W912HZ24R0008.pdf

PDF 604 KB Posted

Attached to
Re-certification and Maintenance of Fume Hoods and Biohoods
Solicitation number
W912HZ24R0008
Issued by

About this file

This document is a solicitation for a federal contract opportunity issued by the Department of the Army Corps of Engineers Engineer Research and Development Center. The solicitation is for the annual re-certification and maintenance of fume hoods and biosafety hoods located in various laboratories. The contractor must have specific certifications and accreditations to perform the work, which includes inflow and downflow velocity measurements, HEPA filter integrity testing, smoke pattern testing, and other inspections and calibrations. The solicitation covers a base year and four option years. Proposals are due by 12:00 PM on May 10, 2024 and will be evaluated based on lowest price technically acceptable criteria, with technical factors being significantly more important than past performance and price. The contract will be awarded as a firm-fixed-price contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912HZ24R0008 17-Apr-2024

b. TELEPHONE NUMBER

601-634-5249

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 10 May 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912HZ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AMANDA M ANDREWS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ERDC CONTRACTING OFFICE

3909 HALLS FERRY ROAD

VICKSBURG MS 39180-6199

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W81EWF 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

TEL: 601-634-3835 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESSX

SIZE STANDARD:

$34,000,000

NAICS:

811210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912HZ24R0008

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE YEAR FUME & BIO HOOD CERTIFICATION

FFP

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

• Site installation testing and alarm calibration – confirms alarm performance and assesses installation of units for NSF and OSHA compliance.

NET AMT

0001AA Job

FUME HOOD & SNORKEL TESTING

FFP

Testing for Fume Hoods and Snorkels

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing FOB: Destination

PSC CD: J066

0001AB Job

BIO HOOD TESTING

FFP

Testing for Bio hoods

• Non-viable particle counting – performed in accordance with ISO 14644- 1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

OPTION OPTION YR 1 FUME/BIO HOOD CERTIFICATION

FFP

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

1001AA Job

OPTION FUME HOOD & SNORKEL TESTING

FFP

Testing for Fume Hoods and Snorkels

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing

1001AB Job

OPTION BIO HOOD TESTING

FFP

Testing for Bio hoods

• Non-viable particle counting – performed in accordance with ISO 14644- 1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

OPTION OPTION YR 2 FUME/BIO HOOD CERTIFICATION

FFP

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

2001AA Job

OPTION FUME HOOD & SNORKEL TESTING

FFP

Testing for Fume Hoods and Snorkels

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing

2001AB Job

OPTION BIO HOOD TESTING

FFP

Testing for Bio hoods

• Non-viable particle counting – performed in accordance with ISO 14644- 1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

OPTION OPTION YR 3 FUME/BIO HOOD CERTIFICATION

FFP

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

3001AA Job

OPTION FUME HOOD & SNORKEL TESTING

FFP

Testing for Fume Hoods and Snorkels

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing

3001AB Job

OPTION BIO HOOD TESTING

FFP

Testing for Bio hoods

• Non-viable particle counting – performed in accordance with ISO 14644- 1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

OPTION OPTION YR 4 FUME/BIO HOOD CERTIFICATION

FFP

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

4001AA Job

OPTION FUME HOOD & SNORKEL TESTING

FFP

Testing for Fume Hoods and Snorkels

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing

4001AB Job

OPTION BIO HOOD TESTING

FFP

Testing for Bio hoods

• Non-viable particle counting – performed in accordance with ISO 14644- 1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

OPTION OPTION YR 4 FUME/BIO HOOD CERTIFICATION

FFP

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

5001AA 1 Job

OPTION 52.217-8 FUME HOOD & SNORKEL TESTING

FFP

Testing for Fume Hoods and Snorkels

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing

5001AB 1 Job

OPTION 52.217-8 BIO HOOD TESTING

FFP

Testing for Bio hoods

• Non-viable particle counting – performed in accordance with ISO 14644- 1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

Section C - Descriptions and Specifications

PWS

Performance Work Statement

Re-Certification and Maintenance of Fume Hoods and Biohoods

Introduction The US Army Engineer Research and Development Center, Environmental Laboratory, Environmental Processes and Engineering Division (EPED) and Ecosystem Evaluation and Engineering Division (EED) have a need for annual re-certification and maintenance of fume and bio hoods located within the laboratories in the EL.

