sheppard12.mil@mail.mil

1. Solicitation Number:

W912JM-19-R-6009

2. Location of Project:

GARDEN CITY ANGB

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy) Q1.

Will there be a staging area designated for the duration of this project?

Q2.

It appears there are traffic loop detectors at gate # 192 that will be in the project limits. Will the contractor be responsible for replacing these loops if they are disturbed?

Q3.

Will the contractor be required to adjust manholes in the roadway?

Q4.

Will the contractor be required to remove/replace any damaged concrete wheel stops?

Q5.

On (Pavement Repair “A” and “D”) there are numerous concrete patches in the asphalt roadway. Will the contractor be expected to remove any concrete in the asphalt repair areas?

Attachments:

Date Response Required:

By:

Title:

RESPONSE
To:

Date:

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Q1.

Will there be a staging area designated for the duration of this project? The grassed area west of bldg. 262 and south of bldg. 210 will be utilized as a staging area.

Q2.

It appears there are traffic loop detectors at gate # 192 that will be in the project limits. Will the contractor be responsible for replacing these loops if they are disturbed? Loop detectors will not be replaced as part of this contact.

Q3.

Will the contractor be required to adjust manholes in the roadway? Manhole adjustments are not required.

Q4.

Will the contractor be required to remove/replace any damaged concrete wheel stops? The contractor is required to remove all wheel stops, consolidate and stack neatly near their respective areas. The contractor is not required to reinstall wheel stops.

Q5.

On (Pavement Repair “A” and “D”) there are numerous concrete patches in the asphalt roadway. Will the contractor be expected to remove any concrete in the asphalt repair areas? The contractor will not be required to remove any concrete.

FORMCHECKBOX

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

FORMCHECKBOX

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it.