Amendment_0003.pdf

PDF 202 KB Posted

Attached to
Upgrade Lightning Protection System at Selfridge ANGB Federal contract opportunity
Solicitation number
W912JB-18-B-5002
Issued by
Department of the Army Michigan Army National Guard

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Lightning Protection System at Selfridge ANGB, newest first.
File Type Posted
Bid_Opening_Abstract.pdf PDF
Amendment_1.pdf PDF
Synopsis_Upgrade_Lightning_Protection_IFB_2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JB18B5002

F8Y36P8039AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reason for this Solicitation Amendment is due to an update in the Davis Bacon Wage Determination for this project. Please see updated w age determination in this Amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB18B5002

X 9B. DATED (SEE ITEM 11)

27-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2018

CODE

127 MSC - FA6221

43200 MAPLE ST

BLDG 105, RM 16

SELFRIDGE ANGB MI 48045-5213

W912JB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO BIDDERS

IMPORTANT INSTRUCTIONS TO BIDDERS FOR VGLZ 182019: REPAIR BUILDING LIGHTNING

PROTECTION SYSTEM BASEWIDE W912JB-18-B-5002

THIS EFFORT IS A HIGH PRIORITY REQUIREMENT IN SUPPORT OF THE NATIONAL GUARD.

FUNDS ARE NOT PRESENTLY AVAILABLE TO MAKE AWARD. IF FUNDS BECOME AVAILABLE

FOR AWARD, AND PRICES ARE DEEMED FAIR AND REASONABLE, IT IS THE GOVERNMENT’S

INTENT TO MAKE AWARD. THIS IS NOT A COMMITMENT OF FUNDS OR CONTRACT AWARD.

All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.fbo.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at //www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.

TYPE OF ACQUISITION: This acquisition is being conducted under FAR Part 14, Sealed Bidding procedures. It is 100% set-aside for Small Businesses under NAICS 238210 which has a size standard of $15.0M. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price

CONTRACT SPECIALIST: CONTRACTING OFFICER:

Daniel Taliaferro 127 MSC Steven Stocking 127 MSC 43200 Maple St. 43200 Maple St.

Bldg. 105 Room 15 Bldg. 105 Room 15 Selfridge ANGB MI 48045 Selfridge ANGB MI 48045 Telephone: (586) 239-5539 Telephone: (586) 239-4881 Email: daniel.t.taliaferro.mil@mail.mil Email: steven.a.stocking3.mil@mail.mil

QUESTIONS:

All questions/RFI’s should be submitted using Pre-Bid Inquiry Format to BOTH points of contact listed above and must be received no later than THURSDAY, 01 August 2018 at 1 pm local time Questions received after this time may not be answered. All questions and answers will be posted on www.fbo.gov under the solicitation announcement.

1. SCOPE

1.1. You are invited to submit a proposal in response to our Invitation for Bids IFB W912JB-18-B-5002 Project Number VGLZ 182019, at Selfridge ANGB, MI.

1.2. This solicitation is set-aside 100% for small businesses.

2. NOTICE OF PRE-PROPOSAL CONFERENCE

2.1.1. A pre-proposal conference will be conducted on Wednesday, 25 July 2018 at 10:00am for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at 43200 Maple St, Bldg 105, Room 15 Selfridge ANGB, MI 48045 . Interested Contractors are “required” to attend the pre-bid conference. The site visit will be held immediately following the pre-bid conference.

2.1.2. Due to security conditions, all offerors must register to attend this conference and site visit. A Selfridge Base Access Request Form will be included with the solicitation package. Please return the access form at least three (3) days before site visit. Email the form for all attendees to Daniel Taliaferro at the following addresses: daniel.t.taliaferro.mil@mail.mil All attendee’s information, including country of citizenship must be on the form. The sponsor for the site visit is Daniel Taliaferro, telephone number 586-239-5539.

2.1.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site, and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary on the contractor’s part. However, failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-bid conference. This information will be provided to the Base Security Forces who will authorize your entrance to the base.

