RFI Reference Guide.pdf

PDF 55 KB Posted

Attached to
Replace KC-135 Maintenance Hangar Federal contract opportunity
Solicitation number
W912JD-10-R-0001
Issued by
Department of the Army Maine Army National Guard

About this file

RFI Reference Guide

View the file

Other files for this federal contract opportunity

Other files attached to Replace KC-135 Maintenance Hangar, newest first.
File Type Posted
RFI Reference Guide.pdf PDF
Domestic Hydrant Flow Test 2005 INFORMATIONAL.pdf PDF
43580A106 Revision 1.PDF PDF
43580A111 Revision 1.PDF PDF
W912JD-10-R-0001-0003_Bid Schedule.pdf PDF
43580C101 Revision 2.pdf PDF
43580A107 Revision 2.PDF PDF
43580A602 Revision 1.PDF PDF
43580A108 Revision 1.PDF PDF
BNGR083323 Revision 1.pdf PDF
BNGR142400 Revision 1.pdf PDF
43580S305 Revision 1.pdf PDF
BNGR102113 Revision 1.pdf PDF
43580A513 Revision 1.PDF PDF
43580A001 Revision 1.PDF PDF
A E Bid Schedule 0003.pdf PDF
BNGR074213 Revision 1.pdf PDF
43580C302 Revision 1.pdf PDF
43580R601 Revision 1.pdf PDF
Site Visit Questions with Answers.pdf PDF
43580R702 Revision 1.pdf PDF
43580R500 Revision 1.pdf PDF
43580C003 Revision 1.pdf PDF
43580S003 Revision 1.pdf PDF
43580C102 Revision 1.pdf PDF
RFI Responses - Amendment 2.pdf PDF
43580C101 Revision 1.pdf PDF
43580A107 Revision 1.pdf PDF
43580R701 Revision 1.pdf PDF
43580A109 Revision 1.pdf PDF
New Exhibit D.pdf PDF
43580R700 Revision 1.pdf PDF
Important Information to Offerors.pdf PDF
Site Visit Questions with Answers.pdf PDF
RFI Responses.pdf PDF
Burns and McDonnell's Pre-Proposal Slides for Hangar.pdf PDF
Hangar Site Visit Sign-in Sheets 15 Dec 09.pdf PDF
Specifications_Volume 2.pdf PDF
WD - Heavy - ME20080007 - 06_12_2009.pdf PDF
Sourcce Selection Participation Agreement - Kraus.pdf PDF
Source Selection Participation Agreement - Busch.pdf PDF
WD - Building - ME20080001 - 10_23_2009.pdf PDF
Exhibit A Hangar.pdf PDF
Exhibit C Hangar.doc DOC document
Exhibit F Hangar.pdf PDF
Section 6 - Electrical.pdf PDF
W912JD-10-R-0001_Solicitation.pdf PDF
WD - Highway - ME080010 - 06_12_2009.pdf PDF
Section 1 - General.pdf PDF
Specifications_Volume 1.pdf PDF
Show all 50

Replace KC-135 Maintenance Hangar has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Number Number of Questions Question Topics

001 2 Pipe size; confirm interconnecting pipe between compressed air equiment is all 3".

002 4 No specifications for transformer and 15KV wire; who is providing transformer and 15KV cable; will specifications follow?

003 1 No specifications for the interior fall protection over KC-135 please provide.

004 3 No specifications for epoxy flooring; underground utilities abandoned or removed; size of foundation and thickness not shown please advise.

005 2 Where to locate base standards; drawing showing Sign Type ES1?

006 1 Conflict between bid schedule provided by A&E and solicitation evaluation factors.

007 2 Type of screed machine allowed; guidance for intent and design of interior fall protection system.

008 1 Request to have Kwik-Wall Model VL-2 be approved as an equal to products specified in 083500.

009 5 Request to have Wislon Doors approved as an equal for hangar doors; clarify if all doors receive operators; what material for rated counter shutter

rm. 105; which doors receive motor on pg. 6, 2.07, G, 5; both types of sensors on pg. 6, 2.07, H?

010 8 Termite Control required for project; barrier recommended or required; MTV for asphalt paving required; test strip required; permits required for project; extent of demolition by contractor; information on foundation depth and size of 499 walls and footers for demo; detail 15/C-3-2.

