Statement of Work

View the file

Other files

File Type Posted
Bid_Opening_Bldg_541.pdf PDF
W912JD-18-B-2006-0002.pdf PDF
Attendance_Roster.pdf PDF
W912JD-18-B-2006-0001.pdf PDF
11_Repair_Bldg_541_Exterior_Drawings_Rev_121917.pdf PDF
W912JD-18-B-2006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINE AIR NATIONAL GUARD

101st CIVIL ENGINEER SQUADRON (AMC)

106 ASHLEY AVENUE, SUITE 486

BANGOR, MAINE 04401-3051

STATEMENT OF WORK

REPAIR BUILDING 541 EXTERIOR

PROJECT NUMBER: FKNN172320

12 December 2017

FOR

UNITED STATES PROPERTY AND FISCAL OFFICES

MAINE NATIONAL GUARD

AUGUSTA, MAINE 04333

PART 1

GENERAL:

1.1 LOCATION: Building 541, Maine Air National Guard (ANG), Bangor International Airport, Bangor, Maine, 04401.

1.2 CONTRACTING OFFICER REPRESENTATIVE (COR): The 101st Civil Engineer Squadron provides the COR and all technical advice or assistance. The following individual is the designated COR for this project:

Capt Daniel Trembley.

1.3 GOVERNMENT FURNISHED MATERIALS: None.

1.4 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: The Contractor shall be required to commence work under this contract within thirty (30) calendar days after the date the contractor receives notice to proceed, prosecute the work diligently, and complete the entire project no later than sixty (60) calendar days following the commencement of work.

1.5 SPECIAL PROVISIONS:

1.5.1 Some of the work will be performed within the airfield fence, Contractor shall take every precaution necessary to ensure Foreign Object Debris (FOD) does not get tracked or blown into the airfield.

1.5.2 The airfield side of the fence is a Controlled area, and as such, will require establishment of a Free Zone so the Contractor can work within the Controlled Area unescorted. It will be a requirement for the extents of the

Free Zone to be clearly marked with construction cones, spaced nor more than 50’ apart. It will be the

Contractor’s responsibility to provide and set these cones.

1.5.3 The building will be occupied throughout the duration of the project, the Contractor will have to coordinate with the COR and building occupants to ensure work performed does not interfere with the day to day operations of the occupants.

1.6 SUBMITTALS: Provide electronic submittals, along with materials samples as noted below, to the KO and

COR for review and approval. Allow 7 days for review of Construction Submittals, which shall be submitted by the Contractor far enough in advance to not cause project delay. For this project, the following submittals are required:

1.6.1 Proposed project schedule for coordination with COR and building occupants

1.6.2 Product warranties

1.6.3 List of key employees and subcontractors, with contact information

1.6.4 Door and window caulking (cut sheets and SDS, color samples)

1.6.5 Door weather stripping and sweeps (cut sheets)

1.6.6 Control joint caulking (cut sheet and SDS, color samples)

1.6.7 Backer rod (cut sheets)

1.6.8 Primer (cut sheet and SDS)

1.6.9 Paints (cut sheet and SDS, color samples)

1.6.10 Masonry block, if replacement is needed (sample)

1.6.11 Mortar (cut sheet, SDS, color samples)

1.6.12 Masonry cleaning products (cut sheet and SDS)

1.6.13 Masonry repointing materials (cut sheets)

1.6.14 Masonry sealant (cut sheet and SDS)

1.6.15 Hole patching materials (cut sheets)

1.6.16 EFIS repair materials (cut sheets)

1.6.17 Foundation Insulation Panels (cut sheet and sample)

1.6.18 Landscape stone for drip edge (sample)

1.6.19 Loam (material test report)

1.6.20 Seed mix (cert.)

PART 2

PRODUCTS:

2.1 Products shall be installed per attached plan and conform to the following:

2.1.1 All products shall be in accordance with the Buy American Act.

2.1.2 Products are to be installed in accordance with manufacturer’s specifications.

2.1.3 Dow Corning 795 Silicone Building Sealant, or approved equivalent, for door and window caulking.

2.1.4 Exactitude 379 CS door weather stripping and 4301 CRL door sweeps, or approved equivalents.

2.1.5 Dow Corning 790 Silicone Building Sealant, or approved equivalent, for control joints.

2.1.6 J&K standard, closed cell polyethylene backer rod, or approved equivalent, sized according to manufacturer’s recommendations.

