This is an Abstract of Offers for a federal dredging and pipeline management solicitation issued by the U.S. Army Corps of Engineers, Galveston District. The solicitation number is W912HY26BA021, issued on 09/10/2026 with bids opened on 10/19/2026. The project, titled "FY26 GIWW Freeport to Matagorda Bay Maintenance Dredging," encompasses a comprehensive waterway maintenance program with a base schedule and six optional tasks.
The government estimate for the complete scope (Schedule 1 and all options) totals $15,448,947.00. Five contractors submitted bids: Breakwater Buyer (Other than Small Business) at $22,674,326.20; Callan Marine (Other than Small Business) at $30,264,405.00; Inland Dredging (Other than Small Business) at $15,204,775.00; Muddy Water (Small Business HUBZone) at $19,776,780.00; and Orion Marine (Other than Small Business) at $16,540,200.00. Inland Dredging is identified as the apparent low bidder at 1.58 percent below the government estimate. The work includes mobilization and demobilization, pipeline management services across multiple sections, dredging operations throughout the Galveston Intracoastal Waterway and associated waterways (measured in cubic yards at varying unit prices), and endangered species monitoring. The contract structure features Schedule 1 as the base requirement totaling $11,341,280.00 in government estimate, with Options 1 through 6 providing additional work phases for alternative dredging locations and placement sites ranging from $139,600 to $632,340 individually.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT ESTIMATED
PRICE AMOUNT
1 JOB $2,104,200.00 2,104,200.00$
1 JOB $1,033,900.00 1,033,900.00$
295,000 CY $9.53 2,811,350.00$
48,000 CY $8.00 384,000.00$
26,000 CY $6.33 164,580.00$
102,000 CY $9.94 1,013,880.00$
97,000 CY $13.76 1,334,720.00$
110,000 CY $10.30 1,133,000.00$
36,000 CY $7.70 277,200.00$
11,000 CY $8.17 89,870.00$
8,000 CY $13.80 110,400.00$
67,000 CY $8.04 538,680.00$
20,000 CY $13.72 274,400.00$
1 JOB $71,100.00 71,100.00$
11,341,280.00$
1 JOB $139,600.00 139,600.00$
1 JOB $185,600.00 185,600.00$
496,000 CY $3.62 1,795,520.00$
2,120,720.00$
13,462,000.00$
1 JOB $139,500.00 139,500.00$
1 JOB $106,100.00 106,100.00$
17,100 CY $12.87 220,077.00$
465,677.00$
13,927,677.00$
Dredging - GIWW San Bernard River to Colorado River, Section No. 20
0011 Dredging - Colorado River Crossing, Section No. 21
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 25
Dredging - GIWW Colorado River to Matagorda Bay, Section Nos. 23-24
OPTION 1
0015 Mobilization and Demobilization
TOTAL OPTION 1
0016 Pipeline Management - Section Nos. 26-32 0017 Dredging - Channel to Palacios, Section Nos. 26-32
TOTAL SCHEDULE 1 AND OPTION 1
Pipeline Management - Sec No. 1-21, 23-56 Dredging - GIWW Freeport Harbor to Brazos River, Sec Nos. 1-5
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 11-14
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 15-18
Mobilization and Demobilization
TOTAL SCHEDULE 1
0004 Dredging - Brazos River Crossing, Sec No. 6
Dredging - GIWW Brazos River to San Bernard River, Section No. 7
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 8-10
Dredging - GIWW San Bernard River to Colorado River, Section No. 19
0014 Endangered Species Monitoring
ABSTRACT OF OFFERS
Solicitation No.: W912HY26BA021 Date Issued: 09/10/2026 Date Opened: 10/19/2026 Issuing Office: USAED- Galveston
Project Title: FY26 GIWW Freeport to Matagorda Bay Maintenance Dredging
Number of Amendments Issued: 3 GOVERNMENT ESTIMATE (Without Profit)
NO.