011 1 Confirm concealed within masonry walls and 18: above the hangar floor are both not within the classified environment nor in hangar which will allow EMT to be used to feed equipment in hangar.

012 1 Possibility of using past performance questionnaires from RTI proposal.

013 1 Is offer guarantee on SF24 and what percentage is required.

014 10 Section 074113 (Metal Roof Panels) - 5 questions/clarifications; Section 074213 (Metal Wall Panels) - 2 questions; Section 133419 (Metal

Building Systems) - 3 questions/clarifications.

015 1 Possibility of having another site visit.

016 2 Advise if crane, crane runways or both are part of contract; advise where or if steel roof deck specified is expected to be used.

017 5 Will General Contractor (GC) furnish and install lockers; Is GC hiring a security officer; If base is shut down to civs will GC be compensated for costs and time added to performance; Drawing S-001 note E3b states GC responsible to hire engineer to redisgn if foundation doe3sn't meet requirements, will they be compensated; Calrify Drawing S-003 Notes 1, 2, 3 missing/incomplete.

018 5 Specification for room finish; concrete seal coat location; heat piping joint intersection detail use M-503 drawing or S-002 and M-504; do they carry all concrete bases under Section 033000; use thickened edge at all wall sections including interior section "B" on drawing S302.

RFI Number Number of Questions Question Topics

019 1 No gas lines indicated on drawings C-104 and C-108 so distances to tie-ins cannot be determined.

020 1 Desire to add Metallic Building Company to the list of approved building manufacturers.

021 1 Desire to have Canton Elevator added to the list of acceptable elevator systems.

022 6

Forward static, residual and flow information for sprinkler system; what is the rating for upstream fittings; is it our intent to have Fire Protection contractor paint the fire protection piping per division 9; no specification for the kitchen ventilation hood that fire protection contractor is responsible for providing chemical fire suppression system; are surge arrestors to be in compliance with ETL-02-15 with minimum working pressure rating of 275 psi; what is quantity , size, and type of the owner supplied extinguishers.

023 1 Must a subcontractor be licensed in the State of Maine to perform duties on this project.

024 3 Stair finishes - 1. stairs to receive rubber tread/risers with VCT on landings or rubber on landings, 2. resilient stringers to be used, 3. stair accessories specified or meet specifications; will a specification be provided for Entry Mats (EFM); will specification be provided for Electrostatic Discharge Tile (ESD).

025 6

Is Section 033000 Page 11 paragraph 2.06 item B the product to be used for areas shown as Conc/H on drawing A-601; are rooms to be concrete with Non-Metallic shake on hardener or liquid sealer/hardener; no plans or specifications reagrding thickness of 2nd level concrete floor slab; concrete sidewalk design detail - confirm thickness, curb/edge detail, construction and contraction for joint details and spacing, reinforcement detail, sealer requirements, concrete strength; design data on exterior concrete pads - confirm 6" thickness, edge detail, reinforcing requirements, concrete strength; confirm what the existing apron thickness is for Option #0004.

026 5

Confirm door numbers 111c, 139d, 151d, 162d, 163a, and one 4' x 4' counter shutter at ISO tool room 105 are fire doors; in door schedule what does "B" mean under Label B-90; Are any doors chain operated or all electric; for what do we require powder coat paint baked thermoset finish, gray is standard baked color; Page 6 under 2.06, paraggraph H asks for both photo electric eyes and 4-wire fail safe edges, do we really want both and do we want ADA-audible alarm and strobe lights on all electric doors.

027 1 Will contractors receive information regarding hush house structure and foundation.

028 1 Aluminum supplier blast design information.

029 8

Specifications for second floor slab; Fall Arrestor System aceptible for general contractor to install; Will in-hangar fall protection system by provided by Government or contractor (if contractor provide specification); Specification for recessed entry mats; Monorail cranes provided by Government or contractor (if contractor provide specification); Drawing A-507 details "see structural drawings for stair details" will they be provided; No dollar amount specified for carrying allowances on banded grating openings; Specifications for carpeting and electrostatic discharge tile.

030 1 Location and quantity of drains from the door track to the trench drain are not found on drawings.

Sheet1