QUESTIONS AND ANSWERS AMENDMENT 0001.pdf

PDF 149 KB Posted

Attached to
Hydraulic Steady Rest Kit
Solicitation number
W912HZ27QA011
Issued by

About this file

This document is a Question and Answer (Q&A) compilation clarifying requirements for a federal procurement of a hydraulic steady rest kit for a HAAS ST45-L lathe.

The Government seeks a complete, operational hydraulic steady rest kit compatible with a HAAS ST45-L lathe (Serial Number 3129086, manufactured 03/2024) equipped with factory-installed steady rest provisions. The kit must accommodate workpieces with a clamping range of 6 to 10 inches in diameter, bolt directly to the HAAS factory steady rest mounting provisions, and utilize the machine's existing factory hydraulic system (which includes two hydraulic ports and a foot pedal). The Government references Kitagawa kit #1131 as the basis of design but will accept technically equivalent products from other manufacturers that meet the specified requirements and include all components necessary for a functioning steady rest assembly. Equivalent products must be supported by technical documentation demonstrating compatibility. This is a supply-only procurement with no installation, integration, commissioning, or on-site testing required by the contractor; the Government will perform installation using its own personnel. Delivery is required within 10 weeks after contract award to ERDC Vicksburg, Building 6001 Machine Shop (3909 Halls Ferry Road, Vicksburg, MS 39180), Monday–Friday 0600–1630, with early delivery preferred. Shipping costs must be separated and priced under CLIN 0002 unless shipping is free. Government acceptance will be based on inspection of delivered equipment and functional testing. Manufacturers must provide installation instructions, operating manuals, and maintenance documentation at delivery. The nonmanufacturer rule does not apply to this procurement, DoD-compliant unique item identifiers are not required, and products from non-qualifying countries will not be considered under DFARS 252.225-7001.

View the file

Other files

File Type Posted
AMENDMENT 0001.pdf PDF
Solicitation W912HZ27QA011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Can the Government provide the lathe's serial number, year of manufacture, and applicable machine configuration information to assist suppliers in verifying compatibility?

HAAS ST45-L Serial Number: 3129086, Date of Manufacture: 03/2024

2. Are mechanical interface drawings, mounting dimensions, bolt patterns, or other technical documentation available for the existing factory steady-rest mounting provisions?

No, the machine is fitted with HAAS factory steady rest provisions.

3. Does the existing machine have any configuration-specific limitations or requirements that must be considered when selecting a compatible hydraulic steady rest?

It must be a direct bolt-on kit compatible with a HAAS ST45L with factory installed steady rest provisions with everything needed for a working unit.

4. Can the Government identify the manufacturer, model, operating pressure, and connection specifications of the existing hydraulic control system?

The machine is a HAAS ST45L, the hydraulic control system on the machine is the factory installed steady rest provisions.

5. Are the required hydraulic control valves, electrical controls, and activation interfaces already installed and operational?

It has HAAS factory installed steady rest provisions.

6. Must the proposed kit include any additional valves, regulators, hoses, fittings, adapters, or control components beyond those specifically identified in the solicitation?

The kit needs everything needed to have a functioning unit.

7. Can the Government provide photographs or technical drawings of the existing hydraulic connections and control interfaces?

It has HAAS factory control interfaces.

8. Can the Government provide the complete manufacturer part number, technical datasheet, or specifications identifying the particular Kitagawa Kit A configuration intended for the HAAS ST-45L?

Kitagawa kit #1131

9. Can the Government identify the minimum required workpiece load capacity, clamping force, operating pressure, and permissible spindle speed or operating limitations?

We need to meet the capabilities of the Kitagawa kit 1131.

10. Will a technically equivalent product from another manufacturer be acceptable if it meets the specified 6-to-10-inch workpiece diameter range, mounting requirements, hydraulic compatibility, and operating performance?

Yes

11. For an equivalent product, what supporting technical documentation must be submitted to demonstrate technical acceptability?

It needs to show it will include everything needed for a functioning steady rest and clamping range 6’’-10’’.

12. Is this requirement strictly for furnishing and delivering the complete kit, or must the contractor also provide on-site installation, integration, commissioning, or operational testing?

A complete operational kit, installation is to be done by the government.

13. If installation is required, please identify any applicable personnel qualifications, access requirements, work schedules, and acceptance-testing requirements.

Installation is not required.

14. If this is a supply-only procurement, will the Government perform installation and integration using its own personnel?

15. Are any machine modifications, fabrication, additional hydraulic power components, or electrical modifications anticipated beyond the direct bolt-on installation described?

NO

16. Please confirm whether the controlling delivery requirement is 10 weeks after contract award 10 Weeks

17. Are partial or early deliveries acceptable?

Early delivery is preferred.

18. Are there any receiving restrictions, required delivery appointments, unloading requirements, or special packaging requirements at the ERDC delivery location?

No. Mon-Fri 0600-1630

19. Section B identifies CLIN 0001 for the Hydraulic Steady Rest Kit and CLIN 0002 for shipping, while also requiring all shipping costs to be included.

Shipping costs must be separated and added to CLIN 0002 unless shipping is free.

20. Should freight charges be separately priced under CLIN 0002, with CLIN 0001 reflecting the equipment price exclusive of freight?

Shipping costs must be separated and added to CLIN 0002 unless shipping is free.

21. Alternatively, should freight be included in CLIN 0001, with CLIN 0002 entered as $0.00 or included?

Shipping costs must be separated unless shipping is free.

22. Please confirm whether the delivered steady rest assembly must bear a DoD-compliant unique item identifier or recognized equivalent.

No

23. Are there specific labeling, marking, serialization, or data-submission requirements beyond those established in the referenced clause?

24. Will manufacturer-applied identification be acceptable if it satisfies the applicable DFARS requirements?

25. Does the nonmanufacturer rule apply to this procurement?

No, this is exempt from nonmanufacturer rule apply

26. If applicable, has the Small Business Administration issued an individual or applicable class waiver for this requirement?

Non-manufacturer rule does not apply class waiver is not required.

27. May an eligible small-business prime contractor furnish equipment manufactured by another company, subject to the applicable small-business set-aside and nonmanufacturer requirements?

Non-manufacturer rule does not apply.

28. Are there any additional solicitation-specific restrictions on the use of authorized distributors, resellers, or subcontractors?

29. Please confirm whether products manufactured in qualifying countries may be offered in accordance with the applicable DFARS provisions.

Unable to provide a response DFARS provisions not provided.

30. Are any additional domestic manufacturing, country-of-origin documentation, or certification requirements applicable to the proposed equipment?

31. Does the Government require a minimum manufacturer warranty period, or will the manufacturer's standard commercial warranty be acceptable?

Standard commercial warranty is acceptable

32. Will Government acceptance be based on inspection of the delivered equipment and supporting documentation, or will functional testing on the existing HAAS ST-45L be required?

Delivered equipment and functional testing.

33. Are any manufacturer installation instructions, operating manuals, maintenance documentation, or certificates of conformity required at delivery?

Yes, installation instructions, operating manuals and maintenance documentation.

34. Does the Government require a specific quotation format or technical compliance matrix?

35. Will manufacturer technical datasheets, part numbers, written compatibility confirmation, country-of-origin information, delivery schedule, and itemized pricing be sufficient to support technical evaluation?

36. Are any additional technical submissions, manufacturer authorizations, or representations required beyond those specified in the solicitation?

37. Does "Kitagawa Kit A" Refer to Specific Part Number?

Please refer to Q1

38. For an "or equivalent" offer, are the salient characteristics limited to the 6–10" range, a bolt-on fit to the st-45l factory provision, and use of the machine hydraulics?

At minimum, the clamping range needs to include 6’’ to 10’’ diameter work pieces. It must bolt directly to the HAAS factory steady rest mounts and utilize the HAAS factory hydraulics.

39. Is installation included or excluded?

Please refer to Q13

40. "Kitagawa kit a" is not a published kitagawa part number. kitagawa-northtech lists HAAS compact steady rest kit 324 (1.18"-9.645") and kit 1131 (4.33"-12.20"). which kit is the basis of design, and what minimum load rating / clamping force should an equivalent meet?

41. is the existing ST-45L provision the HAAS standard or the programmable steady rest provision? what hydraulic supply pressure is available, and does the provision include the control valve, or must the kit include a hydraulic control kit? It is the factory steady rest provision provided from HAAS when purchasing the machine new.

42. is installation required, or is this supply only?

Installation is not required, this is supply only

43. under DFARS 252.225-7001, will an equivalent kit from a non-qualifying country be considered (with the evaluation factor applied)?

44. is the 10-week delivery firm, or would 12-14 weeks after award be acceptable?

The 10-week delivery is firm; earlier is preferred

45. could the government share the lathe serial number or a photo of the installed provision so suppliers can confirm bracket fit?

46. section b / item 0001: is the kitagawa-northtech "kit a" part number for the HAAS st-45l the basis of design, and will an equal steady rest from another manufacturer (e.g., smw autoblok) be acceptable if it meets the 6–10 in. clamping range?

47. salient characteristics: please confirm the minimum required clamping range (6 in. to 10 in.) and whether the machine already has the hydraulic option/ports needed to power the steady rest, or whether a hydraulic unit must be included Yes, at minimum 6’’ to 10’’ clamping range is required. The machine is fitted with the HAAS factory steady rest provisions when purchasing a new machine. It has two hydraulic ports and foot pedal installed and ready.

48. installation: is the government performing installation on the st-45l, or should quotes include on-site installation and alignment?

Refer to Q13

49. nonmanufacturer rule (far 52.219-1/52.219-14): since this is a total small business set-aside under NAICS 333515, will the government accept a product made by a large manufacturer, or has a class waiver been applied?

Non-manufacturer rule does not apply.

50. IUID (DFAS 252.211-7003): is IUID marking required on this item, and is a commercial manufacturer serial plate acceptable?

51. Delivery: Please confirm the delivery address/building at ERDC Vicksburg and receiving hours, and whether earlier delivery than Jan 29, 2027 is acceptable.

3909 Halls Ferry rd. Vicksburg, MS 39180 bldg. 6001 machine shop. Monday – Friday 0600-1630. Delivery before Jan 29 is acceptable and preferred. The contract requests 10 week delivery.

Boyd, Sonia J CIV USARMY CEERD (USA) Is this a question?

Coronel, Tam M CIV USARMY CEERD (USA) Yes; I added back the original question

File details come from the government source that posted it. Updated .