QASP_Portable_Toilets.pdf

PDF 30 KB Posted

Attached to
Rental of Portable Toilets and Hand Washing Stations
Solicitation number
W912JB-16-T-1917
Issued by

About this file

Quality Assurance Surveillance Plan

View the file

Other files

File Type Posted
Amend_0002_SF30_Answers _Extension.pdf PDF
Portable_Toilet_RFQ.xlsx XLSX spreadsheet
Amend_1_Questions.pdf PDF
Portable_Toilet_RFQ.xlsx XLSX spreadsheet
WDOL.pdf PDF
Portable_Toilet_RFQ.xlsx XLSX spreadsheet
Instructions_to_Offerors.pdf PDF
Portable_Toilet_SOW.pdf PDF
Reps_and_Certs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

Introduction

This quality assurance surveillance plan (QASP) is pursuant to the requirements the rental of portable toilets, portable showers and portable hand washing stations. This plan sets forth the procedures and guidelines used to ensure the required performance standards or services levels are achieved by the contractor.

Purpose

The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

Performance Management Approach

This QASP will define the performance management approach to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated are achieved.

Performance Management Strategy

The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control program (QCP). The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS.

The Contracting Officer

The contracting officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Government Representative. The KO will designate one Government Representative as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO. The KO will designate a Government Representative to assist in administering the contract. Any changes the contractor deems may affect contract price, terms or conditions shall be referred to the KO.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are

Random monitoring -- randomly sampling a statistically significant sample

100% Inspection – evaluates all outputs

Periodic (Monthly) Inspection –a comprehensive evaluation of selected outputs in a certain time period

Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction.

Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Acceptable Quality Levels

The acceptable quality levels (AQLs) a r e included in the Quality Assurance Surveillance Plan to assess contractor performance. The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

The government will not provide payment for services not received IAW SOW.

General Deliverables Performance

Standard Acceptable Quality

Level Surveillance Method and Frequency

Delivery of equipment IAW SOW Provide on required date

100% Inspection

Delivery of equipment IAW SOW Provided to correct location

100% Inspection

Cleaning IAW SOW Cleaned per date requested

Random

Pick up of equipment IAW SOW Provide on required date

100% Inspection

CMRA IAW PWS NLT October 31 of each calendar year

100% Inspection

File details come from the government source that posted it. Updated .