BRKR_112005_100__Drawings.pdf
PDF 13 MB Posted
- Solicitation number
- W912JA-18-B-5001
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Signed_Abstact_SF-1409.pdf | ||
| Addendum_2.pdf | ||
| Request_of_Information_10_July_2018.rtf | RTF text file | |
| W912JA-18-B-5001-0001_SF1442.pdf | ||
| ADD_1.pdf | ||
| RFI__Responses.pdf | ||
| Request_of_Information_12_June_2018.rtf | RTF text file | |
| W912JA-18-P-5001_Repair_Base_Pavements_Phase_II.pdf | ||
| BRKR_112005_100__Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.0
Title Sheet & Index to Drawings
Ph as e
II
Re pa ir
Ba se
P av em en ts
7t h
A ir
Re fu el in g W in g
Bi rm in gh am , A
L
13076.01/BRKR112005
August 2017
DCD
DCD/FEL
Phase II - Repair Base Pavements
BRKR 112005
Birmingham IAP (ANG), AL
Option #1
Schedule of Bid Options:
Mill & Overlay Building 550 Parking Lot
Option #2 Mill & Overlay Conte Loop Road
Option #3 Mill & Overlay Parking Lot North of Building 200
Option #4 Mill & Overlay Parking Areas at Building 610 & 620 (Part A)
Option #5 Mill & Overlay Parking Areas at Building 610 & 620 (Part B)
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Using Agent
Civil:Architect:
Design Team: Consulting Engineers: Index to Drawings:
T1.0 Title Sheet & Index to Drawings
Civil:
C1.0 Base Map + Key Plan
C2.0 Site Plan
C3.0 Site Plan
C4.0 Site Plan
C5.0 Site Plan
C6.0 Site Plan
C7.0 Site Plan
C8.0 Site Plan
C9.0 Site Plan
C10.0 Site Plan
C13.0 Details
C11.0 Round About Plan and Details
C12.0 Details
Reference Plan (Not to Scale)
Option #6 Mill & Overlay SegMag
L1.0 Landscape Plan, Schedule & Details
Landscape:
PA1.0 Phasing Plan
Phasing & Alternates:
PA2.0 Bid Option Diagram
No. Revision Date
Dwarf Youpon Holly (18)
Knockout Roses (8)
Natchez Crepe Myrtl (1)
Pavers (Typical) See Civil
Pavers (Typical) See Civil
See Civil Drawings for Paving Layouts and Requirements not Depicted on the Sheets
River Rock Mulch on landscape fabric (see specification section 32 9300.
Contractor Shall Provide 6' Wide Stip of Sod Along all edges of new roundabout unless noted otherwise.
Contractor to seed all other areas adjacent to the roudabout where existing grass is damaged during construction.
Contractor to Sod Entire Island
Seed as Required
Seed as Required
Seed as Required
Row
On Center Spacing 2" M in
Set Plant At Original Depth River Rock Mulch
Existing Grade
Existing Soil Remove Container and Lightly Scarify Root and Soil Mass Mound and Lightly Compact Top Soil Mixture
Plant Mix
Plant Pit Shall Be Min. 6" Wider Than Ball Plant Mix
Set Ball 1/3 Higher Than Existing Grade
14 GA. Wire
Turnbuckle
Existing Grade
" M in
2x4 Stake 3 Required (Gray)
River Rock Mulch Plant Mix
Plant Pit Shall Be Min. 6" Wider Than Ball Plant Mix
Set Ball 1/3 Higher Than Existing Grade
14 GA. Wire
Turnbuckle
Existing Grade
2x4 Stake (Gray)
River Rock Mulch
" M in
Note: Ground cover shall bear same relation to finished grade after settlement as it bore to previous existing grade.
River Rock Mulch
Excavate to Required Depth and Backfill W/ Soil Mixture
Typical Planting Detail
Typical Multi-Trunk Tree Planting Detail Typical Tree Planting Detail
Typical Planting Spacing Guide Typical Container Shrub Planting Detail
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
L1.0
Landscape Plan, Schedule, and Details
Ph as e
II
Re pa ir
Ba se
P av em en ts
7t h
A ir
Re fu el in g W in g
Bi rm in gh am , A
L
13076.01/BRKR112005
August 2017
DCD
DCD/FEL
3/32" = 1'-0"L1.0 1 Landscape Plan
Landscaping Notes:
1. BOTANICAL AND COMMON NAMES SHALL CONFIRM WITH "HORTUS THIRD".
2. PLANTS SHALL BE ADJUSTED ON THE SITE TO AVOID CONFLICTS WITH
UNDERGROUND UTILITIES, SURFACE DRAINAGE WAYS, AND EXTERIOR LIGHTING
STANDARDS. ADJUSTMENT SHALL BE APPROVED PRIOR TO PLANTING
3. SHREDDED PINE BARK IN SHRUB BEDS, GROUND COVER BEDS, AND ON TREE PITS
SHALL BE STRAW (4") AND SHALL COVER THE AREA BETWEEN SHRUBS.
4. PLANT MIX FOR ALL PLANTINGS SHALL BE AS DETAILED IN SPECIFICATIONS
5. PLANT MATERIALS SHALL BE NURSERY-GROWN, ROOT-PRUNED, STOCK
CONFORMED TO ANSI Z.60.1 STANDARDS OF NURSERY STOCK
6. INSPECTIONS AT PLACE OF GROWTH SHALL NOT IMPAIR THE RIGHT OF REJECTION
AT SITE.
7. REMOVE ALL SOIL AND VEGETATION TO A DEPTH OF 9" IN AREAS TO RECEIVE
SHRUBS OR GROUND COVERS AND REPLACE WITH SOIL MIX
8. DO NOT INJURE ROOT SYSTEM OF EXISTING TREES
9. VERIFY EXACT NUMBER AND LOCATIONS OF ALL PLANTINGS WITH ARCHITECT
10. SOD - PROVIDE AS SHOWN IN SPECIFICATIONS.
11. IF ANY EXISTING PLANTINGS OR TREES ARE DISTURBED, DISTRESSED, OR DIE -
CONTRACTOR TO REPLACE BY MATCHING EXISTING PLANTS
12. LANDSCAPER NOTE EXISTING SOIL CONDITIONS IN GEOTECHNICAL REPORT IN
SPECIFICATIONS AND MAKE SITE VISIT TO BECOME FAMILIAR WITH EXISTING SOIL
CONDITIONS.
13. LANDSCAPER TO VERIFY EXISTING GRADES. CONSULT WITH ARCHITECT BEFORE
INSTALLATION OF ANY TREES, SHRUBS, OR GROUND COVERS.
Planting Schedule
Quantity Units Common Name Botanical Name Height Spread Rootball
(Container) Spacing Notes
Dwarf Yaupon Holly 18 Dwarf Yaupon Holly Ilex vomitoria 'Nana' 2' - 0" 2' - 0" 3 Gallon Knockout Roses 8 Knockout Roses Rosa x 'Radtko' 2' - 0" 2' - 0" 3 Gallon Natchez Crepe Myrtle 1 Each Natchez Crepe Myrtle Lagerstromia inidica "Natchez" 8' - 0" 5' - 0" 15 Gallon
Phasing Legend:
Denotes Scope of Work to be included in Phase I-A of the project. Scope includes:
1) Construction of New Temporary Access Drive See Drawing Sheet C6.0. Contractor shall construct this access drive first to all new concrete to cure prior to introducing vehicular traffic onto new access drive during Phase II.
2) Mill and overlay pavements in noted areas to be completed after installation of new access driveway.
Denotes Scope of Work to be included in Phase I-B of the project. Scope includes:
1) Mill and overlay areas noted that are within restricted areas.
• This work can be completed concurrently with mill and overlay work associated with Phase I-A; however, access to restricted areas for the purposes of completing the work will be limited to weekends and holidays only. Work will be allowed to occur from 05:30PM on Friday afternoons to 06:00AM on Tuesday mornings excluding drill weekends.
• All work shall be completed and areas of affected work shall be cleaned and returned to pre-work conditions by 06:00AM on Tuesday morning - no exceptions.
• Contracting Officer will conduct FOD inspection upon arrival on base on Tuesday morning and Contractor will be required to conduct additional clean up activities as directed by Contracting Officer until work areas are approved.
• Sweeper and vacuum trucks are required to be on site and operating at all times during mill/overlay operations in this area.
• Contractor to coordiante with base airfield manager and ensure all FOD mitigation measures are taken to prevent damage to the adjacent aircraft.
• At the South end of the proposed scope of work (area near the painted "restricted area" sign, Contractor to coordinate with ANG airfield manager to ensure FAA/Birmingham Airport Authority is notified of ongoing work and appropriate notices and approvals are in place with the FAA/Birmingham Airport Authority.
