STATEMENT OF WORK
SHANGR – ROAD ROCK PURCHASE AND DELIVERY
SMOKY HILL RANGE SITE, SALINA, KS (KANSAS ANG)
31 Jul 2019
SW-1 LOCATION: Smoky Hill National Guard Range Site, 8429 West Farrelly Road Salina, Kansas, 67401. Arrangements for entrance onto Smoky Hill must be made by contacting MSgt Glen Godsey at
(316) 759-8579 or MSgt Robert Thor Taylor at (316) 759-8552 between the hours of 7:30 a.m. and 4:00 p.m., Monday through Friday.
SW-2 SCOPE OF WORK: The work covered in this contract consists of furnishing all labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the work described in paragraph SW-3.
SW-3 SUMMARY OF WORK: This work entails furnishing all necessary management, supervision, labor, materials, and equipment to supply 1805 tons of road rock for delivery and end dumped (at a specified location) with a minimum of 10 deliveries per day. 400 ton of 2” washed rock will need to be delivered 22 miles (round trip) from the front gate access. 910 ton of SS-5 rock will need to be delivered 12 miles (round trip) from the front gate access. 495 ton of SS-5 rock will need to be delivered 20 miles (round trip) from the front gate access. These deliveries will be under the direct supervision of Smoky Hill ANGR Staff. The contractor shall ensure total for all amounts supplied does not exceed the amount noted in the contract line item.
SW-4 SPECIFICATIONS - Road Rock Specifications
1. Approximately 1405 ton of 1 to1 1/2” road rock, per section 1112 (Aggregates of Surfacing or Subgrade Modification for County Secondary Roads) of KDOT standard specifications:
a. SS-5 Crushed Stone 1 ½” 0-5% Gradation after removal of deleterious substances.
b. Deleterious substances - Passing No. 200 Mesh Sieve 8.0, Sticks (wet) 2.0, Clay Lumps & Friable Products 5.0.
2. Approximately 400 ton of 2” road rock, per section 1104 (Aggregates for aggregate base construction) of KDOT standard specifications:
c. AB-3 Crushed Stone 2” 0 Gradation after removal of deleterious substances.
d. Deleterious substances - Passing No. 200 Mesh Sieve 8.0, Sticks (wet) 2.0, Clay Lumps & Friable Products 5.0.
SW-5 CODES & STANDARDS: All work performed under this contract shall be in accordance with federal, state and local codes & standards, as well as widely accepted industry standards, including but not limited to: American Institute of Architects, American Concrete Institute, American Institute of Electrical Engineers, American Institute of Steel Construction, American National Standards Institute, American Society of Heating, Refrigerating and Air-Conditioning Engineers, American Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National Electric Code, American Welding Society, Brick Institute of America, Building Officials and Code Administrators, Federal Aviation Administration, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the Kansas DOT. Standard specification. Additionally, all requirements of the Kansas
Department of Health must be satisfied in their entirety for any work performed or materials bought under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply with contract specifications.
SW-6 UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction. Contact Smoky Hill ANGR civil engineer personnel (316-759-8579) to request dig permit.
SW-7 CALL BEFORE YOU DIG: Contact Smoky Hill ANGR civil engineer personnel (316-759-8579) to request dig permit. All contractors shall be responsible for maintaining all markings throughout construction period.
SW-8 MATERIALS: The materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, which ever is more stringent. Certificates of compliance and Technical Data Sheets are required for all materials supplied.
SW-9 SITE INSPECTION: The Contractor is encouraged prior to time of Bid Opening to inspect the site, to be fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s) which was (were) existing at the time proir to bid date.
SW-10 BASE ACCESS: The contractor shall be granted access to Smoky Hill ANGR to complete this project. All other areas are off limits. The Government reserves the right to deny access to any person, with no consequence to the contract. The contractor will adhere to strict local safety protocol governing transitioning from main gate to end dump location. Saftey protocol will be discussed upon arrival for the first time. Point of contact will be MSgt Godsey or MSgt Taylor for this safety briefing.
SW-11 SAFETY: Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the commercial contractor. Government employees must comply with AFOSH. All contractors and employees will attend a pre-construction meeting prior to project work beginning.
SW-12 CLEAN-UP: None anticipated.
SW-13 GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the Contractors actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities.