B_08_QA_19R5007_Repair_Roof_B706__2.docx

DOCX document 15 KB Posted

Attached to
Repair by Replace Roof
Solicitation number
W912J219R5007
Issued by

About this file

Q&A #2 - Added one question

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912J2-19-R-5007 Repair by Replace B706 Roof Questions and Answers #2 30 April 2019

1. What thickness cover board is required, 1/2" or 1/4"?

a. 1/2" cover board is required

2. Are we allowed to keep an enclosed trailer on site for the duration of the project? This is to keep our tools/equipment in so we can lock it nightly and keep everything onsite.

a. Yes

3. Will there be a staging area available in the parking lot that we can rope off for tools, material, equipment, trailer, etc.

a. Yes, a designated location will be coordinated with the COR and the installing contractor

4. Will we be able to set dumpsters right next to the building for easier disposal?

a. Yes, a designated location will be coordinated with the COR and the installing contractor

5. The 30 year warranty stated in the specs. We assume that is actually a materials warranty by the manufacturer and not an installed warranty held by the contractor/installer?

a. 30 year manufacturer warranty is required on all roofing materials

b. Installing Contractor is to provide a one year warranty on material and labor

6. What is the percentage of total bid do you need for our bond?

a. According to FAR 28.101-2(b), The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated.

7. Are we required to submit a Project Plan? (added 30 Apr)

a. Amendment #2 on 30 Apr 19 incorporates the evaluation of offers detailed in Section 00100 of the SF1442. Provide a Project Plan in any format with a Tentative NTP date of 01 JUNE 2019. Additionally, provide a brief synopsis (NTE 3 pages) describing your technical solution to augment and support the Project Plan to meet the period of performance accordingly.

A successful project plan will provide the Government confidence that the project is structured to be executable for the resources indicated. The Project Plan and products proposed should clearly demonstrate an adequate understanding of the tasks and resources necessary to complete project.

File details come from the government source that posted it.