Control No: F8Y36P4142A001
Justification for an Exception to Fair Opportunity
1. Contracting Activity:
127 MSC
43200 Maple Street Bldg 105, Rm 16 Selfridge ANG Base MI 48045
2. Description of Action:
a. Requirement: Replace Exterior Sheathing/ Gypsum Board on Bldg. 570
b. Type: Firm Fixed Price
c. Contractor: FutureNet Group Inc.
3. Description of Supplies/Services: This sole source firm fixed price order is to be written as a logical follow on to Task Order #W912JB-11-D-4006-0008. The contractor shall remove sheathing on all elevations of the control tower and replace with new 5/8s dens glass. The contractor shall also remove the existing damage interior gypsum board and abate accompanying mold. Wall board not to exceed 2500 sq ft feet in building 570 Control Tower. The Contractor is also to remove all existing interior insulation and replace with R-22 Stone Wall insulation as specified.
4. Identification of the exception to fair opportunity (see 16.505(b) (2) (i) (C)) and the supporting rationale, including a demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the exception cited. If the contracting officer uses the logical follow-on exception, the rationale shall describe why the relationship between the initial order and the follow-on logical (e.g., in terms of scope, period of performance, or value): A logical follow-on task order to the existing MATOC IDIQ contract is in the government’s interest and ensures economy efficiency, by tying together the existing project with the new scope of work. These new work elements need to be successfully completed, to facilitate the proper installation of the Exterior Insulation Finishing System (EFIS) which was contracted in the original order. The work required by the follow on task order is to be accomplished concurrently with the current task order. The new wok includes the construction of an entirely new substrate for the EFIS product to be constructed onto. A single contractor and labor force performing both projects, ensures proper coordination of work and a reduction in labor and equipment costs. In addition, the current general contractor is already onsite which reduces mobilization charges, as the same equipment will be utilized for both projects. Concurrent work under a follow-on task order also mitigates potential delay costs associated with the original task order. All Selfridge Vertical MATOC awardees were given a fair opportunity to be considered for the
STARRETT.JEREMY.LY
NN.1096331750
Date:
original task order as all were issued solicitation # W912JB13R4018 on 25 July 2013.
This solicitation resulted in the award of delivery order #W912JB-11-D-4006-0008.
5. A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable. A price analysis was conducted and it is anticipated that the cost to the Government will be fair and reasonable. Reasonableness of proposed price was established in accordance with FAR 15.404 (b) (2) (v) Comparison of proposed prices with independent Government cost estimates, FAR 15.404 (b) (2) (vi):
comparison of proposed prices with prices obtained through market research for the same or similar items, and 15.404. (b)(2)(vii).
6. Any other facts supporting the justification: N/A
7. A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. N/A. Any future construction acquisitions with exceptions to fair opportunity will be justified on a case by case basis based on the particulars of those acquisition scenarios.
8. The contracting officer’s certification that the justification is accurate and complete to the best of the contracting officer’s knowledge and belief.
I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Signature:
Typed Name: JEREMY L. STARRETT Title: Contracting Officer
9. Evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government’s minimum needs or requirements or other rationale for an exception to fair opportunity) and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel
I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief
ANDERSON.MICHAEL.DWAIN.12304
86790
Digitally signed by ANDERSON.MICHAEL.DWAIN.1230486790
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=ANDERSON.MICHAEL.DWAIN.1230486790
Date: 2014.06.03 11:48:55 ‐04'00'
Date: 3 +VOF 2014
Typed Name: MICHAEL D. ANDERSON Title: Contracting Officer’s Representative
Signature: .JOHN.1094980131
(10) A written determination by the approving official that one of the circumstances in (b) (2) (i) (A) through (E) of this section applies to the order.
Based on the foregoing justification, I hereby approve this exception to fair opportunity and determine that the exception under FAR 16.505(b)(2)(i)(C) applies to this order.
Digitally signed by
MITCHELL.DARRYL.JOHN.1094980131
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=MITCHELL.DARRYL.JOHN.1094980131 Date: 2014.06.03 17:01:48 -04'00'
Typed Name: DARRYL J. MITCHELL Title: Director, 127th MSC Contracting Division
CONCURRENCE:
Date: 3 Jun 2014
STOKES.JAMES.E
Digitally signed by
STOKES.JAMES.ELBERT.1096215793
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, LBERT.1096215793 cn=STOKES.JAMES.ELBERT.1096215793 Date: 2014.06.06 09:15:57 -04'00'
Typed Name: STOKES, JAMES E.
Title: COL MIANG, USFPO-MI
Date:
MITCHELL.DARRYL