2.1.4. Visitors must pick up their passes at the installation’s Visitor Center, outside the main entry gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

2.1.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.16.A record of the conference shall be made and furnished to all prospective bidders via posting at http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS AND AMENDMENTS PRIOR TO

DATE SET FOR RECEIPT OF BIDS

3.1. Submit all questions in the format shown below by email to the contracting office at the addresses shown below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Subject Line: Reference No. Solicitation W912JB-18-B-5002 Email: daniel.t.taliaferro.mil@mail.mil and steven.a.stocking3.mil@mail.mil

PRE-BID INQUIRY FORMAT

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry: _______________

From: ______________________________ Company Name: ________________________________

Address:_____________________________________________________________________________

Phone Number: _____________________________ Fax Number:______________________________

Email address: ________________________________________________________________________

Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offeror before the submission of their offer.

3.3. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via email.

3.3.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding.

3.4. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of bids as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Invitation for Bids. All information relating to this IFB, including pertinent changes/amendments and information prior to the date set for receipt of bids will be provided via email.

4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS

4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Invitation for Bid. All information relating to this IFB,ges/amendments and information prior to the date set for receipt of bids will be posted on the following website: http://www.fob.govThis will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons

5. WAGE DETERMINATION

5.1. Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of this solicitation apply:

5.2. Applicable wage rates be found at http://www.wdol.gov/wdol/scafiles/davisbacon/MI91.dvb General Decision Number:. : MI180091 08/03/2018 MI91

6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This IFB does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.

7. REMOVAL OF SECTIONS AT TIME OF AWARD

Sections 00100 and 0004500and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.

8. DISPOSITION OF UNSUCCESSFUL BIDS

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids. The Government will destroy extra copies of unsuccessful bids. No destruction certificate will be provided.

9. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES

It has been determined that all reasonable amounts of electricity and water where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services).

10. EXCEPTIONS

If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.

11. CLAUSES

11.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

11.2. Clauses and provisions in this document may not appear in consecutive order.

12. BIDS SUBMISSION

HAND CARRIED BIDS, AND MAILED IN BIDS ARE THE ONLY ALLOWED METHODS FOR

QUALIFYING FOR THE PUBLIC BID OPENING. BID SUBMISSIONS ON A FORMATTED DISK WILL

ALSO BE REQUIRED ON DAY BIDS ARE DUE. PLEASE INCLUDE A FORMATTED DISK WITH

YOUR BID SUBMISSION. FORMATTED DISK BID DOCUMENTS WILL NOT BE ACCESSED BY THE

GOVERNMENT UNTIL AFTER PUBLIC BID OPENING HAS OCCURED. FILES ON THE FORMATTED

DISK ARE FOR ELECTRONIC RECORDS KEEPING ONLY.

NOTE: IF MAILING IN BID, PLEASE ALLOW ADEQUATE DAYS FOR DELIVERY SO BID MAKES IT

TO 127 MSC BEFORE BID CLOSING TIME. PLEASE MAIL BID TO DAVID BROWN AT THE ABOVE

ADDRESS. MAILED IN BIDS THAT ARE PAST THE 2PM BID OPENING TIME MAY NOT BE

CONSIDERED FOR OPENING. ALTHOUGH NOT MANDITORY, IT IS ENCOURAGED FOR

OFFERORS TO ATTEND THE BID OPENING.

BIDS ARE TO BE RECIEVED NO LATER THAN 2:00 PM EST ON WEDNESDAY, 13 AUGUST 2018.

2. In accordance with FAR Provision 52.214-12, Preparation of Bids, bid package must be completed and hand carried to 127 MSC office prior to the time set for bid closing in paragraph 13A. of the Standard Form 1442. Bid submission in any other manner WILL NOT be accepted.

3. By submission of its bid, the offeror agrees to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable.

4. The formatted disk bid package shall include the following four separate attachments:

a. Attachment 1: Standard Form 1442 with BLOCKS 14-20 completed.

b. Attachment 2: Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee.

c. Attachment 4: Provisions filled-in with required information. 52.204-8, 52.209-7, 52.222-22, 52.223-3, 52.209-7, 252.209-7992

5. Late bids will be handled in accordance with FAR Provision 52.214-7, Late Submissions, Modifications, and Withdrawal of Bids.

