BRKR_112005_100__Drawings.pdf

PDF 13 MB Posted

Attached to
Repair Base Pavements at the117th ARW, Birmingham
Solicitation number
W912JA-18-B-5001
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
Signed_Abstact_SF-1409.pdf PDF
Addendum_2.pdf PDF
Request_of_Information_10_July_2018.rtf RTF text file
W912JA-18-B-5001-0001_SF1442.pdf PDF
ADD_1.pdf PDF
RFI__Responses.pdf PDF
Request_of_Information_12_June_2018.rtf RTF text file
W912JA-18-P-5001_Repair_Base_Pavements_Phase_II.pdf PDF
BRKR_112005_100__Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet Number

Sheet Title

Project Title

Job Number

Date

Drawn By

Checked By

S ou th C ou rt

St re et

M on tg om er y, A L

Te l.

4.

. 5

W

W W

.S

SL

A R

C H

.C O

M

A

RC

H

IT

E

CT

U

RE

IN

TE

RI

O R

D E

SI

G

N

T1.0

Title Sheet & Index to Drawings

Ph as e

II

Re pa ir

Ba se

P av em en ts

7t h

A ir

Re fu el in g W in g

Bi rm in gh am , A

L

13076.01/BRKR112005

August 2017

DCD

DCD/FEL

Phase II - Repair Base Pavements

BRKR 112005

Birmingham IAP (ANG), AL

Option #1

Schedule of Bid Options:

Mill & Overlay Building 550 Parking Lot

Option #2 Mill & Overlay Conte Loop Road

Option #3 Mill & Overlay Parking Lot North of Building 200

Option #4 Mill & Overlay Parking Areas at Building 610 & 620 (Part A)

Option #5 Mill & Overlay Parking Areas at Building 610 & 620 (Part B)

Approvals:

Title: Signature: Date:

Base Commander

Base Civil Engineer

Base Project Engineer

Bio Environmental Eng.

Safety

Security Police

Base Communications

Fire Chief

Using Agent

Civil:Architect:

Design Team: Consulting Engineers: Index to Drawings:

T1.0 Title Sheet & Index to Drawings

Civil:

C1.0 Base Map + Key Plan

C2.0 Site Plan

C3.0 Site Plan

C4.0 Site Plan

C5.0 Site Plan

C6.0 Site Plan

C7.0 Site Plan

C8.0 Site Plan

C9.0 Site Plan

C10.0 Site Plan

C13.0 Details

C11.0 Round About Plan and Details

C12.0 Details

Reference Plan (Not to Scale)

Option #6 Mill & Overlay SegMag

L1.0 Landscape Plan, Schedule & Details

Landscape:

PA1.0 Phasing Plan

Phasing & Alternates:

PA2.0 Bid Option Diagram

No. Revision Date

Dwarf Youpon Holly (18)

Knockout Roses (8)

Natchez Crepe Myrtl (1)

Pavers (Typical) See Civil

Pavers (Typical) See Civil

See Civil Drawings for Paving Layouts and Requirements not Depicted on the Sheets

River Rock Mulch on landscape fabric (see specification section 32 9300.

Contractor Shall Provide 6' Wide Stip of Sod Along all edges of new roundabout unless noted otherwise.

Contractor to seed all other areas adjacent to the roudabout where existing grass is damaged during construction.

Contractor to Sod Entire Island

Seed as Required

Seed as Required

Seed as Required

Row

On Center Spacing 2" M in

Set Plant At Original Depth River Rock Mulch

Existing Grade

Existing Soil Remove Container and Lightly Scarify Root and Soil Mass Mound and Lightly Compact Top Soil Mixture

Plant Mix

Plant Pit Shall Be Min. 6" Wider Than Ball Plant Mix

Set Ball 1/3 Higher Than Existing Grade

14 GA. Wire

Turnbuckle

Existing Grade

" M in

2x4 Stake 3 Required (Gray)

River Rock Mulch Plant Mix

Plant Pit Shall Be Min. 6" Wider Than Ball Plant Mix

Set Ball 1/3 Higher Than Existing Grade

14 GA. Wire

Turnbuckle

Existing Grade

2x4 Stake (Gray)

River Rock Mulch

" M in

Note: Ground cover shall bear same relation to finished grade after settlement as it bore to previous existing grade.

River Rock Mulch

Excavate to Required Depth and Backfill W/ Soil Mixture

Typical Planting Detail

Typical Multi-Trunk Tree Planting Detail Typical Tree Planting Detail

Typical Planting Spacing Guide Typical Container Shrub Planting Detail

Sheet Number

Sheet Title

Project Title

Job Number

Date

Drawn By

Checked By

S ou th C ou rt

St re et

M on tg om er y, A L

Te l.

4.