2.1.7 Demandit Smooth Exterior Acrylic Architectural Coatings, or approved equivalent, for EFIS paint, 2 coats

2.1.8 Dryvit EFIS repair materials, or approved equivalent

2.1.9 EnviroKLEAN ReVive masonry/concrete cleaner, or approved equivalent

2.1.10 Conpro Shield MX masonry sealant, or approved equivalent

2.1.11 Styro Industries FP Ultra Lite 1” Foundation Insulation Panels, pre-coated with aggregate, or approved equivalent.

PART 3

EXECUTION:

SUMMARY OF WORK:

3.1 All work shall be accomplished per specifications, drawings, and manufacturer’s instructions. The work to be completed on this project consists of (but is not limited to) providing all plant, labor and materials to complete the following major descriptive items. All measurements and quantities shall be field verified.

3.1.1 Re-caulk all exterior doors and windows

3.1.2 Clean all organic growth from existing masonry

3.1.3 Repoint all masonry, enlarge voids and holes, except weep holes, andcompletely fill with mortar. Point up joints, including corners, openings, and adjacent construction, to provide a neat, uniform appearance.

Prepare joints for sealant application.

3.1.4 Apply masonry sealant to all masonry per manufacturer’s instructions, allowing adequate cure of mortar before application.

3.1.5 Remove and replace all control joint materials, including backer rod and caulking

3.1.6 Prep and paint all EFIS, two coats

3.1.7 Perform minor repairs to EFIS as needed

3.1.8 Prep and paint all exterior doors, both sides of slabs and trim, two coats

3.1.9 Replace all exterior door weather stripping and sweeps

3.1.10 Prep and paint both sides of exterior overhead doors, two coats

3.1.11 Remove gravel haunch around perimeter of building to a depth of 4” below new grade, maintain 1% slope away from building

3.1.12 Remove existing exterior frost wall insulation to 4” below new grade, replace with new 1” foundation insulation panels pre-coated with aggregate per manufacturer’s instructions

3.1.13 Install new 18” wide, 4” deep stone drip edge around building perimeter at pervious surfaces

3.1.14 Place loam (min. 4”) and seed from new stone drip edge to extents of excavated haunch

3.1.15 Remove abandoned propane line to just inside building, cap, and seal hole in exterior wall

3.1.16 Remove 2x6 PT boards from exterior wall near entrance

3.1.17 Seal all penetrations thru exterior wall

3.1.18 Repair exterior door hinges where shown on the drawings

3.1.19 Contractor shall provide a porta-potty for its employees and subs through duration of project

PART 4

ATTACHMENTS:

4. The following attachments are part of this contract Statement of Work:

4.1 Drawings “Repair Bldg 541 Exterior FKNN172320”, sheets A1, A2, A3, A4, A5, E1, E2

4.2 329200 – Turfs and Grasses

BANGOR, MAINE

TURF AND GRASSES 32900-1

SECTION 329200 - TURF AND GRASSES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general p rovis ions of the Contract apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Placing planting soil, seeding, fertilizing and mulching.

B. Related Sections include the following:

1. Section 311000 "Site Clearing" for stripping existing topsoil.

2. Section 312000 "Earth Moving" for stripping existing topsoil, excavation, filling and backfilling, and rough grading.

1.3 DEFINITIONS

A. Finish Grade: Elevation of finished surface of planting soil.

B. Manufactured Soil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

C. Planting Soil: Native or imported topsoil, manufactured topsoil, or surface soil modified to become topsoil; mixed with soil amendments.

D. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill immediately beneath planting soil.

1.4 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of the Construction Contract Clauses, Statement of Work, and the individual sections specifying the work.

B. Product Data: For each type of product indicated.

1.5 INFORMATIONAL SUBMITTALS

A. Submittals shall comply with the requirements of the Construction Contract Clauses, Statement of Work, and the individual sections specifying the work.

B. Certification of Grass Seed: From seed vendor for each grass-seed monostand or mixture stating the botanical and common name and percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date

TURF AND GRASSES 32900-2

of packaging.

C. Material Test Reports: For existing surface soil and imported topsoil.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: A qualified landscape installer whose work has resulted in successful lawn establishment.

B. Soil-Testing Laboratory Qualifications: An independent laboratory, recognized by the State

Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed.

C. Topsoil Analysis: Furnish soil analysis by a qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content; cation exchange capacity;

deleterious material; pH; and mineral and plant-nutrient content of topsoil.

1. Report suitability of topsoil for lawn growth. State recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Seed: Deliver seed in original sealed, labeled, and undamaged containers.

1.8 SCHEDULING

A. Planting Restrictions: Plant during one of the following periods. Coordinate planting periods with maintenance periods to provide required maintenance from date of Substantial Completion.

1. Spring Planting: April 1 to July 1.

2. Fall Planting: August 15 to October 1.

B. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit.

1.9 LAWN MAINTENANCE

A. Begin maintenance immediately after each area is planted and continue until acceptable lawn is established, but not for less than the following periods:

1. Seeded Lawns: 60 days from date of Substantial Completion.

a. When full maintenance period has not elapsed before end of planting season, or if lawn is not fully established, continue maintenance during next planting season.

B. Maintain and establish lawn by watering, fertilizing, weeding, mowing, trimming, replanting, and other operations. Roll, re-grade, and replant bare or eroded areas and re-mulch to produce a uniformly smooth lawn.

1. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch. Anchor as required to prevent displacement.

TURF AND GRASSES 32900-3

C. Watering: Provide and maintain temporary piping, hoses, and lawn-watering equipment to convey water from sources and to keep lawn uniformly moist to a depth of 4 inches.

1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

2. Water lawn at a minimum rate of 1 inch per week.

D. Mow lawn as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 40 percent of grass height. Remove no more than 40 percent of grass-leaf growth in initial or subsequent mowing’s. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowing’s to maintain the following grass height:

1. Mow grass 1-1/2 to 2 inches high.

E. Lawn Post-fertilization: Apply fertilizer after initial mowing and when grass is dry.

1. Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. ft. to lawn area.

PART 2 - PRODUCTS

2.1 SEED

A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Journal of Seed

Technology; Rules for Testing Seeds" for purity and germination tolerances.

B. Seed Species: Seed of grass species as follows, with not less than 80 percent germination, not less than 85 percent pure seed, and not more than 0.5 percent weed seed:

1. Turf grass: PLS- LMA Three Way Tall Fescue (or approved equal):

a. 34.65% Lexington Tall Fescue

b. 29.70% Falcon IV Tall Fescue

c. 19.80% Tahoe Tall Fescue

d. 0.85% Inert

e. 0.15% Crop

2.2 PLANTING SOIL

A. Planting Soil: ASTM D 5268, pH range of 5.5 to 8.0, 10 to 20 percent of organic material content; free of stones 1 inch or larger in any dimension and other extraneous materials harmful to plant growth.

1. Planting Soil Source: Reuse on-site surface soil. Verify suitability of surface soil to produce planting soil. Clean surface soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.

a. Supplement with imported or manufactured topsoil from off-site sources when quantities are insufficient. Obtain topsoil displaced from naturally well-drained construction or mining sites where topsoil occurs at least 4 inches deep; do not obtain from agricultural land, bogs or marshes.