6. Disk Formats:

a. The subject line of the formatted disk package shall include the bid number and offeror’s name in the following format: W912JB-18-B-5002: OFFEROR NAME. If multiple disks are required to be submitted, indicate in the subject line that multiple emails will be received using the following format: (Disk 1 of 3), (Disk 2 of 3), (Disk 3 of 3). The following is a sample subject line: SUBJECT: W912JB-18-B-5002 COMPANY XYZ (Disk 2 of 3).

b. The formatted disk shall list the following information:

i. Address of the office specified in Block 7 of the solicitation.

ii. Time and Date specified in for receipt of bid.

iii. Solicitation Number

iv. Name and address of bidder

a. Each complete bid in response to this solicitation must be submitted individually/separately and must be properly identified. Selfridge ANGB, will not be responsible for electronic responses that are not submitted correctly and/or are improperly identified. If you submit an offer under an incorrect solicitation number, your offer may not be considered.

b. Files must be readable using Microsoft Office Word 2013 (or lower) or Adobe PDF (set to minimum 200 dots per inch).

c. DO NOT submit attachments in .ZIP files. Any bid package, or portion thereof, submitted as a .ZIP file may be REJECTED.

d. Do not password protect disks or disk files.

e. To avoid rejection of an offer, vendors must make every effort to ensure their formatted disk submission is virus free. Submissions, or portions thereof, which the automatic system detects the presence of a virus, or which are otherwise unreadable, will be treated as “unreadable” pursuant to FAR 14.406, Receipt of an Unreadable Electronic Bid, and be handled accordingly.

f. Offerors are required to ensure adequate time for Government receipt of the bid submission by the bid closing time.

g. Facsimile transmission of bid is not authorized. Electronic submission of bids will NOT be accepted.

PUBLIC BID OPENING

Date: 13 August 2018 Time: 1400 HOURS EST Location: Selfridge ANGB, MI BUILDING 105, ROOM 43200 Maple St.

Selfridge ANB, MI48045

PLEASE NOTE: 2PM EST IS THE OFFICIAL PUBLIC BID OPENING TIME. Synopsis days and times are only tentative, and should not be considered as actual. ALL dates are subject to change, and changes may be posted to FBO via solicitation amendment(s). All bids are to be deposited in the bid depository box not later than 2PM EST on Wednesday, 13 August 2018 as stated in the Standard Form 1442 Block 13A.

DELIVERING OF BIDS

A bid depository is provided for hand carried, and mailed in bids, and is located at 43200 Maple St., Bldg. 105, 127MSC Conference Room, Selfridge ANGB, MI 48045. Bids must be deposited in the depository on or before the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the base and should allow at least one full hour’s time to accomplish this. See instructions for obtaining access to the base in the Site Visit instructions. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR Part 14.304.

The bid opening will occur at the time and date specified in Block 13 of the SF1442 at insert. All interested contractors and their subcontractors are strongly encouraged to attend the bid opening. The bid due in time will end at exactly 2:00.00 PM EST. www.time.gov will be used as the official time and will be posted in the 127 MSC conference room during bid submission.

No other delivery methods for bids will be accepted. Only hand delivered and mailed in bids deposited in the depository at the 127 MSC office conference room that conform to the bid instructions will be considered for the public bid opening. As instructed in item 1, formatted disk versions are to be included on the day of the public bid opening. The formatted disk versions will not be accessed until after public bid opening. The disk files are for electronic records keeping only. Only bids accompanied with a formatted disk(s) will be accepted. Bids may be rejected if they contain anything other than a formatted disk.