Specific Needs for Buildings Minimum needs of the service contract include annual and optional maintenance to all fume and bio hoods located within the laboratories of the EL.

The Contractor must have the following certifications, accreditation by the Associated Air Balance Council (AABC) for at least 10 years and have attained the AABC Commissioning Group (ACG) certification seal. In addition to AABC accreditation, all servicing contractor technicians must have current NSF Biosafety Cabinet Field Certifier Accreditation. Biosafety cabinets must be services and calibrated according to the NSF/ANSI Standard 49-2012.

If any hood requires replacement parts, all replacement parts must be new parts that meet the specifications of the hood that is being serviced.

Table 1 – Fume and Bio Hood information

Width Building Location/Room # MAKE MODEL DETAILS 4' B3284 Rm 19C Labconco Protector Fume Hood

3' B3297 Mezzanine, middle fishbowl St Charles U4V-006476 U4V-006476: Fume Hood

5' B3297 RM 116 Kewuanee Supreme Air U4V-006498: Fume Hood

5' B3297 Rm 116 Kewuanee Supreme Air U4V-006499: Fume Hood

8' B3297 Rm 117 Kewuanee Supreme Air u4v-006500: Fume Hood

4' B3297 Rm 201 AMS U4V-006504 U4V-006504: Fume Hood

4' B3297 Rm 202 AMS U4V-006501 U4V-006501: Fume Hood

4' B3297 Rm 202 AMS U4V-006502 U4V-006502: Fume Hood

5' B3297 Rm 204 AMS U4V-006503 U4V-006503: Fume Hood

6' B3297 Rm 206 Hamilton SafeAire / U4V- 006510 U4V-006510: Fume Hood

5' B3297 Rm 207 Hamilton SafeAire U4V-006511: Fume Hood

5' B3297 Rm 207 Hamilton SafeAire U4V-006512: Fume Hood

6' B3297 Rm113 Kewuanee Supreme Air U4V-006493: Fume Hood

8' B3297 Rm114 Kewuanee Supreme Air U4V-006497: Fume Hood 5ft B3299 Rm 103 LabConco Recirculating Fume Hood

6ft B3299 Rm 110 LabConco 11061030031894 6' Protector XStream Lab Hood

4ft B3299 Rm 121 LabConco 11011030031894 4' Protector XStream Lab Hood

4ft B3299 Rm 122 LabConco 11011030031894 4' Protector XStream Lab Hood

4ft B3299 Rm 127 LabConco 11011030031894 4' Protector XStream Lab Hood

8ft B3299 Rm 128 LabConco 11081030031894 8' Protector XStream Lab Hood

8ft B3299 Rm 128 LabConco 11081030031894 8' Protector XStream Lab Hood

8ft B3299 Rm 128 LabConco 11081030031894 8' Protector XStream Lab Hood

4ft B3299 Rm 131 LabConco 11011030031894 4' Protector XStream Lab Hood

8ft B3299 Rm 134 LabConco 11081030031894 8' Protector XStream Lab Hood

6ft B3299 Rm 135 LabConco 11061030031894 6' Protector XStream Lab Hood

B3299 Rm 144 LabConco Chemical Fume Hood Walk In

4ft B3299 RM122 LabConco 11011030031894 4' Protector XStream Lab Hood

6ft B3299 Rm129 LabConco 11061030031894 6' Protector XStream Lab Hood

6ft B3299 Rm129 LabConco 11061030031894 6' Protector XStream Lab Hood

6ft B3299 Rm129 LabConco 11061030031894 6' Protector XStream Lab Hood

6ft B3299 Rm135 LabConco 11061030031894 6' Protector XStream Lab Hood 4-1/2' B5036 Bio Lab 2/RM5 LabConco 302411100 A2 Fume Hood

B5036 Not Currently Installed / TBD Labconco

Protector PVC Laboratory Fume Hood for Acid Digestion (acid resistant fume hood)

B5036 Not Currently Installed

Fume hood (regular, non-acid resistant)