TURF AND GRASSES 32900-4

2.3 INORGANIC SOIL AMENDMENTS

A. Lime: ASTM C 602, agricultural limestone containing a minimum 80 percent calcium carbonate equivalent and as follows:

1. Class: Class T, with a minimum 99 percent passing through No. 8 sieve and a minimum 75 percent passing through No. 60 sieve.

2. Provide lime in form of dolomitic limestone.

B. Sulfur: Granular, biodegradable, containing a minimum of 90 percent sulfur, with a minimum 99 percent passing through No. 6 sieve and a maximum 10 percent passing through No. 40 sieve.

C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

D. Aluminum Sulfate: Commercial grade, unadulterated.

E. Perlite: Horticultural perlite, soil amendment grade.

F. Agricultural Gypsum: Finely ground, containing a minimum of 90 percent calcium sulfate.

G. Sand: Clean, washed, natural or manufactured, free of toxic materials.

2.4 ORGANIC SOIL AMENDMENTS

A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8;

moisture content 35 to 55 percent by weight; 100 percent passing through 3/4-inch sieve;

soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 50 to 60 percent of dry weight.

2. Feedstock: Agricultural or food residuals; or yard trimmings.

B. Peat: Finely divided or granular texture, with a pH range of 6 to 7.5, containing partially decomposed moss peat, native peat, or reed-sedge peat and having a water-absorbing capacity of 1100 to 2000 percent.

C. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture, free of chips, stones, sticks, soil, or toxic materials.

1. In lieu of decomposed wood derivatives, mix partially decomposed wood derivatives with at least 0.15 lb of ammonium nitrate or 0.25 lb of ammonium sulfate per cubic foot of loose sawdust or ground bark.

D. Manure: Well-rotted, un-leached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth.

2.5 PLANTING ACCESSORIES

A. Selective Herbicides: EPA registered and approved, of type recommended by manufacturer for

TURF AND GRASSES 32900-5

application. Herbicide requires approval from Contracting Officer prior to application.

2.6 FERTILIZER

A. Bone meal: Commercial, raw or steamed, finely ground; a minimum of 4 percent nitrogen and 20 percent phosphoric acid.

B. Superphosphate: Commercial, phosphate mixture, soluble; a minimum of 20 percent available phosphoric acid.

C. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency.

D. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency.

2.7 MULCHES

A. Straw Mulch: Provide air-dry, clean, mildew- and seed-free, salt hay or threshed straw of wheat, rye, oats, or barley.

B. Peat Mulch: Finely divided or granular texture, with a pH range of 6 to 7.5, containing partially decomposed moss peat, native peat, or reed-sedge peat and having a water-absorbing capacity of 1100 to 2000 percent.

C. Compost Mulch: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8;

moisture content 35 to 55 percent by weight; 100 percent passing through 1-inch sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 50 to 60 percent of dry weight.

2. Feedstock: Agricultural or food residuals; or yard trimmings.

D. Fiber Mulch: Biodegradable, dyed-wood, cellulose-fiber mulch; nontoxic; free of plant-growth or germination inhibitors; with maximum moisture content of 15 percent and a pH range of 4.5 to 6.5.

E. Nonasphaltic Tackifier: Colloidal tackifier recommended by fiber-mulch manufacturer for slurry application; nontoxic and free of plant-growth or germination inhibitors.

TURF AND GRASSES 32900-6

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas to receive lawns and grass for compliance with requirements and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations.

1. Protect adjacent and adjoining areas from hydroseeding overspray.

B. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

3.3 LAWN PREPARATION

A. Limit lawn subgrade preparation to areas to be planted.

B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 6 inches. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Spread planting soil, apply soil amendments and fertilizer on surface, and thoroughly blend.

a. Delay mixing fertilizer with planting soil if planting will not proceed within a few days.

b. Mix lime with dry soil before mixing fertilizer.

C. Unchanged Subgrades: If lawns are to be planted in areas unaltered or undisturbed by excavating, grading, or surface soil stripping operations, prepare surface soil as follows:

1. Remove existing grass, vegetation, and turf. Do not mix into surface soil.

2. Loosen surface soil to a depth of at least of 6 inches. Apply soil amendments and fertilizers according to planting soil mix proportions and mix thoroughly into top 4 inches of soil. Till soil to a homogeneous mixture of fine texture.

3. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, trash, and other extraneous matter.

4. Legally dispose of waste material, including grass, vegetation, and turf, off Owner's property.

D. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit fine grading to areas that can be planted in the immediate future.

TURF AND GRASSES 32900-7

E. Moisten prepared lawn areas before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

F. Restore areas if eroded or otherwise disturbed after finish grading and before planting.

3.4 SEEDING

A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other.

1. Do not use wet seed or seed that is moldy or otherwise damaged.

B. Sow seed at the rate of 3 to 4 lb/1000 sq. ft.

C. Rake seed lightly into top 1/8 inch of planting soil, roll lightly, and water with fine spray.

D. Protect seeded areas with slopes exceeding 1:4 with erosion-control blanket installed and stapled according to manufacturer's written instructions.

E. Protect seeded areas with slopes not exceeding 1:4 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose depth over seeded areas. Spread by hand, blower, or other suitable equipment.

1. Anchor straw mulch by crimping into topsoil with suitable mechanical equipment.

3.5 HYDROSEEDING

A. Hydroseeding: Mix specified seed, fertilizer, and fiber mulch in water, using equipment specifically designed for hydroseed application. Continue mixing until uniformly blended into homogeneous slurry suitable for hydraulic application.

1. Mix slurry with nonasphaltic tackifier.

2. Apply slurry uniformly to all areas to be seeded in a one-step process. Apply mulch at a minimum rate of 1500-lb/acre dry weight but not less than the rate required to obtain specified seed-sowing rate.

3.6 TURF RENOVATION

A. Renovate existing turf damaged by Contractor's operations, such as storage of materials or equipment and movement of vehicles.

1. Reestablish turf where settlement or washouts occur or where minor regrading is required.

2. Install new planting soil as required.

B. Remove sod and vegetation from diseased or unsatisfactory turf areas; do not bury in soil.

C. Remove existing topsoil containing foreign materials such as oil drippings, stones, gravel, and other construction materials resulting from Contractor's operations, and replace with new planting soil.

TURF AND GRASSES 32900-8

D. Mow, dethatch, core aerate, and rake existing turf.

E. Remove weeds before seeding. Where weeds are extensive, apply selective herbicides as required. Do not use pre-emergence herbicides. Herbicide use requires Contracting Officer approval prior to application.

F. Remove waste and foreign materials, including weeds, soil cores, grass, vegetation, and turf, and legally dispose of them off Owner's property.

G. Till stripped, bare, and compacted areas thoroughly to a soil depth of 6 inches.

H. Apply soil amendments and initial fertilizers required for establishing new turf and mix thoroughly into top 4 inches of existing soil. Install new planting soil to fill low spots and meet finish grades.

I. Apply seed and protect with straw mulch as required for new turf.

J. Water newly planted areas and keep moist until new turf is established.

3.7 SATISFACTORY LAWNS

A. Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.

B. Reestablish lawns that do not comply with requirements and continue maintenance until lawns are satisfactory.

3.8 CLEANUP AND PROTECTION

A. Promptly remove soil and debris created by lawn work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.

B. Erect barricades and warning signs as required to protect newly planted areas from traffic.

Maintain barricades throughout maintenance period and remove after lawn is established.

C. Remove erosion-control measures after grass establishment period.

END OF SECTION

SOW FKNN172320 Repair B541 Exterior
329200 Turfs and Grasses