13. OFFERORS QUALIFICATIONS:

To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE RATE DETERMINATION

General Decision Number: MI180091 08/03/2018 MI91

Superseded General Decision Number: MI20170091

State: Michigan

Construction Type: Building

County: Macomb County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 02/09/2018 2 02/23/2018 3 05/04/2018 4 07/20/2018 5 08/03/2018

* ASBE0025-002 06/01/2018

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 31.58 32.32

BOIL0169-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 38.65 26.22

* BRMI0001-001 06/01/2018

Rates Fringes

BRICKLAYER.......................$ 34.18 21.22

TILE FINISHER....................$ 27.94 19.12

TILE SETTER......................$ 34.66 19.12

CARP0687-003 06/01/2018

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold Building)........................$ 32.00 27.82

CARP1045-001 06/01/2018

Rates Fringes

CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 28.60 23.88

CARP1102-002 06/01/2017

Rates Fringes

MILLWRIGHT.......................$ 33.25 32.15

* ELEC0058-001 07/01/2018

Rates Fringes

ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 24.25 12.38 Technician..................$ 35.01 14.08

ELECTRICIAN......................$ 38.73 23.85

ELEV0036-002 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 50.35 32.645

ENGI0324-017 06/01/2017

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 39.89 23.40

GROUP 2....................$ 38.39 23.40

GROUP 3....................$ 36.89 23.40

GROUP 4....................$ 36.59 23.40

GROUP 5....................$ 35.77 23.40

GROUP 6....................$ 34.91 23.40

GROUP 7....................$ 33.94 23.40

GROUP 8....................$ 32.23 23.40

GROUP 9....................$ 23.89 23.40

FOOTNOTES:

Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.

Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane with boom and jib or leads 400' or longer

GROUP 2: Crane with boom and jib or leads 300' or longer

GROUP 3: Crane with boom and jib or leads 220' or longer

GROUP 4: Crane with boom and jib or leads 140' or longer

GROUP 5: Crane with boom and jib or leads 120' or longer

GROUP 6: Regular crane operator, and concrete pump with boom operator

GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher

GROUP 8: Forklift & extend-a-boom forklift

GROUP 9: Oiler

IRON0025-019 06/01/2017

Rates Fringes

IRONWORKER

REINFORCING.................$ 26.57 26.90

STRUCTURAL..................$ 29.99 33.43

IRON0025-022 06/01/2017

Rates Fringes

IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 29.99 33.43

LABO0259-002 08/01/2017

Rates Fringes

LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 27.86 12.87

LABO0334-005 06/01/2018

Rates Fringes

LABORER: Landscape & Irrigation

GROUP 1.....................$ 20.52 6.90

GROUP 2.....................$ 18.52 6.90

CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)

GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO1191-002 06/01/2017

Rates Fringes

LABORER

Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;

Pipelayer; Sandblaster......$ 24.35 20.42

PAIN0022-003 06/01/2015

Rates Fringes

PAINTER: Brush and Roller.......$ 26.06 17.66 PAINTER: Drywall Finishing/Taping.................$ 27.05 18.26 PAINTER: Spray..................$ 26.86 17.66

PAIN0357-002 06/01/2017

Rates Fringes

GLAZIER..........................$ 31.72 18.71

PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;

provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.

PLAS0067-001 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07

PLAS0067-004 04/01/2014

Rates Fringes

PLASTERER........................$ 30.63 14.07

* PLUM0098-001 06/05/2018

Rates Fringes

PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 39.77 27.13

PLUM0636-003 06/05/2017

Rates Fringes

PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 40.41 29.35

ROOF0149-001 06/01/2017

Rates Fringes

ROOFER...........................$ 31.40 21.88

SFMI0704-001 01/01/2018

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 43.20 25.72

SHEE0080-004 07/01/2017

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation;

Excluding HVAC System Installation)....................$ 32.98 32.34

TEAM0247-002 06/01/2017

Rates Fringes

TRUCK DRIVER

GROUP 1

Dump; Flatbed; Pickup......$ 26.29 0.60+a

GROUP 2

Semi.......................$ 26.44 0.60+a

GROUP 3

Lowboy.....................$ 26.54 0.60+a

PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.

FOOTNOTE:

a. $438.45 per week, plus $64.50 per day.

SUMI2011-016 02/01/2011

Rates Fringes

INSTALLER - OVERHEAD DOOR........$ 27.98 0.00

IRONWORKER, ORNAMENTAL...........$ 18.48 7.93

TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 1.18

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION