Statement of Requirement rockwall purchase.docx

DOCX document 27 KB Posted

Attached to
Climbing Wall and Recurring Annual Service
Solicitation number
W912JA-24-Q-10CS
Issued by

About this file

This document is a Statement of Requirement (SOR) for a 25-foot mobile rock climbing wall with auto belay capability on a dual-axle trailer. The wall will have 120 climbing holds and be capable of supporting climbers from 45 to 250 pounds. The trailer will include features such as hydraulic auto-belay, speed harnesses, heavy-duty jacks, and a 12V DC electric braking system.

The government is conducting market research to potentially procure the climbing wall and annual recurring service maintenance. This is not a solicitation, and no contract will be awarded based on this research. The government is interested in responses from large and small businesses, including various socioeconomic categories, to provide information on their capabilities to provide similar services. Respondents should provide details on their company, business size, small business status, teaming arrangements, and any recommendations or concerns. Responses are due by June 20, 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Requirement (SOR)

1. General Information

Mobile auto belay 25’ foot rock wall on dual axel trailer for use at community events for special engagements for the 22nd RRB recruiting efforts throughout the state to capture leads and enlistments. This trailer will include 4 sides with 120 climbing holds and auto belay capable of holding approximately 45 lbs. up to 250 lbs. mounted on a heavy-duty mobile trailer with approximately 2.5-inch tongue with electronic brake controls and three (3) heavy duty jacks.

1.1.

CLIN 0001: Mobile/Stationary Rockwall; 4 each.

Specifications:

Approximately 25’ vertical mobile climbing wall on a dual axel trailer
Climbing Surface area approximate 320 sq. ft with 120 pre-installed handholds
Climbing Surface Materials: Lightweight, non-abrasive fiberglass UV resistant gel coat
Four (4) button activated horns at the top.
Four (4) station hydraulic Auto-belay routes
Eight (8) speed harnesses (approximately minimum 45- maximum 250lbs)
Four (4) auto locking carabineers/swivels
Three (3) Heavy duty Jacks with wheels & Fenders
Trailer has class 4, 2.5-inch ball coupler hitch for max gross vehicle weight of 10,000pounds
Approximate Travel Height/-Travel Width: height 9’, width 8’, with overall travel length27’, including the trailer tongue.
One (1) handhold wrench
Standard RV 7-way towing plug 12-volt DC electric braking system -1 full size heavyduty spare tire with mounting bracket and four (4) Heavy duty wheels and Fenders

CLIN 1001: Option Year 2 climbing wall annual service and refresher training; One (1) year.

CLIN 2001: Option Year 3 climbing wall annual service and refresher training; One (1) year.

CLIN 3001: Option Year 4 climbing wall annual service and refresher training; One (1) year.

CLIN 4001: Option Year 5 climbing wall annual service and refresher training. One (1) year.

2. Delivery, Inspection and Acceptance

2.1. Place of Delivery: 1750 Congressman Dickinson Drive, Montgomery AL 36109, POC: SFC David Taylor 3342746323 or david.t.taylor.mil@army.mil

2.2. Required Onsight Training at the time of delivery for employees, to include first annual service.

2.3. Inspection and acceptance will occur at time of delivery by a government representative. A comprehensive bill of lading or delivery receipt shall accompany all deliverables that details, at minimum, all serial numbers associated with the requested trailer and internal equipment.

Warranty

All equipment shall have the standard manufacturer’s warranty. The Contractor shall warranty all items delivered and ensure all items are free from defects in material and workmanship under normal use and service. Additionally, without charge, repair or replace any equipment found to be defective in material or workmanship provided said equipment has been operated within standard procedures and instructions and such defects are not due to abuse, misuse or Acts of God.

One (1) Year Warranty with first year servicing included. Warranty starts from the date of delivery and acceptance.

Documentation The contractor shall provide all owner’s manuals, service manuals and any other manufacturer documentation that accompanies the purchase of this item. If any equipment installed has its own service and owner’s manual these will also be provided by the contractor.

File details come from the government source that posted it. Updated .