ESTIMATED
DESCRIPTION QUANTITY
ITEM
OPTION 2
0018 Mobilization and Demobilization
0019 Pipeline Management - Section Nos. CO 1 - CO 2
Dredging - Colorado River Channel, Section Nos. CO
1 - CO 2
TOTAL OPTION 2
TOTAL SCHEDULE 1 AND OPTION 1 & 2
1 JOB $50,400.00 50,400.00$
2,100 CY $8.62 18,102.00$
68,502.00$
13,996,179.00$
1 JOB $69,000.00 69,000.00$
2,400 CY $7.57 18,168.00$
87,168.00$
14,083,347.00$
1 JOB $273,100.00 273,100.00$
28,000 CY $12.83 359,240.00$
632,340.00$
14,715,687.00$
1 JOB $291,700.00 291,700.00$
28,000 CY $15.77 441,560.00$
733,260.00$
15,448,947.00$
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, 4, & 5
OPTION 6
Pipeline Management - Section No. 22 - Placement at Mad Island WMA BU Site
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 22
TOTAL OPTION 6
TOTAL SCHEDULE 1 AND OPTION 1 thru 6
OPTION 3
0021 Pipeline Management - Section No. 33
Dredging - Brazos River Floodgates Boathouse and Entrance Channel, Section No. 33
TOTAL OPTION 3
TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3
TOTAL OPTION 4
OPTION 4
0023 Pipeline Management - Section No. 34
Dredging - Colorado River Locks Boathouse and Entrance Channel, Section No. 34
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED TO THIS
SOLICITATION.
Mirian Tudor Contracting Officer
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4
OPTION 5
Pipeline Management - Section No. 22 - Placement at
PA 109
*The apparent low bidder, Inland Dredging Co, is 1.58% lower than the Government Estimate.
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 22
TOTAL OPTION 5
1 JOB $3,056,446.17 3,056,446.17$
1 JOB $212,750.00 212,750.00$
295,000 CY $10.40 3,068,000.00$
48,000 CY $9.18 440,640.00$
26,000 CY $20.67 537,420.00$
102,000 CY $17.97 1,832,940.00$
97,000 CY $23.22 2,252,340.00$
110,000 CY $17.28 1,900,800.00$
36,000 CY $12.11 435,960.00$
11,000 CY $19.56 215,160.00$
8,000 CY $26.75 214,000.00$
67,000 CY $8.26 553,420.00$
20,000 CY $37.29 745,800.00$
1 JOB $138,000.03 138,000.03$
15,603,676.20$
1 JOB $106,375.00 106,375.00$
1 JOB $212,750.00 212,750.00$
496,000 CY $7.41 3,675,360.00$
3,994,485.00$ 19,598,161.20$
1 JOB $106,375.00 106,375.00$
1 JOB $212,750.00 212,750.00$
17,100 CY $12.80 218,880.00$
538,005.00$
20,136,166.20$
1 JOB $212,750.00 212,750.00$
2,100 CY $50.00 105,000.00$
317,750.00$
20,453,916.20$
1 JOB $212,750.00 212,750.00$
2,400 CY $50.00 120,000.00$
332,750.00$
20,786,666.20$
Dredging - Colorado River Crossing, Section No. 21
Dredging - GIWW San Bernard River to Colorado
OPTION 1
Dredging - GIWW Colorado River to Matagorda Bay, 0010 Dredging - GIWW San Bernard River to Colorado
DESCRIPTION
Mobilization and Demobilization
Issuing Office: USAED-Galveston Offeror #1 : Breakwater Buyer Business Size: Other than Small Business
ESTIMATED
QUANTITY
Dredging - GIWW Colorado River to Matagorda Bay, Endangered Species Monitoring
TOTAL SCHEDULE 1
Pipeline Management - Sec No. 1-21, 23-56 Dredging - GIWW Freeport Harbor to Brazos River, 0004 Dredging - Brazos River Crossing, Sec No. 6 0005 Dredging - GIWW Brazos River to San Bernard River, 0006 Dredging - GIWW San Bernard River to Colorado
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 11-14
0008 Dredging - GIWW San Bernard River to Colorado
ITEM
NO.
Solicitation No.: W912HY26BA021 Date Issued: 09/10/2026 Date Opened: 10/19/2026
Mobilization and Demobilization
Mobilization and Demobilization Pipeline Management - Section Nos. CO 1 - CO 2
Dredging - Colorado River Channel, Section Nos. CO
1 - CO 2
TOTAL OPTION 2
TOTAL SCHEDULE 1 AND OPTION 1
Dredging - Channel to Palacios, Section Nos. 26-32
TOTAL OPTION 1
0016 Pipeline Management - Section Nos. 26-32
TOTAL SCHEDULE 1 AND OPTION 1 & 2
OPTION 2
OPTION 3
0021 Pipeline Management - Section No. 33
Dredging - Brazos River Floodgates Boathouse and Entrance Channel, Section No. 33
TOTAL OPTION 3
TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3
OPTION 4
0023 Pipeline Management - Section No. 34
Dredging - Colorado River Locks Boathouse and Entrance Channel, Section No. 34
TOTAL OPTION 4
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4
1 JOB $212,750.00 212,750.00$
28,000 CY $19.22 538,160.00$
750,910.00$ 21,537,576.20$
1 JOB $212,750.00 212,750.00$
28,000 CY $33.00 924,000.00$
1,136,750.00$
22,674,326.20$
OPTION 5
Pipeline Management - Section No. 22 - Placement at
PA 109
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 22
TOTAL OPTION 5
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, 4, & 5
OPTION 6
Pipeline Management - Section No. 22 - Placement at Mad Island WMA BU Site
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 22
TOTAL OPTION 6
TOTAL SCHEDULE 1 AND OPTION 1 thru 6
1 JOB $3,375,000.00 3,375,000.00$
1 JOB $3,100,000.00 3,100,000.00$
295,000 CY $20.50 6,047,500.00$
48,000 CY $20.50 984,000.00$
26,000 CY $20.50 533,000.00$
102,000 CY $20.50 2,091,000.00$
97,000 CY $20.50 1,988,500.00$
110,000 CY $20.50 2,255,000.00$
36,000 CY $20.50 738,000.00$
11,000 CY $20.50 225,500.00$
8,000 CY $20.50 164,000.00$
67,000 CY $20.50 1,373,500.00$
20,000 CY $20.50 410,000.00$
1 JOB $70,000.00 70,000.00$
23,355,000.00$
1 JOB $400,000.00 400,000.00$
1 JOB $275,000.00 275,000.00$
496,000 CY $7.50 3,720,000.00$
4,395,000.00$ 27,750,000.00$
1 JOB $510,000.00 510,000.00$
1 JOB $70,000.00 70,000.00$
17,100 CY $19.55 334,305.00$
914,305.00$
28,664,305.00$
1 JOB $90,000.00 90,000.00$
2,100 CY $45.00 94,500.00$
184,500.00$
28,848,805.00$
1 JOB $110,000.00 110,000.00$
Solicitation No.: W912HY26BA021 Date Issued: 09/10/2026 Date Opened: 10/19/2026
Issuing Office: USAED-Galveston Offeror #2 : Callan Marine Business Size: Other than Small Business
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization 0002 Pipeline Management - Sec No. 1-21, 23-56 0003 Dredging - GIWW Freeport Harbor to Brazos River, 0004 Dredging - Brazos River Crossing, Sec No. 6 0005 Dredging - GIWW Brazos River to San Bernard River, Dredging - GIWW San Bernard River to Colorado River, Section Nos. 8-10
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 11-14
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 15-18
0009 Dredging - GIWW San Bernard River to Colorado 0010 Dredging - GIWW San Bernard River to Colorado 0011 Dredging - Colorado River Crossing, Section No. 21 0012 Dredging - GIWW Colorado River to Matagorda Bay, 0013 Dredging - GIWW Colorado River to Matagorda Bay, 0014 Endangered Species Monitoring
TOTAL SCHEDULE 1
OPTION 1
0015 Mobilization and Demobilization
0016 Pipeline Management - Section Nos. 26-32 0017 Dredging - Channel to Palacios, Section Nos. 26-32
TOTAL OPTION 1
0019 Pipeline Management - Section Nos. CO 1 - CO 2
Dredging - Colorado River Channel, Section Nos. CO
1 - CO 2
TOTAL OPTION 2
TOTAL SCHEDULE 1 AND OPTION 1 & 2
OPTION 3
0021 Pipeline Management - Section No. 33
Dredging - Brazos River Floodgates Boathouse and Entrance Channel, Section No. 33
TOTAL OPTION 3
TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3
0023 Pipeline Management - Section No. 34
2,400 CY $46.50 111,600.00$
221,600.00$
29,070,405.00$
1 JOB $100,000.00 100,000.00$
28,000 CY $17.75 497,000.00$
597,000.00$ 29,667,405.00$
1 JOB $100,000.00 $100,000.00
28,000 CY $17.75 497,000.00$
$597,000.00
$30,264,405.00
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4
OPTION 5
Pipeline Management - Section No. 22 - Placement at
PA 109
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 22
TOTAL OPTION 5
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, 4, & 5
Dredging - Colorado River Locks Boathouse and Entrance Channel, Section No. 34
OPTION 6
Pipeline Management - Section No. 22 - Placement at Mad Island WMA BU Site
Dredging - GIWW Colorado River to Matagorda Bay, 1 JOB $2,400,000.00 2,400,000.00$
1 JOB $1,800,000.00 1,800,000.00$
295,000 CY $7.00 2,065,000.00$
48,000 CY $9.00 432,000.00$
26,000 CY $9.00 234,000.00$
102,000 CY $9.00 918,000.00$
97,000 CY $10.00 970,000.00$
110,000 CY $8.00 880,000.00$
36,000 CY $9.00 324,000.00$
11,000 CY $11.00 121,000.00$
8,000 CY $16.00 128,000.00$
67,000 CY $9.00 603,000.00$
20,000 CY $15.00 300,000.00$
1 JOB $70,000.00 70,000.00$
11,245,000.00$
1 JOB $250,000.00 250,000.00$
1 JOB $250,000.00 250,000.00$
496,000 CY $3.25 1,612,000.00$
2,112,000.00$ 13,357,000.00$
1 JOB $250,000.00 250,000.00$
1 JOB $200,000.00 200,000.00$
17,100 CY $16.00 273,600.00$
723,600.00$
14,080,600.00$
1 JOB $73,500.00 73,500.00$
2,100 CY $15.75 33,075.00$
106,575.00$ 14,187,175.00$
1 JOB $97,800.00 97,800.00$
2,400 CY $15.75 37,800.00$
135,600.00$ 14,322,775.00$
Solicitation No.: W912HY26BA021 Date Issued: 09/10/2026 Date Opened: 10/19/2026
Offeror #3 : Inland Dredging Business Size: Other than Small Business
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization 0002 Pipeline Management - Sec No. 1-21, 23-56 0003 Dredging - GIWW Freeport Harbor to Brazos River, 0004 Dredging - Brazos River Crossing, Sec No. 6 0005 Dredging - GIWW Brazos River to San Bernard River, Dredging - GIWW San Bernard River to Colorado River, Section Nos. 8-10
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 11-14
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 15-18
0009 Dredging - GIWW San Bernard River to Colorado 0010 Dredging - GIWW San Bernard River to Colorado 0011 Dredging - Colorado River Crossing, Section No. 21 0012 Dredging - GIWW Colorado River to Matagorda Bay, 0013 Dredging - GIWW Colorado River to Matagorda Bay, 0014 Endangered Species Monitoring
TOTAL SCHEDULE 1
OPTION 1
0015 Mobilization and Demobilization
0016 Pipeline Management - Section Nos. 26-32 0017 Dredging - Channel to Palacios, Section Nos. 26-32
0019 Pipeline Management - Section Nos. CO 1 - CO 2
Dredging - Colorado River Channel, Section Nos. CO
1 - CO 2
TOTAL OPTION 2
TOTAL SCHEDULE 1 AND OPTION 1 & 2
OPTION 3
0021 Pipeline Management - Section No. 33 0022 Dredging - Brazos River Floodgates Boathouse and
TOTAL OPTION 3
TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3
OPTION 4
Channel, Section No. 34
1 JOB $50,000.00 50,000.00$
28,000 CY $9.00 252,000.00$
302,000.00$ 14,624,775.00$
1 JOB $300,000.00 300,000.00$
28,000 CY $10.00 280,000.00$
580,000.00$ 15,204,775.00$
0025 Pipeline Management - Section No. 22 - Placement at
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, 4, & 5
OPTION 6
0027 Pipeline Management - Section No. 22 - Placement at
1 JOB $3,080,000.00 3,080,000.00$
1 JOB $200,000.00 200,000.00$
295,000 CY $8.06 2,377,700.00$
48,000 CY $7.33 351,840.00$
26,000 CY $10.15 263,900.00$
102,000 CY $13.80 1,407,600.00$
97,000 CY $18.14 1,759,580.00$
110,000 CY $15.00 1,650,000.00$
36,000 CY $9.78 352,080.00$
11,000 CY $13.71 150,810.00$
8,000 CY $17.11 136,880.00$
67,000 CY $13.13 879,710.00$
20,000 CY $23.55 471,000.00$
1 JOB $150,000.00 150,000.00$
13,231,100.00$
1 JOB $176,000.00 176,000.00$
1 JOB $100,000.00 100,000.00$
496,000 CY $5.61 2,782,560.00$
3,058,560.00$
16,289,660.00$
1 JOB $616,000.00 616,000.00$
1 JOB $350,000.00 350,000.00$
17,100 CY $17.00 290,700.00$
1,256,700.00$
17,546,360.00$
1 JOB $100,000.00 100,000.00$
2,100 CY $19.00 39,900.00$
139,900.00$
17,686,260.00$
1 JOB $125,000.00 125,000.00$
2,400 CY $19.00 45,600.00$
Solicitation No.: W912HY26BA021 Date Issued: 09/10/2026 Date Opened: 10/19/2026
Offeror #4 : Muddy Water Business Size: Small Business (HUBZone)
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization 0002 Pipeline Management - Sec No. 1-21, 23-56 0003 Dredging - GIWW Freeport Harbor to Brazos River, 0004 Dredging - Brazos River Crossing, Sec No. 6 0005 Dredging - GIWW Brazos River to San Bernard River, Dredging - GIWW San Bernard River to Colorado River, Section Nos. 8-10
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 11-14
Dredging - GIWW San Bernard River to Colorado River, Section Nos. 15-18
0009 Dredging - GIWW San Bernard River to Colorado 0010 Dredging - GIWW San Bernard River to Colorado 0011 Dredging - Colorado River Crossing, Section No. 21 0012 Dredging - GIWW Colorado River to Matagorda Bay, 0013 Dredging - GIWW Colorado River to Matagorda Bay, 0014 Endangered Species Monitoring
TOTAL SCHEDULE 1
OPTION 1
0015 Mobilization and Demobilization
0016 Pipeline Management - Section Nos. 26-32
0017 Dredging - Channel to Palacios, Section Nos. 26-32
0019 Pipeline Management - Section Nos. CO 1 - CO 2
Dredging - Colorado River Channel, Section Nos. CO
1 - CO 2
TOTAL OPTION 2
TOTAL SCHEDULE 1 AND OPTION 1 & 2
OPTION 3
0021 Pipeline Management - Section No. 33
Dredging - Brazos River Floodgates Boathouse and Entrance Channel, Section No. 33
TOTAL OPTION 3
TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3
OPTION 4
0023 Pipeline Management - Section No. 34
Dredging - Colorado River Locks Boathouse and Entrance
170,600.00$ 17,856,860.00$
1 JOB $100,000.00 100,000.00$
28,000 CY $15.71 439,880.00$
539,880.00$ 18,396,740.00$
1 JOB $500,000.00 500,000.00$
28,000 CY $31.43 880,040.00$
1,380,040.00$
19,776,780.00$
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4
OPTION 5
Pipeline Management - Section No. 22 - Placement at
PA 109
Dredging - GIWW Colorado River to Matagorda Bay, Section No. 22
TOTAL OPTION 5
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, 4, & 5
OPTION 6
Pipeline Management - Section No. 22 - Placement at Mad Island WMA BU Site
Dredging - GIWW Colorado River to Matagorda Bay, 1 JOB $1,200,000.00 1,200,000.00$
1 JOB $750,000.00 750,000.00$
295,000 CY $10.00 2,950,000.00$
48,000 CY $7.50 360,000.00$
26,000 CY $10.00 260,000.00$
102,000 CY $12.50 1,275,000.00$
97,000 CY $17.25 1,673,250.00$
110,000 CY $17.25 1,897,500.00$
36,000 CY $9.50 342,000.00$
11,000 CY $9.50 104,500.00$
8,000 CY $14.00 112,000.00$
67,000 CY $11.25 753,750.00$
20,000 CY $27.00 540,000.00$
1 JOB $20,000.00 20,000.00$
12,238,000.00$
1 JOB $120,000.00 120,000.00$
1 JOB $140,000.00 140,000.00$
496,000 CY $4.75 2,356,000.00$
2,616,000.00$
14,854,000.00$
1 JOB 110000.00 110,000.00$
1 JOB 75,000.00$ 75,000.00$
17,100 CY 12.00$ 205,200.00$
390,200.00$
15,244,200.00$
1 JOB $20,000.00 20,000.00$
2,100 CY $50.00 105,000.00$
125,000.00$ 15,369,200.00$
1 JOB $20,000.00 20,000.00$
2,400 CY $50.00 120,000.00$
140,000.00$ 15,509,200.00$
1 JOB $137,500.00 137,500.00$
28,000 CY $13.50 378,000.00$
515,500.00$ 16,024,700.00$
1 JOB 137500.00 137,500.00$
28,000 CY 13.50$ 378,000.00$
OPTION 6
0027 Pipeline Management - Section No. 22 - Placement at
0025 Pipeline Management - Section No. 22 - Placement at
TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, 4, & 5
TOTAL OPTION 4
0021 Pipeline Management - Section No. 33 0022 Dredging - Brazos River Floodgates Boathouse and
TOTAL OPTION 3
TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3
TOTAL OPTION 2
TOTAL SCHEDULE 1 AND OPTION 1 & 2
OPTION 3
OPTION 2
0018 Mobilization and Demobilization 0019 Pipeline Management - Section Nos. CO 1 - CO 2 0020 Dredging - Colorado River Channel, Section Nos. CO
0017 Dredging - Channel to Palacios, Section Nos. 26-32
OPTION 1
0015 Mobilization and Demobilization 0016 Pipeline Management - Section Nos. 26-32
0012 Dredging - GIWW Colorado River to Matagorda Bay, 0013 Dredging - GIWW Colorado River to Matagorda Bay, 0014 Endangered Species Monitoring
TOTAL SCHEDULE 1
0007 Dredging - GIWW San Bernard River to Colorado 0008 Dredging - GIWW San Bernard River to Colorado 0009 Dredging - GIWW San Bernard River to Colorado 0010 Dredging - GIWW San Bernard River to Colorado 0011 Dredging - Colorado River Crossing, Section No. 21
0002 Pipeline Management - Sec No. 1-21, 23-56 0003 Dredging - GIWW Freeport Harbor to Brazos River, 0004 Dredging - Brazos River Crossing, Sec No. 6 0005 Dredging - GIWW Brazos River to San Bernard River, 0006 Dredging - GIWW San Bernard River to Colorado
Offeror #5 : Orion Marine Business Size: Other than Small Business
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization
Solicitation No.: W912HY26BA021 Date Issued: 09/10/2026 Date Opened: 10/19/2026
515,500.00$ 16,540,200.00$ TOTAL SCHEDULE 1 AND OPTION 1 thru 6
| ABSTRACT_W912HY26BA021 IGE |
| Page 1 |
| ABSTRACT_W912HY26BA021 Breakwater Buyer |
| Page 1 |
| ABSTRACT_W912HY26BA021 Callan Marine |
| Page 1 |
| ABSTRACT_W912HY26BA021 Inland Dredging |
| Page 1 |
| ABSTRACT_W912HY26BA021 Muddy Water |
| Page 1 |
| ABSTRACT_W912HY26BA021 Orion Marine |
| Page 1 |
| 2026-10-20T17:53:10-0500 | |
| TUDOR.MIRIAN.ROSA.1069051800 |