6ft B5036 Rm 10 Kewaunee Supreme Air LV Fume Hood

4' B5036 Rm 20 Kewaunee Supreme Air / U4V-006724 U4V-006724: Fume Hood

3' B5036 Rm 5 U4V-006725 U4V-006725: Fume Hood 5 B5036 Rm19 Kewaunee Fume Hood

B5036 Rm21 Kewaunee Supreme Air / U4V-006722 U4V-006722: Fume Hood

4 B6000 Rm 65B

Laboratory Design & Supply U4V-004227

Fume Hood- U4V-004227 Numbered EF5 - Ducted

4 B6000 Rm 65D

Laboratory Design & Supply U4V-004229

Fume Hood-U4V-004229 Numbered EF-6 - Ducted

4 B6000 Rm 77

Laboratory Design & Supply U4V-004228

Fume Hood-U4V-004228 Numbered EF-4 - Ducted

6 B6000 Rm 80 Kewuanee H05 Chemical Fume Hood 6 B6000 Rm 80 Kewuanee H05 Chemical Fume Hood 4 B6000 Rm 81 LabConco Basic 47 Chemical Fume Hood 6 B6000 Rm 83 Kewuanee H05 Chemical Fume Hood

6 B6000 Rm 89 Fisher Science 93-608Q Chemical Fume Hood

4 B6008 2nd Floor BMC Labs? B-604 Airfoil Bypass Fume Hood

4 B6008 2nd Floor BMC Labs? B-604 Airfoil Bypass Fume Hood

6 B6008 Rm 101

Laboratory Design & Supply U4V-006843

U4V-006843: Chemical Fume Hood

4 B6008 Rm 109

Laboratory Design & Supply U4V-006847

U4V-006847: Chemical Fume Hood

4 B6008 Rm 109

Laboratory Design & Supply U4V-006848

U4V-006848: Chemical Fume Hood

5 B6008 Rm 111

Laboratory Design & Supply U4V-006853 U4V-006853: Fume Hood

6 B6008 Rm 112 Labconco U4V-006851 U4V-006851: Chemical Fume Hood

6 B6008 Rm 119 Labconco 9902100 U4V-006839: Chemical Fume Hood

4 B6008 RM113A

Laboratory Design & Supply U4V-006849 U4V-006849: Fume Hood

4 B6009 wetlab Labconco Basic 47 U4V-006822 Fume Hood-U4V-006822

2.5 B6011 Ste B, Rm 16

UVP (now Analytik Jena US) UV3 UV3 Hepa PCR Workstation

2.5 B6011 Ste B, Rm 17

UVP (now Analytik Jena US) UV3 UV3 Hepa PCR Workstation

4 B6011 suite A Labconco U4V-001979 U4V-001979: Chemical Fume Hood

4 B6011 suite C Labconco U4V-001984 U4V-001984: Chemical Fume Hood

3 B6011 Suite E PurAir P5-36 Ductless Hood

4 B6011 suite E Labconco U4V-001288 U4V-001288: Chemical Fume Hood

5 B6011 Syn Bio Lab Labconco Echo Benchtop Ductless Fume Hood

77-3/4" B3297 Rm 113 NuAire NU-425-600 Series 23 Class II Type A/B3 Biosafety hood

3 B6000 Rm 80 Air Science PurAir PCR laminar hood

3 B6000 Rm 80 Air Science PurAir PCR laminar hood

6 B6000 Rm 81 NuAire NU-425-600 Laminar Flow Biological Safety Cabinet Class II Type A/B3

6 B6000 Rm 83 NuAire NU-425-600 Laminar Flow Biological Safety Cabinet Class II Type A/B3

4.5 B6000 Rm 93 NuAire NU-430-400

Laminar Flow Biological Safety Cabinet Class II Type B2

6 B6000 Rm80 NuAire NU-560-601 Laminar Flow Biological Safety Cabinet Class II Type B2

6 B6000 Rm83 NuAire NU-560-601 Laminar Flow Biological Safety Cabinet Class II Type B2

4 B6008 2nd Floor NuAire NU-425-400 Class II Type A/B3 Biological Safety Cabinet

4.5 B6011 Ste B, Rm 13 Labconco Logic + A2 Biosafety Cabinet, Purifier

2.5 B6011 Ste B, Rm 16

UVP (now Analytik Jena

US)

