Attachment_01_Description_of_Requirement.pdf

PDF 130 KB Posted

Attached to
Front-End Loader with Bucket and Forks Federal contract opportunity
Solicitation number
W912HZ17Q9229
Issued by
Department of the Army Corps of Engineers Engineering District Vicksburg

About this file

Attachment 01_Description of Requirement

View the file

Other files for this federal contract opportunity

Other files attached to Front-End Loader with Bucket and Forks, newest first.
File Type Posted
Attachment_02_Quote_Submission_Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description of Requirement

Background The Airfields and Pavements Branch (APB), Geotechnical and Structures Laboratory (GSL) of the US Army Engineer Research and Development Center (ERDC), Vicksburg, MS, has been tasked by the US Air Force Civil Engineer Center (AFCEC) to support Airfield Damage Repair (ADR), projects by purchasing a new front end loader to serve as the prime mover for a F‐15E load cart. Since the F‐15E load cart requires a 35,235 lb load, a front end loader with the requirements listed is required.

Requirements for a new (not used) front end loader:

Engine net power shall be at least 167 hp

Wheel base shall be at least 9.9 ft and not more than 10.7 ft

Operating weight must be between 30,535 to 36,500 lbs

Single joystick control

Turf‐type tires

Enclosed cab with climate control

Hydraulic quick attach capability to add and remove attachments easily

Fork attachment

Compatible general purpose bucket with bolt‐on edges, should be at least 3 yd3 capacity bucket

Delivery:

The equipment must be delivered to the following location no later than 45 days after contract award:

Engineer Research and Development Center (ERDC) 3909 Halls Ferry Road Vicksburg, MS 39180-6199

File details come from the government source that posted it. Updated .