Questions and Answers 1.docx

DOCX document 17 KB Posted

Attached to
Wisconsin National Guard MATOC for Construction
Solicitation number
W912J2-22-R-0001
Issued by

About this file

This document contains questions and answers related to a solicitation for a Wisconsin National Guard Multiple Award Task Order Contract for construction. The solicitation will result in awards of indefinite delivery/indefinite quantity contracts with a five year ordering period and a total value of $25 million across all orders. Eligible offers must be small businesses according to NAICS code 236220 with a size standard of $39.5 million. A pre-proposal conference will be held to review the requirements. The scope of work includes maintenance, repair, construction and design-build services. This document provides clarification on aspects of the construction drawings such as connections for new drains and reusing existing doors. It also specifies that existing smoke detectors will be replaced with new heat detectors and references plans showing the existing detection locations.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912J2-22-R-0001 Wisconsin National Guard MATOC for Construction Questions and Answers #1 (Q&A #1) 2 May 2022

1. One of my subs had a question about the drain that will be installed in the addition of the building. He wanted to know if the new drain will tie into the storm sewer or the sanitary system? And will we need to tie it into the existing adjacent building plumbing?

Refer to KEYED NOTES (NEW CONSTRUCTION) on Sheet S-111 N4 refers to a New Containment Trench.

There is no connection to storm or sanitary sewer systems.

2. Drawing AD010 indicates to remove two existing overhead doors and salvage for reuse. A601 door schedule does not designate reusing the existing doors. Please confirm if 101A thru 101E are all new overhead doors (5 total) or if two of them are the salvaged doors. If two are the salvaged doors, please indicate which ones.

Refer to DOOR SCHEDULE on Sheet A-601.

Doors 101A, 101C, and 101E are new overhead doors (3 total).

Doors 101B and 101C are salvage and reinstall.

DOOR SCHEDULE REMARK 1 indicates location of salvaged doors.

3. Please confirm if the heat detectors shown in the existing cold storage (FA101) are existing or new.

All existing smoke detectors are being replaced with all new heat detectors.

4. Please provide plans showing existing smoke detectors that are being removed (Note4/FA101) See Suplemental Information Document:

XGFG162015 Construct AGE - AVIONICS COLD STORAGE - Fire Detection & Suppression As-Built

5. The MATOC task order form includes a line item for “Division 27 Communications”. There is no Division 27 in the specifications.

Division 27 Communications is being replaced with Division 28 Electronic Safety and Security on the revised MATOC Task Order Form

6. There is a Division 28 – Electronic Safety and Security in the specifications. Where should the cost for this work be included on the MATOC task order form?

Division 27 Communications is being replaced with Division 28 Electronic Safety and Security on the revised MATOC Task Order Form