Hepa/UV Sterilizing PCR Workstation

3 B6011 Suite E Labconco Logic + 30210000 Biosafety hood - Ductless Hood

3 B6011 suite E Labconco Logic + 30210000 Biosafety hood - Ductless Hood

5.5 B6011 Syn Bio Lab Labconco Logic + A2 Biosafety Cabinet, Purifier Snorkel B3299 Rm 121B NA NA Snorkel 121-1 Snorkel B3299 Rm 122 NA NA Snorkel 122-1 Snorkel B3299 Rm 127 NA NA Snorkel 127-2 Snorkel B3299 Rm 128 NA NA Snorkel 128-1 Snorkel B3299 Rm 128 NA NA Snorkel 128-2 Snorkel B3299 Rm 128 NA NA Snorkel 128-3 Snorkel B3299 Rm 128 NA NA Snorkel 128-4 Snorkel B3299 Rm 128 NA NA Snorkel 128-5 Snorkel B3299 Rm 129 NA NA Snorkel 129-1 Snorkel B3299 Rm 129 NA NA Snorkel 129-2 Snorkel B3299 Rm 129 NA NA Snorkel 129-3 Snorkel B3299 Rm 129 NA NA Snorkel 129-4 Snorkel B3299 Rm 131 NA NA Snorkel 131-1 Snorkel B3299 Rm 131 NA NA Snorkel 131-10 Snorkel B3299 Rm 131 NA NA Snorkel 131-2 Snorkel B3299 Rm 131 NA NA Snorkel 131-3 Snorkel B3299 Rm 131 NA NA Snorkel 131-4 Snorkel B3299 Rm 131 NA NA Snorkel 131-5 Snorkel B3299 Rm 131 NA NA Snorkel 131-6 Snorkel B3299 Rm 131 NA NA Snorkel 131-7 Snorkel B3299 Rm 131 NA NA Snorkel 131-8 Snorkel B3299 Rm 131 NA NA Snorkel 131-9 Snorkel B3299 Rm 134 NA NA Snorkel 134-1 Snorkel B3299 Rm 134 NA NA Snorkel 134-2 Snorkel B3299 Rm 134 NA NA Snorkel 134-3 Snorkel B3299 Rm110 NA NA Snorkel 110-1 Snorkel B3299 Rm110 NA NA Snorkel 110-2 Snorkel B3299 Rm110 NA NA Snorkel 110-3 Snorkel B3299 Rm110 NA NA Snorkel 110-4 Snorkel B3299 Rm127 NA NA Snorkel 127-1 Snorkel B3299 Rm135 NA NA Snorkel 135-1 Snorkel B3299 Rm135 NA NA Snorkel 135-2 Snorkel B3299 Rm135 NA NA Snorkel 135-3

Task 1 Base Year

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Airflow smoke pattern testing

• Sash and cable inspections

All bio hoods located within various laboratories require the following re-certifications annually,

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

• Site installation testing and alarm calibration – confirms alarm performance and assesses installation of units for NSF and OSHA compliance.

Base Year Task 1.1 Testing for Fume Hoods and Snorkels,

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

• Tracer gas containment testing

• Sash motion effects tracer gas containment testing

Base Year Task 1.2 Testing for Bio hoods,

• Non-viable particle counting – performed in accordance with ISO 14644-1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

Task 1 Option Year 1

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

• Site installation testing and alarm calibration – confirms alarm performance and assesses installation of units for NSF and OSHA compliance.

Option Year 1 Task 1.1 Testing for Fume Hoods and Snorkels,

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

Option Year 1 Task 1.2 Testing for Bio hoods,

• Non-viable particle counting – performed in accordance with ISO 14644-1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

Task 1 Option Year 2

All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

• Site installation testing and alarm calibration – confirms alarm performance and assesses installation of units for NSF and OSHA compliance.

Option Year 2 Task 1.1 Testing for Fume Hoods and Snorkels,

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

Option Year 2 Task 1.2 Testing for Bio hoods,

• Non-viable particle counting – performed in accordance with ISO 14644-1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

• UV light testing – ensures the UV light operates adequately and provides UVC output for the proper exposure calculation.

Task 1 Option Year 3 All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

• Site installation testing and alarm calibration – confirms alarm performance and assesses installation of units for NSF and OSHA compliance.

Option Year 3 Task 1.1 Testing for Fume Hoods and Snorkels,

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

Option Year 3 Task 1.2 Testing for Bio hoods,

• Non-viable particle counting – performed in accordance with ISO 14644-1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

Task 1 Option Year 4 All fume hoods and snorkels located within various laboratories require the following re-certifications annually,

• Inflow face velocity profiling

• Inflow velocity measurements – must ensure proper inflow is maintained for operator and environmental protection.

• Downflow velocity measurements – documents the air in the work area is unidirectional and functioning as designed, preventing cross contamination, and providing product protection from the environment.

• HEPA Filter Integrity Testing – documents leakage or defects and ensures HEPA filters provide adequate filtration protection for the operator and environment.

• Smoke pattern testing – qualitatively verifies airflow directions using a small source of visible fog.

• Site installation testing and alarm calibration – confirms alarm performance and assesses installation of units for NSF and OSHA compliance.

Option Year 4 Task 1.1 Testing for Fume Hoods and Snorkels,

• Local and large volume smoke visualization testing

• Cross-draft testing

• VAV (Variable Air Volume) response testing

Option Year 4 Task 1.2 Testing for Bio hoods,

• Non-viable particle counting – performed in accordance with ISO 14644-1 or EC Annex 1, and provides a quantitative evaluation of air quality in terms of particulate in the area.

Security Requirements

Access and General Protection/Security Policy and Procedures: All contractor and all associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Person Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

For contractors who do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum."

Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language:

"All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes."

For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05 and Homeland Security Presidential Directive-12 (HSPD-12). Proposed language: “The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.”

Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training."

Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or the facility security office for access when required. (Use when security clearances are not required, i.e. facility repair or construction). Proposed language:

"All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas."

Performance Requirements The Performance Requirement Summary is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance that will be used to validate and inspect these performance elements.

In evaluating the quality of contractor’s performance, the following performance ratings will be used.

Performance Rating

Criteria

Excellent / Outstanding

Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Good Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

4.1 Performance Requirement Summary (PRS)

Statements Standards/AQLs Inspections Incentive

/Disincentive The Contractor shall perform annual recertifications according to safety requirements on Fume hoods, bio safety hoods / cabinets, and snorkels.

Deliverables:

1 Reports detailing recertification for each hood or snorkel.

a) Recertification of hoods and snorkels according to each manufacturer’s manual.

AQL: Proof of re-certification of each hood and snorkel.

What: Perform annual testing and certification on each hood / snorkel.

How: Customer feedback Who: Technical POC and COR Standard(s):

Standards apply to all inspections

Rate contractor performance according to rating table.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 1001 N/A N/A N/A N/A 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 2001 N/A N/A N/A N/A 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 3001 N/A N/A N/A N/A 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 4001 N/A N/A N/A N/A 4001AA Destination Government Destination Government 4001AB Destination Government Destination Government 5001 N/A N/A N/A N/A 5001AA Destination Government Destination Government 5001AB Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA POP 01-JUN-2024 TO

31-MAY-2025

N/A PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-3835

W81EWF

0001AB POP 01-JUN-2024 TO

31-MAY-2025

N/A (SAME AS PREVIOUS LOCATION)

1001 N/A N/A N/A N/A

1001AA POP 01-JUN-2025 TO

31-MAY-2026

N/A PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-3835

1001AB POP 01-JUN-2025 TO

31-MAY-2026

N/A (SAME AS PREVIOUS LOCATION)

2001 N/A N/A N/A N/A

2001AA POP 01-JUN-2026 TO

31-MAY-2027

N/A PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-3835

2001AB POP 01-JUN-2026 TO

31-MAY-2027

N/A (SAME AS PREVIOUS LOCATION)

3001 N/A N/A N/A N/A

3001AA POP 01-JUN-2027 TO

31-MAY-2028

N/A PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-3835

3001AB POP 01-JUN-2027 TO

31-MAY-2028

N/A (SAME AS PREVIOUS LOCATION)

4001 N/A N/A N/A N/A

4001AA POP 01-JUN-2028 TO

31-MAY-2029

N/A PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-3835

4001AB POP 01-JUN-2028 TO

31-MAY-2029

N/A (SAME AS PREVIOUS LOCATION)

5001 N/A N/A N/A N/A

5001AA POP 01-JUN-2029 TO

31-DEC-2029

N/A PR W2R2 USA ENGR R AND D CTR

KAYLEY LABER

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-3835

5001AB POP 01-JUN-2029 TO

31-DEC-2029

N/A (SAME AS PREVIOUS LOCATION)

Section G - Contract Administration Data

ADMIN DATA

CONTRACTING POC:

Contract Specialist Amanda Andrews Phone: 601-634-5249 Email: Amanda.Andrews@usace.army.mil

Contracting Officer Sonia Boyd Phone: 601-751-0822 Email: Sonia.J.Boyd@usace.army.mil

CONTRACTING OFFICER REPRESENTATIVE:

TBD

DELIVERY ADDRESS:

TBD

INVOICE INSTRUCTIONS:

(1) A PROPER INVOICE MUST BE IN ACCORDANCE WITH FAR 32.905 (b)(1), OR INVOICE INSTRUCTIONS CONTAINED ELSEWHERE IN THIS DOCUMENT (such as 52.212-4(g))

(2) SUBMIT INVOICE TO: CEFC.CEFC-payments@usace.army.mil

TO AVOID DELAY IN PAYMENT A COPY MUST ALSO BE SENT TO THE POC AT:

TBD

(3) IF MORE THAN ONE INVOICE IS REQUIRED, THE CONTRACTOR’S FINAL INVOICE SHALL BE

SUBMITTED WITHIN 45 DAYS AFTER THE FINAL PERIOD OF PERFORMANCE DATE SPECIFIED IN

THE CONTRACT. THE INVOICE MUST BE CLEARLY MARKED “FINAL” AND SUBMITTED AS

OUTLINED ABOVE. IN ADDITION A COPY MUST BE SENT TO:

Amanda.Andrews@usace.army.mil

Only a warranted Contracting Officer acting within his or her appointed limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer will be at the Contractor's own risk.

mailto:Amanda.Andrews@usace.army.mil mailto:CEFC.CEFC-payments@usace.army.mil mailto:Amanda.Andrews@usace.army.mil

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-13 System for Award Management Maintenance OCT 2018 52.212-1 Instructions to Offerors--Commercial Products and

Commercial Services

SEP 2023

52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services

NOV 2023

52.223-10 Waste Reduction Program MAY 2011 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Lowest Price and

2. Technically Acceptable

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

1. Technically Acceptable is defined as the documented ability to meet the minimum requirements as specifiied in the solicitation and the attached Description of Requirements, including evidence of the offeror’s ability to provide the items specified and the ability to meet or exceed the specified delivery schedule. It is imperatice that the offeror submit sufficient documentation and information for the Government to determine technical acceptability and quoted price. Failure to submit sufficient information for the Government to determine technical acceptability and quoted price may be cause for rejection of your quote.

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004s) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

___ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community--see FAR 3.900(a).

X (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (6) [Reserved]

___ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub.

L. 111-117, section 743 of Div. C).

___ (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).

___ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders--Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115-390, title II).

___ (11)(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition. (DEC 2023) (Pub. L.

115-390, title II).

___ (ii) Alternate I (DEC 2023) of 52.204-30.

___ (12) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).

___ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

____ (14) [Reserved]

X (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).

____ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (17) [Reserved]

____ (18)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-6.

____ (19)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-7.

____ (20) 52.219-8, Utilization of Small Business Concerns (SEP 2023) (15 U.S.C. 637(d)(2) and (3)).

____ (21)(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (NOV 2016) of 52.219-9.

____ (iii) Alternate II (NOV 2016) of 52.219-9.

____ (iv) Alternate III (JUN 2020) of 52.219-9.

____ (v) Alternate IV (SEP 2023) of 52.219-9.

____ (22) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

____ (ii) Alternate I (MAR 2020) of 52.219-13.

____ (23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

____ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

____ (25) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) (15 U.S.C.

657f).

X (26) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2023) (15 U.S.C. 632(a)(2)).

____ (ii) Alternate I (MAR 2020) of 52.219-28.

____ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

____ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

____ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

____ (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

X (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

____ (32) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (NOV 2023) (E.O. 13126).

X (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (34)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

____ (ii) Alternate I (FEB 1999) of 52.222-26.

____ (35)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

____ (ii) Alternate I (JUL 2014) of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .