Site Visit Questions with Answers.pdf

PDF 21 KB Posted

Attached to
Replace KC-135 Maintenance Hangar Federal contract opportunity
Solicitation number
W912JD-10-R-0001
Issued by
Department of the Army Maine Army National Guard

About this file

Site Visit Questions with Answers

View the file

Other files for this federal contract opportunity

Other files attached to Replace KC-135 Maintenance Hangar, newest first.
File Type Posted
RFI Reference Guide.pdf PDF
Domestic Hydrant Flow Test 2005 INFORMATIONAL.pdf PDF
43580A106 Revision 1.PDF PDF
43580A111 Revision 1.PDF PDF
W912JD-10-R-0001-0003_Bid Schedule.pdf PDF
43580C101 Revision 2.pdf PDF
43580A107 Revision 2.PDF PDF
43580A602 Revision 1.PDF PDF
43580A108 Revision 1.PDF PDF
BNGR083323 Revision 1.pdf PDF
BNGR142400 Revision 1.pdf PDF
43580S305 Revision 1.pdf PDF
BNGR102113 Revision 1.pdf PDF
43580A513 Revision 1.PDF PDF
43580A001 Revision 1.PDF PDF
A E Bid Schedule 0003.pdf PDF
BNGR074213 Revision 1.pdf PDF
43580C302 Revision 1.pdf PDF
43580R601 Revision 1.pdf PDF
Site Visit Questions with Answers.pdf PDF
43580R702 Revision 1.pdf PDF
43580R500 Revision 1.pdf PDF
43580C003 Revision 1.pdf PDF
43580S003 Revision 1.pdf PDF
43580C102 Revision 1.pdf PDF
RFI Responses - Amendment 2.pdf PDF
43580C101 Revision 1.pdf PDF
43580A107 Revision 1.pdf PDF
43580R701 Revision 1.pdf PDF
43580A109 Revision 1.pdf PDF
New Exhibit D.pdf PDF
43580R700 Revision 1.pdf PDF
Important Information to Offerors.pdf PDF
RFI Reference Guide.pdf PDF
RFI Responses.pdf PDF
Burns and McDonnell's Pre-Proposal Slides for Hangar.pdf PDF
Hangar Site Visit Sign-in Sheets 15 Dec 09.pdf PDF
Specifications_Volume 2.pdf PDF
WD - Heavy - ME20080007 - 06_12_2009.pdf PDF
Sourcce Selection Participation Agreement - Kraus.pdf PDF
Source Selection Participation Agreement - Busch.pdf PDF
WD - Building - ME20080001 - 10_23_2009.pdf PDF
Exhibit A Hangar.pdf PDF
Exhibit C Hangar.doc DOC document
Exhibit F Hangar.pdf PDF
Section 6 - Electrical.pdf PDF
W912JD-10-R-0001_Solicitation.pdf PDF
WD - Highway - ME080010 - 06_12_2009.pdf PDF
Section 1 - General.pdf PDF
Specifications_Volume 1.pdf PDF
Show all 50

Replace KC-135 Maintenance Hangar has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT QUESTIONS

SOLICITATION # W912JD-10-R-0001

REPLACE KC-135 MAINTENANCE HANGAR

15 DECEMBER 2009

Question 1: Section 011100, par. 1.05 and 1.06: Clarify government furnished items. Clarify Government Purchase Orders.

Answer: There are no owner preordered items and no owner-furnished equipment. Delete these two paragraphs.

Question 2: Are desks and tables shown included in the contract? Is the furniture Government furnished and installed?

Answer: Furniture is Government furnished and installed.

Question 3: Provide and/or clarify specs for the epoxy floor. Is there a flooring option for the hanger bay?

Answer: Floor finish specification is being reviewed. This question will be addressed in response to RFI 004.

Question 4: Clarify liquidated damages versus the delivery dates.

Answer: The performance period for the base bid items (CLIN 0001 and 0002) and for Option Items 0001, 0002 & 0004 (CLIN 0003, 0004 & 0006), if awarded, is 540 days from Notice to Proceed.

Liquidated damages on those items would be assessed on day 541.

The performance period for Option Items 0003 and 0005 (CLIN 0005 and 0007), the demolition work, is 180 days from Notice to Proceed for those items

. If these option items are awarded, demolition work will not commence until the new hangar is complete and the Government has removed furniture and equipment from existing hangar.

Question 5: Are as-builts of the test cell foundation available?

Answer: This is being researched.

Question 6: Clarify the use of temporary utilities including natural gas. Clarify the temporary facility and utilities reference electricity and water. Will natural gas be provided by the Government? Section 015 - 100 states natural gas is provided by the Government

Answer: Currently under review.

Question 7: Clarify the fence enclosure requirements. Are watchmen and a watchmen’s office required?

The plans show an enclosure fence around the project site. It also identifies a watchmen’s office with temporary phone. Will the contractor have to provide their own security/guards?

Answer: The fence enclosure serves several purposes. It helps the Contractor to preserve the safety and security of his work site; it also prevents unauthorized access to airfield space and helps to reduce FOD.

There is restricted access to the ANG Base as a whole; there is a second restricted access to the work area

(Gate 4), which must be secure at all times. However, it is the Contractor’s responsibility to provide for the safety and security of his job site at all times – that is, during working and non-working hours alike.

Question 8: Clarify the bidding schedule regarding allowances.

Answer: This refers to a note on the bid schedule in the specifications (Volume 1) which has caused some uncertainty. Delete this entire page.

Question 9: Are there any site issues?

Answer: It’s unclear what information is being sought. Please use RFI to clarify.

Question 10: Will the Test Cell be removed prior to construction?

Answer: Probably not. USPFO for Connecticut will be soliciting a contract to disassemble the hush house, transport it to Bradley Field and reassemble it on a pad. Their contract to construct the pad has been suspended for the winter. They expect completion of the pad by June and do not want hush house components on site until then. It is reasonable to presume that the contractor hired to disassemble the hush house will be required to coordinate with the contractor building the hangar.

Question 11: Are the partitions furnished by the Government?

Answer: No. Partition walls are part of the contract.

Question 12: Are the windows fire rated?

Answer: This is being researched.

Question 13: Clarify fall protection.

Answer: This is being researched.

Question 14: How does the joint venture work with the small business set aside?

Answer: In general, each partner in a joint venture must qualify as a small business. If you have more particular questions, consult with the Small Business Administration. www.sba.gov/

Question 15: What should we expect for a time frame between the award date and the notice to proceed?

Answer: One can infer from the bid acceptance period that we expect to make contract award within 75 days of bid due-in date. Past experience shows NTP is customarily issued anywhere from no less than 10 to no more than 30 days after award.

http://www.sba.gov/