Statement of Requirement AT FY24 Shower Trailers v1.pdf
PDF 147 KB Posted
- Attached to
- SHOWER TRAILERS RENTAL
- Solicitation number
- W912JA-24-Q-102J
About this file
This document is a Statement of Requirement (SOR) for mobile shower trailers to support the FY24 877th Engineer Battalion Annual Training operations at the Clarke Range Complex in Alabama. The Alabama Army National Guard requires three 8-stall (24 shower heads) mobile shower trailers for a 7-day period from June 1-7, 2024. The shower trailer rental includes delivery, setup, fresh water system, fresh water service, grey water removal, initial propane, and required maintenance. The trailers must be capable of operating on generator power. The government will inspect and accept the trailers upon delivery, and the contractor is responsible for on-site maintenance, fresh water resupply, and grey water removal.
The related federal contract opportunity is a Sources Sought Notice/Request for Information for small business sources who can provide the required mobile shower trailers. Interested parties must submit company information, including business size, small business type, point of contact, and description of services by May 8, 2024. This is for planning purposes only, and no solicitation will be issued at this time.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALABAMA ARMY NATIONAL GUARD
877th ENGINEER BATTALION
4991 NEWBURG ROAD
HALEYVILLE, ALABAMA 35565
REPLY TO
ATTENTION OF
NGAL-ACA 17 April 2024
Statement of Requirement (SOR)
1. General Information
New requirement for mobile shower trailers to support FY24 877th Engineer Battalion Annual Training operations. Shower trailers will serve to support annual training operations on Clarke Range in a field enviroment. There will be approximately 330 PAX conducting operations at three separate trainnig sites. No other personal hygiene facilities are currently operational or availble. The closest operational shower facilities are located on Fort McClellan Training Center in the barracks buildings approximately 15 miles from the training bivouac locations.
1.1. CLIN0001: Qty: three, eight stall (24 shower heads), mobile shower trailers
1.2. Specifications:
The shower trailer pricing includes rental, delivery, setup, fresh water system, fresh water service, grey water removal, intitial propane and any required maintenance.
Pricing based on grey water removel being approximately 10 miles from bivouac sites and fresh water access approximately 5 miles from bivouac sites. Power must be provided by generators.
2. Delivery, Inspection and Acceptance
2.1. Place of Delivery: Clarke Range Complex (Gate #3 Road, Building #8416, Clarke Range Complex, Alabama) Bivouac sites (Ranges B51, B52 and B68)
2.2. Inspection and acceptance will occur at time of delivery by a Government representative (Supply NCOs for each unit). A comprehensive bill of lading or delivery receipt shall accompany all deliverables that details, at minimum, all serial numbers associated with the requested trailer and internal equipment. The Contractor will be responsible for all set up, on site maintenance, fresh water re-supply and grey water removal. This equipment will be utilized for a period not to exceed 7 days, Jun 1-Jun 7.
3. Warranty
3.1. All equipment shall have the standard manufacturer’s warranty. The Contractor shall warranty all items delivered and ensure all items are free from defects in material and workmanship under normal use and service. Additionally, without charge, repair or replace any equipment found to be defective in material or workmanship provided said equipment has been operated within standard procedures and instructions and such defects are not due to abuse, misuse or Acts of God.
4. Documentation
4.1. The contractor shall provide all owner’s manuals, service manuals and any other manufacturer documentation that accompanies the purchase of this item. If any equipment installed has its own service and owner’s manual these will also be provided by the contractor.
File details come from the government source that posted it. Updated .