. 5

W

W W

.S

SL

A R

C H

.C O

M

A

RC

H

IT

E

CT

U

RE

IN

TE

RI

O R

D E

SI

G

N

L1.0

Landscape Plan, Schedule, and Details

Ph as e

II

Re pa ir

Ba se

P av em en ts

7t h

A ir

Re fu el in g W in g

Bi rm in gh am , A

L

13076.01/BRKR112005

August 2017

DCD

DCD/FEL

3/32" = 1'-0"L1.0 1 Landscape Plan

Landscaping Notes:

1. BOTANICAL AND COMMON NAMES SHALL CONFIRM WITH "HORTUS THIRD".

2. PLANTS SHALL BE ADJUSTED ON THE SITE TO AVOID CONFLICTS WITH

UNDERGROUND UTILITIES, SURFACE DRAINAGE WAYS, AND EXTERIOR LIGHTING

STANDARDS. ADJUSTMENT SHALL BE APPROVED PRIOR TO PLANTING

3. SHREDDED PINE BARK IN SHRUB BEDS, GROUND COVER BEDS, AND ON TREE PITS

SHALL BE STRAW (4") AND SHALL COVER THE AREA BETWEEN SHRUBS.

4. PLANT MIX FOR ALL PLANTINGS SHALL BE AS DETAILED IN SPECIFICATIONS

5. PLANT MATERIALS SHALL BE NURSERY-GROWN, ROOT-PRUNED, STOCK

CONFORMED TO ANSI Z.60.1 STANDARDS OF NURSERY STOCK

6. INSPECTIONS AT PLACE OF GROWTH SHALL NOT IMPAIR THE RIGHT OF REJECTION

AT SITE.

7. REMOVE ALL SOIL AND VEGETATION TO A DEPTH OF 9" IN AREAS TO RECEIVE

SHRUBS OR GROUND COVERS AND REPLACE WITH SOIL MIX

8. DO NOT INJURE ROOT SYSTEM OF EXISTING TREES

9. VERIFY EXACT NUMBER AND LOCATIONS OF ALL PLANTINGS WITH ARCHITECT

10. SOD - PROVIDE AS SHOWN IN SPECIFICATIONS.

11. IF ANY EXISTING PLANTINGS OR TREES ARE DISTURBED, DISTRESSED, OR DIE -

CONTRACTOR TO REPLACE BY MATCHING EXISTING PLANTS

12. LANDSCAPER NOTE EXISTING SOIL CONDITIONS IN GEOTECHNICAL REPORT IN

SPECIFICATIONS AND MAKE SITE VISIT TO BECOME FAMILIAR WITH EXISTING SOIL

CONDITIONS.

13. LANDSCAPER TO VERIFY EXISTING GRADES. CONSULT WITH ARCHITECT BEFORE

INSTALLATION OF ANY TREES, SHRUBS, OR GROUND COVERS.

Planting Schedule

Quantity Units Common Name Botanical Name Height Spread Rootball

(Container) Spacing Notes

Dwarf Yaupon Holly 18 Dwarf Yaupon Holly Ilex vomitoria 'Nana' 2' - 0" 2' - 0" 3 Gallon Knockout Roses 8 Knockout Roses Rosa x 'Radtko' 2' - 0" 2' - 0" 3 Gallon Natchez Crepe Myrtle 1 Each Natchez Crepe Myrtle Lagerstromia inidica "Natchez" 8' - 0" 5' - 0" 15 Gallon

Phasing Legend:

Denotes Scope of Work to be included in Phase I-A of the project. Scope includes:

1) Construction of New Temporary Access Drive See Drawing Sheet C6.0. Contractor shall construct this access drive first to all new concrete to cure prior to introducing vehicular traffic onto new access drive during Phase II.

2) Mill and overlay pavements in noted areas to be completed after installation of new access driveway.

Denotes Scope of Work to be included in Phase I-B of the project. Scope includes:

1) Mill and overlay areas noted that are within restricted areas.

• This work can be completed concurrently with mill and overlay work associated with Phase I-A; however, access to restricted areas for the purposes of completing the work will be limited to weekends and holidays only. Work will be allowed to occur from 05:30PM on Friday afternoons to 06:00AM on Tuesday mornings excluding drill weekends.

• All work shall be completed and areas of affected work shall be cleaned and returned to pre-work conditions by 06:00AM on Tuesday morning - no exceptions.

• Contracting Officer will conduct FOD inspection upon arrival on base on Tuesday morning and Contractor will be required to conduct additional clean up activities as directed by Contracting Officer until work areas are approved.

• Sweeper and vacuum trucks are required to be on site and operating at all times during mill/overlay operations in this area.

• Contractor to coordiante with base airfield manager and ensure all FOD mitigation measures are taken to prevent damage to the adjacent aircraft.

• At the South end of the proposed scope of work (area near the painted "restricted area" sign, Contractor to coordinate with ANG airfield manager to ensure FAA/Birmingham Airport Authority is notified of ongoing work and appropriate notices and approvals are in place with the FAA/Birmingham Airport Authority.

Denotes Scope of Work to be included in Phase II of the project. Scope includes:

1) Mill and overlay areas noted around new traffic circle.

2) Construction of new traffic circle including all site utility modifications and landscaping.

Upon completion of construction, the Contractor shall flag and barricade new traffic circle as required to prevent vehicular access until new paving systems have adequately cured.

Refer to drawing sheet PA2.0 Bid Option Diagram and Specification Section 01 2300 for scope of bid options affecting the work included in Phase II of the project.

Denotes Scope of Work to be included in Phase III of the project. Scope includes:

1) Mill and overlay areas noted. Contractor shall resume mill/overlay activities at the Northwest corner of the new traffic circle and "pave your way out" of the installation.

Refer to drawing sheet PA2.0 Bid Option Diagram and Specification Section 01 2300 for scope of bid options affecting the work included in Phase III of the project.

Sheet Notes:

1. Phasing drawing is not to scale nor should it be relied upon for determination of exact scope of work required or quantities of paving required by the Contractor. Refer to civil drawings for scope of work required. Phasing drawings is only intended to depict which scope of work shown on civil drawings is included in each project phase.

2. Refer to summary of work for additional phasing information including completion timeframes.

3. Refer to civil drawings and alternate bid options specifications for alternate bid options affecting the scope of work included in each phase of the project.

Denotes Areas Approved for laydown of Contractor's equipment and materials required to acccomplish each phase of the work.

Sheet Number

Sheet Title

Project Title

Job Number

Date

Drawn By

Checked By

S ou th C ou rt

St re et

M on tg om er y, A L

Te l.

4.

. 5

W

W W

.S

SL

A R

C H

.C O

M

A

RC

H

IT

E

CT

U

RE

IN

TE

RI

O R

D E

SI

G

N

PA1.0

Phasing Plan

Ph as e

II

Re pa ir

Ba se

P av em en ts

7t h

A ir

Re fu el in g W in g

Bi rm in gh am , A

L

13076.01/BRKR112005

August 2017

DCD

DCD/FEL

1" = 200'-0"PA1.0

1 Phasing Diagram

Legend:

Area included in Bid Option #1

Area included in Bid Option #2

Area included in Bid Option #3

Area included in Bid Option #4

Sheet Notes:

1. Bid Option Diagram is not to scale nor should it be relied upon for determination of exact scope of work required or quantities of paving required by the Contractor. Refer to civil drawings for scope of work required. Bid Option drawings is only intended to depict which scope of work shown on civil drawings is included in each project Bid Option.

2. Refer to civil drawings and alternate bid options specifications for additional information regarding the alternate bid options scope of work.

Area included in Bid Option #5

Area included in Bid Option #6

Area included in the Project Base Bid

Sheet Number

Sheet Title

Project Title

Job Number

Date

Drawn By

Checked By

S ou th C ou rt

St re et

M on tg om er y, A L

Te l.

4.

. 5

W

W W

.S

SL

A R

C H

.C O

M

A

RC

H

IT

E

CT

U

RE

IN

TE

RI

O R

D E

SI

G

N

PA2.0

Bid Option Diagram

Ph as e

II

Re pa ir

Ba se

P av em en ts

7t h

A ir

Re fu el in g W in g

Bi rm in gh am , A

L

13076.01/BRKR112005

August 2017

DCD

DCD/FEL

1" = 200'-0"PA2.0

1 Bid Option Diagram

T1-0 - Index
Sheets
L1.0 - Landscape Plan, Schedule, and Details
PA1.0 - Phasing Plan
PA2.0 - Bid Option Diagram
T1.0 - Index
BANG PH.2 C1.0 9-23-17
BANG PH2 C6.0 9-23-17
BANG PH2 C2.0 9-23-17
BANG PH2 C3.0 9-23-17
BANG PH2 C4.0 9-23-17
BANG PH2 C5.0 9-23-17
BANG PH2 C7.0 9-23-17
BANG PH2 C8.0 9-23-17
BANG PH2 C9.0 9-23-17
BANG PH2 C10.0 9-23-17
BANG PH2 C11.0 9-23-17
BANG PH2 C12.0 9-23-17
BANG PH2 C13.0 9-23-17
L1-0 - Landscape Plan, Schedule, and Details
Sheets
L1.0 - Landscape Plan, Schedule, and Details
PA1-0 - Phasing Plan
Sheets
L1.0 - Landscape Plan, Schedule, and Details
PA1.0 - Phasing Plan
PA2.0 - Bid Option Diagram
T1.0 - Index
PA2-0 - Bid Option Diagram
Sheets
L1.0 - Landscape Plan, Schedule, and Details
PA1.0 - Phasing Plan
PA2.0 - Bid Option Diagram
T1.0 - Index

File details come from the government source that posted it.