QASP_Portable_Toilets.pdf
PDF 30 KB Posted
- Solicitation number
- W912JB-16-T-1917
About this file
Quality Assurance Surveillance Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_0002_SF30_Answers _Extension.pdf | ||
| Portable_Toilet_RFQ.xlsx | XLSX spreadsheet | |
| Amend_1_Questions.pdf | ||
| Portable_Toilet_RFQ.xlsx | XLSX spreadsheet | |
| WDOL.pdf | ||
| Portable_Toilet_RFQ.xlsx | XLSX spreadsheet | |
| Instructions_to_Offerors.pdf | ||
| Portable_Toilet_SOW.pdf | ||
| Reps_and_Certs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
Introduction
This quality assurance surveillance plan (QASP) is pursuant to the requirements the rental of portable toilets, portable showers and portable hand washing stations. This plan sets forth the procedures and guidelines used to ensure the required performance standards or services levels are achieved by the contractor.
Purpose
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
Performance Management Approach
This QASP will define the performance management approach to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated are achieved.
Performance Management Strategy
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control program (QCP). The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS.
The Contracting Officer
The contracting officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Government Representative. The KO will designate one Government Representative as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO. The KO will designate a Government Representative to assist in administering the contract. Any changes the contractor deems may affect contract price, terms or conditions shall be referred to the KO.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are
Random monitoring -- randomly sampling a statistically significant sample
100% Inspection – evaluates all outputs
Periodic (Monthly) Inspection –a comprehensive evaluation of selected outputs in a certain time period
Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction.
Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Acceptable Quality Levels
The acceptable quality levels (AQLs) a r e included in the Quality Assurance Surveillance Plan to assess contractor performance. The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
The government will not provide payment for services not received IAW SOW.
General Deliverables Performance
Standard Acceptable Quality
Level Surveillance Method and Frequency
Delivery of equipment IAW SOW Provide on required date
100% Inspection
Delivery of equipment IAW SOW Provided to correct location
100% Inspection
Cleaning IAW SOW Cleaned per date requested
Random
Pick up of equipment IAW SOW Provide on required date
100% Inspection
CMRA IAW PWS NLT October 31 of each calendar year
100% Inspection
File details come from the government source that posted it. Updated .