Denotes Scope of Work to be included in Phase II of the project. Scope includes:
1) Mill and overlay areas noted around new traffic circle.
2) Construction of new traffic circle including all site utility modifications and landscaping.
Upon completion of construction, the Contractor shall flag and barricade new traffic circle as required to prevent vehicular access until new paving systems have adequately cured.
Refer to drawing sheet PA2.0 Bid Option Diagram and Specification Section 01 2300 for scope of bid options affecting the work included in Phase II of the project.
Denotes Scope of Work to be included in Phase III of the project. Scope includes:
1) Mill and overlay areas noted. Contractor shall resume mill/overlay activities at the Northwest corner of the new traffic circle and "pave your way out" of the installation.
Refer to drawing sheet PA2.0 Bid Option Diagram and Specification Section 01 2300 for scope of bid options affecting the work included in Phase III of the project.
Sheet Notes:
1. Phasing drawing is not to scale nor should it be relied upon for determination of exact scope of work required or quantities of paving required by the Contractor. Refer to civil drawings for scope of work required. Phasing drawings is only intended to depict which scope of work shown on civil drawings is included in each project phase.
2. Refer to summary of work for additional phasing information including completion timeframes.
3. Refer to civil drawings and alternate bid options specifications for alternate bid options affecting the scope of work included in each phase of the project.
Denotes Areas Approved for laydown of Contractor's equipment and materials required to acccomplish each phase of the work.
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
PA1.0
Phasing Plan
Ph as e
II
Re pa ir
Ba se
P av em en ts
7t h
A ir
Re fu el in g W in g
Bi rm in gh am , A
L
13076.01/BRKR112005
August 2017
DCD
DCD/FEL
1" = 200'-0"PA1.0
1 Phasing Diagram
Legend:
Area included in Bid Option #1
Area included in Bid Option #2
Area included in Bid Option #3
Area included in Bid Option #4
Sheet Notes:
1. Bid Option Diagram is not to scale nor should it be relied upon for determination of exact scope of work required or quantities of paving required by the Contractor. Refer to civil drawings for scope of work required. Bid Option drawings is only intended to depict which scope of work shown on civil drawings is included in each project Bid Option.
2. Refer to civil drawings and alternate bid options specifications for additional information regarding the alternate bid options scope of work.
Area included in Bid Option #5
Area included in Bid Option #6
Area included in the Project Base Bid
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
PA2.0
Bid Option Diagram
Ph as e
II
Re pa ir
Ba se
P av em en ts
7t h
A ir
Re fu el in g W in g
Bi rm in gh am , A
L
13076.01/BRKR112005
August 2017
DCD
DCD/FEL
1" = 200'-0"PA2.0
1 Bid Option Diagram
| T1-0 - Index |
| Sheets |
| L1.0 - Landscape Plan, Schedule, and Details |
| PA1.0 - Phasing Plan |
| PA2.0 - Bid Option Diagram |
| T1.0 - Index |
| BANG PH.2 C1.0 9-23-17 |
| BANG PH2 C6.0 9-23-17 |
| BANG PH2 C2.0 9-23-17 |
| BANG PH2 C3.0 9-23-17 |
| BANG PH2 C4.0 9-23-17 |
| BANG PH2 C5.0 9-23-17 |
| BANG PH2 C7.0 9-23-17 |
| BANG PH2 C8.0 9-23-17 |
| BANG PH2 C9.0 9-23-17 |
| BANG PH2 C10.0 9-23-17 |
| BANG PH2 C11.0 9-23-17 |
| BANG PH2 C12.0 9-23-17 |
| BANG PH2 C13.0 9-23-17 |
| L1-0 - Landscape Plan, Schedule, and Details |
| Sheets |
| L1.0 - Landscape Plan, Schedule, and Details |
| PA1-0 - Phasing Plan |
| Sheets |
| L1.0 - Landscape Plan, Schedule, and Details |
| PA1.0 - Phasing Plan |
| PA2.0 - Bid Option Diagram |
| T1.0 - Index |
| PA2-0 - Bid Option Diagram |
| Sheets |
| L1.0 - Landscape Plan, Schedule, and Details |
| PA1.0 - Phasing Plan |
| PA2.0 - Bid Option Diagram |
| T1.0 - Index |
File details come from the government source that posted it.